Tool Test 1
In this switch model ive faced more complicated issues in bolt arreas that hinged on the flat surface.
i eliminated only the part where the feature is not able to change.
it took me nearly 8 hrs to complete.
In the IGS part ive done it in 6 hrs , midsurfacing is very easy.
meshing took me time to complete, here also somewhere i make some changes in the geometry and but not on the bolt areas which is failing in the quality. because the target length is greater than the feature lenght.