GATE Civil: Soil Mechanics (phase relations, classification, permeability and seepage, effective stress, compaction, consolidation, shear strength), previous-year questions solved, part 2
Part 2 of 3 of the Soil Mechanics hub: 19 more official GATE CE questions on permeability, seepage and effective stress and consolidation, each solved step by step and checked against the official answer key. Part 1 covers phase relations, index properties and classification, compaction and shear strength and stress paths.
Questions from the ten official GATE CE papers, sessions CE1 and CE2 of GATE 2022 (IIT Kharagpur), 2023 (IIT Kanpur), 2024 (IISc Bengaluru), 2025 (IIT Roorkee) and 2026 (IIT Guwahati); solutions by Skill-Lync. · Updated 17 Nov 2026 · 19 of 45 questions on this page
Arrange USCS soils CH, ML, SP and SW in decreasing order of hydraulic conductivity
Four different soils are classified as CH, ML, SP, and SW, as per the Unified Soil Classification System. Which one of the following options correctly represents their arrangement in the decreasing order of hydraulic conductivity?
- (A)SW, SP, ML, CH
- (B)CH, ML, SP, SW
- (C)SP, SW, CH, ML
- (D)ML, SP, CH, SW
Answer: (A) SW, SP, ML, CH Official key: A
- Decode the symbols: S = sand, W/P = well/poorly graded; M = silt, C = clay, L/H = low/high plasticity (liquid limit below/above 50).
- Hydraulic conductivity is controlled by the size of the pore channels, which scale with the fine end of the grading (, Hazen). Clean sands sit around , silts around and fat clays around or lower.
- So the two sands come first, then the silt ML, and the high-plasticity clay CH is the least pervious: its plate-shaped particles and thick adsorbed water layers leave almost no free flow path.
- Only option (A) has both sands ahead of ML and ML ahead of CH; the official key also ranks the coarser, well-graded SW ahead of SP.
- Answer: (A) SW, SP, ML, CH
Trap: (C) gets the sands right but puts CH above ML. Plasticity lowers permeability; a fat clay is about a thousand times less pervious than a silt.
Falling-head and constant-head tests to IS 2720 (Part 17) are run on borrow-area soils for earth dams and canal linings, so that pervious sand goes to the shell and filters and low-permeability CH/CI clay goes to the impervious core.
How soil suction head and hydraulic conductivity change when soil moisture content increases
Let represent soil suction head and represent hydraulic conductivity of the soil. If the soil moisture content increases, which one of the following statements is TRUE?
- (A) decreases and increases.
- (B) increases and decreases.
- (C)Both and decrease.
- (D)Both and increase.
Answer: (A) decreases and increases Official key: A
- Suction is the capillary pull of the menisci in the pores. In a dry soil, water survives only in the finest pores with tightly curved menisci, so the suction is large. As rises, larger pores fill, the menisci flatten and falls, reaching zero at saturation.
- Flow needs connected water-filled channels. Adding water fills more and wider pores, so the unsaturated conductivity rises steeply towards the saturated value .
- A van Genuchten loam curve shows both trends: from to , falls from 1037 cm to 12 cm while rises from to .
- Answer: (A)
Trap: (B) treats suction like a quantity that grows with water. Suction is highest in the driest soil; it is the reason a dry soil soaks up the first rain so quickly.
Tensiometers and pressure-plate tests are used to measure suction in cut slopes along hill roads and railway cuttings in the Western Ghats and the Himalaya, where loss of suction during the monsoon triggers shallow slides.
Sum of vertical effective stresses at three depths in saturated soil under a standing water column
A soil sample is underlying a water column of height , as shown in the figure. The vertical effective stresses at points A, B, and C are , , and , respectively. Let and be the saturated and submerged unit weights of the soil sample, respectively, and be the unit weight of water. Which one of the following expressions correctly represents the sum ?
- (A)
- (B)
- (C)
- (D)
Answer: (A) Official key: A
- The valve is closed and every standpipe stands at the free water level, so there is no flow: pore pressure is hydrostatic from the water surface.
- A (soil surface): , , so .
- B: , , so .
- C: likewise . The water depth cancels at every point.
- Sum: . Answer: (A)
Trap: (C) is only , the effective stress at the base, not the sum of three points; (B) wrongly adds the water depth, which raises total stress and pore pressure equally.
This is why the effective stress in a river bed or below a reservoir does not depend on the depth of water; dam engineers read standpipe piezometers in the foundation to confirm hydrostatic conditions or spot upward seepage that cuts the effective stress.
