Project 1 - Design a simple double cleat angle shear connection

Q-Design a simple double cleat angle shear connection to connect (ISMB 500) secondary beam with a primary beam (ISMB 600) in a mezzanine deck of a building to transfer factored shear force of 200 kN. Consider bolt to connect angle cleat with primary as well as secondary beam.

Do manual design and also prepare a spread sheet to design this shear beam-beam connection

Solution :

AIM & INTRODUCTION : Simple double cleat angle shear connection to connect secondary beam with primary beam in mezzanine deck of a building is required to be designed with following inputs-

Secondary Beam : ISMB 500 ,

`t_w = 10.2 mm` '

`t_f= 17.2 mm`

D = 500 mm

`b_f`= 180 mm

Primary Beam : ISMB 600

`t_w = 12 mm

t_f = 20.8 mm`

D = 600 mm

`b_f`= 210 mm

Factored Shear Force : 200 kN

Yield strength of members `f_y`= 250 `N/(mm^2)`

Ultimate strength of plate `f_u = 410 N//mm^2`

Grade of bolt : Design with 4.6 ordinary grade as well as 8.8 HSFG grade bolt

: 400 MPa and 800 MPa

Shear plane : 2 as bolt is in double shear

Assuming diameter of bolt 'd' : 16 mm

Stress Area of bolt : `0.78xx(pi//4)xxd^2` = 156.75 `mm^2`

Minimum pitch distance , p : 2.5x dia of bolt = 40 mm , provide p = 50 mm

Edge distance, e : 30 mm

Diameter of bolt hole '`d_0` : 18 mm

Partial safety factor for bolt material '`gamma_(mb)` = 1.2

DESIGN USING 4.6 GRADE ORDINARY GRADE BOLT

Shear capacity of bolt (in double shear)

Nominal Shear strength of bolt '`V_(nsb) = (A_(nb)xxn_n + n_sxxA_(sb))f_(ub)//sqrt3`

Design Shear strength of bolt ' `V_(dsb) = V_(nsb)//gamma_(mo)`

= `f_u(n_nxxA_(nb)+n_sxxA_(sb))/(sqrt3xxgamma_(mb)`

`n_n=2` ( number of shear plane passing through the thread of the bolt)

`n_s=0` ( number of shear plane passing through the shank of the bolt)

= 156.75x2x 400/1.73x 1.25 = 57988.439 N = 57.988

Cnnection between web cleat and web of the secondary beam

Bearing strength of bolt: `V_(dpb)=V_(npb)/gamma_(mb)= 2.5k_bdtf_u//gamma_(mb)`

where `k_b` is least of the following-

`k_b= e/(3d_o)` = 30 /3x30 = 0.556

`k_b= p/(3d_0)-2.5`= (50/3x18)-0.25 =0.676

`k_b= f_(ub)/f_u` = 400/410 = 0.976

`k_b =1`

therefore `k_b`=0.556

Assuming cleat angle as IAS 110X110X10 where thickness of leg of angle cleat = 10 mm

`V_(dpb)`= 2.5x0.556x 16x10x 410/1.25 = 72947.2 N = 72.947 kN

Strength of bolt is lesser of shear strength and bearing strength.

So strength of bolt = 57.988 kN

Number of bolts required = 200/57.988 = 3.45

Provide 4 bolts of grade 4.6

Cnnection between web cleat and web of the main beam

Main beam is in single shear:

So Shear capacity of bolt in single shear `V_(dsp)`= 57.988/2 = 28.994 kN

Bearing capacity of bolt `V_(dpb)` = 72.947 kN

Bolt value = 28.994kN

Number of bolt required = 200/28.994 = 6.89

Providing 8 Bolts in two column i.e. 4 in each column

Length of cleat angle= 3p+2e

p= 50 mm & e = 30 mm

Length of cleat angle = 3x50+ 2x30 = 210 mm

provide cleat angle of 110x110x10 mm, 225 mm long on each side of web

DESIGN USING 8.8 GRADE HSFG BOLT

Nominal Shear strength of bolt '`V_(nsb) = A_(nb)xxn_sxxf_(ub)//sqrt3`

Design Shear strength of bolt ' `V_(dsb) = V_(nsb)//gamma_(mo)`

= `A_(nb)xxn_sxxf_(ub)//sqrt3xxgamma_(mo)`

= 156.75x2x 800/1.73x 1.25 = 115842.956 N = 115.843 kN

Bearing strength of bolt: `V_(dpb)=V_(npb)/gamma_(mb)= 2.5k_bdtf_u//gamma_(mb)`

where `k_b` is least of the following-

`k_b= e/(3d_o)` = 30 /3x30 = 0.556

`k_b= p/(3d_0)-2.5`= (40/3x18)-0.25 =0.678

`k_b= f_(ub)/f_u` = 400/410 = 0.976

`k_b =1`

therefore `k_b`=0.556

`V_(dpb)`= 2.5x0.556x 16x10x 410/1.25 = 72947.2 N = 72.947 kN

Strength of bolt is lesser of shear strength and bearing strength.

So strength of bolt = 72.947 kN

Number of bolts required = 200/72.947 = 2.74

Provide 3 bolts of grade 8.8

Fronr and Side view of Beam to Beam bolted shear connection using double cleat angle are shown below-

FRONT VIEW

SIDE VIEW

` SIDE VIEW

Shear strength of HSFG bolt

`V_(nGf)=mu_f.n_e.k_h.F_o`

providing HSFG bolts of grade 8.8

`f_(ub)= 800 MPa`

Net tensile stress area of bolt `A_(nb) = 0.78xx pi/4xxd^2`

= 0.78x 3.14/4x 16x16 = 156.75 sqmm

For `Fe 410` grade steel `f_u= 410 MPa`

Slip critical condition:

`F_0= 0.7 f_uxxA_(nb)`= 0.7x800`xx10^-3`x156.75 = 87.78 kN

Slip resistance of the bolts `V_(ds f) =mu_fxxn_exxk_hxxF_0//gamma_(mf)`

= 0.5x1x1x87.78/1.25 = 35.112 kN

Number of bolts = 200/35.112 = 5.7 say 6 bolts

If slip is permitted :

Bearing type connection

`V_(dsb)= A_(nb)xxf_(ub)//sqrt3xxgamma_(mb)`

= 156.75x800/1.732x1.25x1000 = 57.92kN

`V_(dpb)= 2.5.k_b.d.t.f_u//gamma_(mb)`

= 2.5x 0.556x16x10x410/1.25 X1000 = 72.95 kN

Thus, Shear strength of bolt =57.92 kN

Number of bolts = 200/52.92 = 3.78 say 4 bolts

RESULT : Thus beam to beam bolted shear connection using double cleat angle is designed with-

  • 4.6 grade bolt
  • 8.8 grade bolt
  • considering slip resistance of HSFG bolts
  • Spread sheet has also been attached as sheet-1 &2

-------------------------xxxxxxxxxxxxxxxxx END OF CHALLENGE xxxxxxxxxx--------------------------------

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.