Student projects
Student projects
Every Skill-Lync course ends in real engineering work.
80,401–80,500 of 1,77,222
- Underbody CoatingNiravkumar VasavaBIMChallenge · Sept 2022
- Week 3 Challenge : CFD meshing on TurbochargerMohit JainChallenge · Sept 2022
- Week 8 - Challenge 3 - Coin Holder DesignJishnu HaridasChallenge · Sept 2022
- Project - Speed Control of a Direct Current (DC) motorNandeesh BhatiaChallenge · Sept 2022
- Week 8 - Challenge 3 - Coin Holder DesignShubham GolhaniChallenge · Sept 2022
- Creating Walls, Partition walls and Floors for a residential layout using REVITMarimuthu MuruganChallenge · Sept 2022
- Week 8-3D Tetra Meshing ChallengeSooraj V SChallenge · Sept 2022
- Project 1 - Parsing NASA thermodynamic dataShruti JadhavMATLABChallenge · Sept 2022
- Week 5 - Rayleigh Taylor InstabilityManjit PantChallenge · Sept 2022
- Design of Shallow Foundation (Isolated Footings)Vividh BhartiChallenge · Sept 2022
- Coin Holder DesignMukesh SDESIGNChallenge · Sept 2022
- Creation of geometries by Coordinate system methods using AutoCadPrashant TelangChallenge · Sept 2022
- Section Modulus calculation and optimizationPeter ShanthkumarChallenge · Sept 2022
- Week 14 challengeKarthik HnChallenge · Sept 2022
- Week 1 ChallengeShyam DattaChallenge · Sept 2022
- Challenge 8 : Concept Modeling of SeatsDeepak Kumar PawarDESIGNChallenge · Sept 2022
- Roof challengePari ChakaravarthiChallenge · Sept 2022
- ProjectJatin Jitendra SonkarChallenge · Sept 2022
- Introduction to REVIT conceptsPiyushkumar Bharatbhai ParmarREVITChallenge · Sept 2022
- Week 10 ChallengeBairi Sahithi ReddyChallenge · Sept 2022
- Week 3 - External flow simulation over an Ahmed body.Subhankar BagChallenge · Sept 2022
- BenchmarkingMahizhan SFEAChallenge · Sept 2022
- Photo Realistic RenderingGopikrishnan NatesanChallenge · Sept 2022
- Project - Data Handling and InterpolationPratik JoshiChallenge · Sept 2022
- Week - 8 - MorphingMukesh Kumar BaraikChallenge · Sept 2022
- Week 7 ChallengeChatrapathi Krishnaji ChitturiChallenge · Sept 2022
- Week 8 - Challenge 2 - Switch Bezel DesignMangesh GhormareChallenge · Sept 2022
- Week 1- Mixing TeeS KanagasabapathyCAECFDChallenge · Sept 2022
- Week 3 - External flow simulation over an Ahmed body.Balaji RachamaduguChallenge · Sept 2022
- Week -2Vijaya Kumar GajulaChallenge · Sept 2022
- Project - Data Handling and InterpolationManish MaliChallenge · Sept 2022
- Design of backdoorMangillipally JhansiDESIGNChallenge · Sept 2022
- Week 5.1 - Mid term project - Solving the steady and unsteady 2D heat conduction problemJaya PrakashMATLABChallenge · Sept 2022
- Week 3 - External flow simulation over an Ahmed body.Sachin BrittoChallenge · Sept 2022
- Week 9 - Attachment Feature Creation - Challenge 2Akash AgarwalChallenge · Sept 2022
- Project 1 _Creating an Architectural plan for the provided plot size and develop relevant basic structural drawingsSahili MoreChallenge · Sept 2022
- Week 10: Modeling and Simulation of flow around an Ahmed BodyArun SCFDHTMLChallenge · Sept 2022
- Project 1 Mechanical design of battery packKaushal KumarChallenge · Sept 2022
- Project 2Shubham SharmaChallenge · Sept 2022
- Fender Design - Wheel Arch ChallengeDebashish ParidaChallenge · Sept 2022
- Tool Test 1Deepak KumarChallenge · Sept 2022
- Project 2 - MODELLING, ANALYSIS & DESIGN OF COMPOSITE STUCTURES IN COMFLOR & ETABSRamireddy PathakotaETABSStructural AnalysisChallenge · Sept 2022
- Project 1 - English Dictionary App & Library Book Management SystemAkshaya YalnaikChallenge · Sept 2022
- Project 1Akshay ChaudhariChallenge · Sept 2022
- Reinforcement Detailing of Beams from ETABS outputAkash RajChallenge · Sept 2022
- Week -2Ramesh KChallenge · Sept 2022
- Project 2 - EDA on Vehicle Insurance Customer DataCyrus Daniel GundugolluChallenge · Sept 2022
- Creation of Column Schedule and Drawing Template using AutoCadRajkumar SHTMLChallenge · Sept 2022
- Week 9 - Attachment Feature Creation (Ribs & Screw Boss) - Challenge 1Nitish MoreyChallenge · Sept 2022
- Project 2Siddharth VMATLABChallenge · Sept 2022
