Preparing Schedule & Cost Estimation for a building using REVIT
1)
a. Using 3D model create a section box is BX
b. To create similar doors and windows in a floor plan layout is CS
C. To reduce the thickness of lines visible in plan views is TL
d. To apply override settings to a floor in the model sec tion view is VG (visibility
graphics)
e. To increase the range of visibility in a plan view VR
f. To select the previously selected items ctrl +<
g. To add annotations to the model views DI
h. To bring the model elements in line AL i.To rotate the model elements RO
j. To move an object to another location MO
K. To copy a model elemnent CO
1. To mirror an element about an axis MM m. To create an array of model elements
2)
AIM:
To prepare a shedule of walls, doors windows, material (concrete /wood)
PROCEDURE:
open my previous model go to schedule in the view tab > schedule quantities




3)
AIM:
To prepare room schedule PROCEDURE:
go to view tab > schedule

4)
AIM:
To do the total cost of materials take off
PROCEDURE:
Open the view tab > select the schedule > material take off





5)


6)
WALL:
Wall type
wall thickness wall length wall description wall material
wall height
wall location
material cost
FLOOR:
floor type
floor thickness
floor length
floor width
floor description
floor material material cost
DOOR:
Door type
door width
door height
door material material cost
WINDOW:
window type window width
window height
window material material cost
Table
table length
table width table material
table type
table weight
table cost
BUILDING:
building type
building area
building parameter
building material building volume
building height
building loacation
site value