Scale factor for the sheet pile embedment depth to draw a flow net in anisotropic soil with kH and kV
A vertical sheet pile wall is installed in an anisotropic soil having coefficient of horizontal permeability, and coefficient of vertical permeability, . In order to draw the flow net for the isotropic condition, the embedment depth of the wall should be scaled by a factor of ______, without changing the horizontal scale.
- (A)
- (B)
- (C)1.0
- (D)
Answer: (A) Official key: A
- Steady 2-D seepage in anisotropic soil: , which is not the Laplace equation, so square flow nets do not apply directly.
- Keep and stretch the vertical scale: . Then and the equation becomes .
- It is isotropic when , i.e. . Every vertical length, including the embedment depth, is multiplied by this factor; for it is .
- Answer: (A)
Trap: (B) is the textbook factor for the horizontal scale when the vertical scale is kept (it would be 0.33 for ). The question fixes the horizontal scale, so the factor inverts.
Alluvial and layered deposits along Indian rivers often have several times , so seepage below barrage cut-offs, cofferdams and sheet-piled excavations is analysed on a transformed section (or in PLAXIS/SEEP/W with anisotropic ) before exit gradients and uplift are checked.
Total head at the junction of two soil samples with k = 10 and 1 mm/s in series under a pressurised tank
For the flow setup shown in the figure (not to scale), the hydraulic conductivities of the two soil samples, Soil 1 and Soil 2, are 10 mm/s and 1 mm/s, respectively. Assume the unit weight of water as 10 kN/m3 and ignore the velocity head. At steady state, what is the total head (in m, rounded off to two decimal places) at any point located at the junction of the two samples? ________
Answer: Official key: 4.50 to 4.60
- Datum at 0 m. Top tank: total head . Bottom tank (free surface at 0 m): total head . Total loss .
- Flow is in series through equal areas, so the same passes both soils: with .
- and , so . Most of the head is lost in the less permeable Soil 2.
- Junction:
- Total head at the junction
Trap: ignoring the 10 kPa on the top tank gives ; splitting the loss in proportion to instead of gives . Both miss the key.
Seepage through a sand filter over a clay core, or through a cut-off wall in pervious foundation soil, is checked this way: the low-permeability layer takes almost all the head loss, which sets the exit gradient and the uplift on the downstream side of weirs and earth dams.
Permeability of flocculated compacted clay, pore pressure on the phreatic line, piping under dams
Consider the statements P, Q, and R.
P: Compacted fine-grained soils with flocculated structure have isotropic permeability.
Q: Phreatic surface/line is the line along which the pore water pressure is always maximum.
R: The piping phenomenon occurring below the dam foundation is typically known as blowout piping.
Which of the following option(s) is/are CORRECT?
- (A)Both P and R are TRUE
- (B)P is FALSE and Q is TRUE
- (C)P is TRUE and R is FALSE
- (D)Both Q and R are FALSE
Answer: (C) and (D) Official key: C;D
- P TRUE. Compacted dry of optimum, clay particles take a flocculated, edge-to-face, random arrangement, so flow paths are similar in every direction and . Compacted wet of optimum the structure is dispersed (parallel plates) and .
- Q FALSE. The phreatic line is the top flow line in an earth dam, where the water is at atmospheric pressure: along it, with positive below and suction above.
- R FALSE. Piping below a dam foundation is subsurface (backward) erosion piping: it starts where seepage exits at the downstream toe and works upstream as a pipe. It is not called blowout piping.
- Options: (A) needs R true, false. (B) needs P false, false. (C) P true and R false: correct. (D) Q false and R false: correct.
Answer: (C) and (D).
Trap: marking Q true because the phreatic line is the highest water level in the dam. Highest level means lowest pressure: zero gauge pressure.
Earth dam designers draw the phreatic line (Casagrande parabola) to size the toe filter or rock toe, and specify core compaction slightly wet of optimum partly for its lower permeability across the core; relief wells at the toe are the standard defence against subsurface erosion piping.
Void ratio of an earth dam soil for FS 2 against piping: 15 m head, 10 drops, 3 m elements
A homogeneous earth dam has a maximum water head difference of 15 m between the upstream and downstream sides. A flownet was drawn with the number of potential drops as 10 and the average length of the element as 3 m. Specific gravity of the soil is 2.65. For a factor of safety of 2.0 against piping failure, void ratio of the soil is ________ (rounded off to 2 decimal places).
Answer: Official key: 0.63 to 0.67
- Head lost across each potential drop: .
- Exit gradient over an element of length 3 m: .
