Challenge

Usage of Navigation tool , Timeliner and Clash Detection test using Naviswork

1) Use the Architecture/ Structure Project file

developed by you in Week 6 to 8.

Export the Revit architecture and structure model

to Navisworks Cache file following the export

settings discussed in class

PROCEDURE -

-GO TO REVIT FILE

created in ch 6

-goto file > export

-click on NWS FORMAT of file

and save it at desiganated

location .

-now follow this both architectural

and stractural files

-now open navis work software and

appent both file .

-RESLTS -

BOTH FILES EXPORTED IN NAVIS

WORK SOFTWARE

-PLESAE , have a look given below snips

for more clarity .

-2) Use Navigate Tool to walk around the model

and walk through the rooms created and record

your moving as animation in your Navisworks file

PROCEDURE -

-OPEN FILE IN NAVIS WORK MANAGE

-OPEN file .> Architectural NWC format

-goto viewpoint

-click on pan

-click on walk and walk around your

workspace model .

-click on ANIMATION > RECORD VEDIO

and click save view port and walk

around model.

RESULTS -

used navigate tool to walk around

the model

and walk through the rooms created and record

my moving as animation in your Navisworks file

SNIPS -

3) Use Navigate tool to use Realism feature

to walk through the model and record your

moving as animation in Navisworks file

INTRODUCTION -

-Go to view port tab

-click on realism tool

and select third person

-click on walk and move through

the building .

RESULT -

Use Navigate tool to use Realism feature

to walk through the model and

record mymoving as animation

in Navisworks file

-PLESAE , have a look given below snips

for more clarity .

snips -

4) Embed both architecture and structure

*.nwc file to your Navisworks file. Create a clash detection test between the two models
a. Run the Clash Detection Test
b. Study the clashes between the two models
c. List which of the clashes could be approved
d. List which of the clashes could be neglected ( will be taken care later)
e. List which of the clashes can be resolved
f. Save the results after color coding the clashes to the Navisworks file
g. In case of resolution annotate the clash and save the view to defined views in Navisworks

PROCEDURE -

-Open Architectural model

-click append in home tab .

next

-click on home tab > clash detection

next

select add test

-and select one side stractural and

other side architectural

-select next surface

-and run test

-click on status and change status

to resolved or reviewed option .

RESULT

Create a clash detection test between the two models

OF architecture and structure

*.nwc file to my Navisworks file.

SNIPS

5) Using the Timeliner feature in Navisworks

prepare a schedule for the project developed

in week 6 to 8 by adding reasonable

assumptions for task start date and

end date and simulate the task completion

as a visual simulation. Record it

and save the timeline simulation

to Navisworks file

PROCEDURE -

-GO to home tab .

-select time linear option

-click on selection tree in home tab .

-click on add task in timeliner

-add task as per work done

during construction time

-in here frist select type of work

during construction time and than go to

add task

-next add names of diffrent works

like

-footing

-column

-1st floor

-windows

-etc

-next enter dates and time of task .

-next click on simulate and record

vedio.

RESULT

-prepared a schedule for the project developed

in week 6 to 8 by adding reasonable

assumptions for task start date and

end date.

- simulate the task completion

as a visual simulation. Record it

and save the timeline simulation

to Navisworks file

snips-

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.