- Project 1Suraj ChouriyaChallenge · Sept 2022
- Project 2 - V&V SW Analysis IIKarumuri MarthammaChallenge · Sept 2022
- Project 2 - EDA on Vehicle Insurance Customer DataSurya MChallenge · Sept 2022
- Week 8 - Challenge 4 - BumperJanardhan GonthinaChallenge · Sept 2022
- Project 1Satyabrata RanaChallenge · Sept 2022
- Week 2 Challenge : Surface meshing on a Pressure valveVijaya Madhavan NcANSAChallenge · Sept 2022
- Week 3 Challenge : CFD meshing on TurbochargerHameed PeeranCFDChallenge · Sept 2022
- Design of backdoorUmar ShaDESIGNChallenge · Sept 2022
- Week 3 Challenge : CFD meshing on TurbochargerVijaya Madhavan NcChallenge · Sept 2022
- Week 8 - Challenge 1 - Base Bracket DesignAbhijeet DhotreChallenge · Sept 2022
- Project 2Kunapuli Sai TejaHEVChallenge · Sept 2022
- Week 1 ChallengeSalnang Birch T SangmaStructural AnalysisChallenge · Sept 2022
- Project - Analysis of a practical automotive wiring circuitDeepansh Kumar VatsaChallenge · Sept 2022
- Week 9 - Project 1 - Door Trim Lower with Engineering FeaturesDhananjayan SChallenge · Sept 2022
- Project 1 - 2D meshing on the instrumental PanelLogeshwaran RANSAChallenge · Sept 2022
- Reinforcement detailing of Columns from ETABS outputSuhas B UETABSHTMLChallenge · Sept 2022
- Fender Design ChallengeHarish NChallenge · Sept 2022
- Week 3 ChallengeSuresh Kumar YalangiChallenge · Sept 2022
- Tool Test-2Arjun GhotekarChallenge · Sept 2022
- Week 9 - Attachment Feature Creation - Challenge 2Janardhan GonthinaChallenge · Sept 2022
- Week 8 - Challenge 1 - Base Bracket DesignDeepak SharmaCATIAChallenge · Sept 2022
- Week 8 - Challenge 6 - Core & Cavity DesignMohammed FayizChallenge · Sept 2022
- Project 9Vishnu Murukan .Challenge · Sept 2022
- Creating a Layout, Section and Elevation with dimensions using AutoCadUtkarsh GoelAUTOCADChallenge · Sept 2022
- Project 1 - Creation of user defined data type to implement the user interfaces for working with ‘Set’ (Mathematical Set theory) using Linked ListAshok VermaChallenge · Sept 2022
- Project 2 Adaptive Cruise ControlHimanshu UpadhyayChallenge · Sept 2022
- Project 2Advaith MenonChallenge · Sept 2022
- Introduction to REVIT conceptsVineetha EnukulaBIMREVITChallenge · Sept 2022
- Project 1Srinivas GurleChallenge · Sept 2022
- Week 9 - Project - A pillar Design with Master SectionArshil KumarDESIGNChallenge · Sept 2022
- Creating Architectural and Structural model with 3D rendering using REVITSourav RoyBIMBuildingsChallenge · Sept 2022
- Project 1 Mechanical design of battery packAkash ShendeDESIGNHTMLChallenge · Sept 2022
- Week 5 - Rayleigh Taylor InstabilityHerbert Rathna Singh GCFDChallenge · Sept 2022
- Week 8 - Challenge 4 - BumperRoshan SinghChallenge · Sept 2022
- Creating Levels, Grids, Layout and model elements for a residential unit using REVITTalha SheikhBIMChallenge · Sept 2022
- Project 1 - 2D meshing on the instrumental PanelMukesh Kumar BaraikChallenge · Sept 2022
- Project 2Sharonkumar GoriparthiCATIADESIGNChallenge · Sept 2022
- Week 7 State of charge estimationAmal K SChallenge · Sept 2022
- Week 9 - Project - A pillar Design with Master SectionPratik DhokaleCATIAChallenge · Sept 2022
- Creating Architectural and Structural model with 3D rendering using REVITWaqqas AliChallenge · Sept 2022
- Week 9 ChallengeBairi Sahithi ReddyChallenge · Sept 2022
- Week 9 - Project 1 - Door Trim Lower with Engineering FeaturesVignesh KBIMCAEChallenge · Sept 2022
- Week-11 Challenge: BrakingChoul VikasChallenge · Sept 2022
- Week 8 - Challenge 4 - BumperDhananjayan SChallenge · Sept 2022
- B Pillar - Master Section DevelopmentS Easwaran NamboodiriProject · Sept 2022
- Week 8 - Challenge 1 - Base Bracket DesignDhananjayan SChallenge · Sept 2022
- Project 1 _Creating an Architectural plan for the provided plot size and develop relevant basic structural drawingsVarad BaadkarChallenge · Sept 2022
- Week 8 - Challenge 2 - Switch Bezel DesignS Easwaran NamboodiriCATIAChallenge · Sept 2022
- Week 8 - Challenge 2 - Switch Bezel DesignDhananjayan SChallenge · Sept 2022
- Week 8 - Challenge 2 - Switch Bezel DesignVivek RCATIAChallenge · Sept 2022