- Factor of safety against piping: , so the soil needs .
- Critical gradient: , so and .
Answer: .
Trap: setting equal to the exit gradient () gives , a much looser soil that would be just at the point of piping, with no margin.
Exit-gradient checks like this govern the downstream filters of earth dams and the floor length and cut-offs of barrages and weirs on alluvium, where Khosla's method (CBIP Publication 12) sets safe exit gradients for each soil type.
Two soils in series (50 cm at 0.055 cm/s, 30 cm at 0.035 cm/s), area 100 cm2, head 150 cm: discharge
Two soils of permeabilities and are placed in a horizontal flow apparatus, as shown in the figure. For Soil 1, cm, and cm/s; for Soil 2, cm, and cm/s. The cross sectional area of the horizontal pipe is 100 cm2, and the head difference () is 150 cm. The discharge (in cm3/s) through the soils is ___________ (rounded off to 2 decimal places).
Answer: Official key: 8.44 to 8.56
- The soils are in series: the same discharge passes through both, and the head losses add up to .
- Darcy in each soil: , , so .
- .
- , so the discharge is .
- Check: , ; head lost in soil 1 is cm and in soil 2 cm.
Trap: averaging the permeabilities by length, , gives , outside the key. That weighted mean applies to flow along layers; across layers in series the less permeable soil controls.
The same series rule gives the equivalent vertical permeability of a layered deposit from borehole and lab tests (IS 2720 Part 17 and Part 36), which governs dewatering of deep excavations and the design of graded filters behind retaining walls and in earth dams, where a fine layer throttles the flow.
Which laboratory test is most suitable for measuring the permeability of clayey soils?
The most suitable test for measuring the permeability of clayey soils in the laboratory is ______.
- (A)Constant head test
- (B)Pumping out test
- (C)Hydrometer test
- (D)Falling head test
Answer: (D) Falling head test Official key: D
- Clays have of roughly to . In a constant head test the volume collected in a reasonable time would be too small to measure accurately; that test suits sands and gravels.
- In the falling head test the water enters from a narrow standpipe of area ; a small flow produces a readable fall of level, and (IS 2720 Part 17).
- So the most suitable laboratory test for clay is the falling head test, option (D).
Trap: (A) is the standard test for coarse soils, not clay. (B), the pumping out test, is a field test on an aquifer, and (C), the hydrometer test, measures the grain size of fines, not permeability.
Falling head tests on compacted clay are routine for landfill and pond liners: India's Solid Waste Management Rules 2016 require a compacted clay liner with permeability not more than 1 x 10^-7 cm/s, checked in the lab on samples from the borrow area and the placed liner.
Water table depth, bulking of sand, liquefaction, earth pressure: which effective stress statements are wrong?
Which of the following statements is/are INCORRECT?
- (A)As the depth of the ground water table from the ground surface increases, the effective stress in the soil decreases.
- (B)Bulking of the moist sand is due to the capillary action in the sand.
- (C)The effective stress in a liquified soil is almost zero.
- (D)The earth pressure at any point in the soil, under all conditions, is always smaller than the vertical effective stress at that point.
Answer: (A) and (D) Official key: A;D
- (A) is incorrect. ; lowering the water table removes pore pressure, so increases. Example at 10 m depth (, ): GWT at 2 m gives , GWT at 6 m gives . This is why pumping causes settlement.
- (B) is correct. Thin water films between moist sand grains carry surface tension (capillary) forces that hold the grains apart, so the loose volume rises by up to about 20 to 30%.
- (C) is correct. In liquefaction the pore pressure rises until , so and the soil loses its strength.
- (D) is incorrect. The lateral pressure is ; in the passive state , and an overconsolidated soil can have , so the lateral pressure can exceed .
- The incorrect statements are (A) and (D).
Trap: marking (B) as wrong because bulking sounds like a moisture-absorption effect. It is capillary: dry or fully submerged sand does not bulk.
Dewatering for basements and metro station boxes raises effective stress and can settle neighbouring buildings, so Indian metro projects monitor groundwater and settlement around the excavation; IS 1893 (Part 1):2016 asks for a liquefaction check of saturated loose sands, and IS 2386 (Part 3) corrects mix proportions for the bulking of moist sand.
Flow net under a dam, 9 m head, 10 drops, exit field 1 m, soil 21 kN/m3: factor of safety against quick sand
From a flow-net diagram drawn under a concrete dam, following information are obtained: (i) The head difference between upstream and downstream side of the dam is 9 m. (ii) The total number of equipotential drops between upstream and downstream side of the dam is 10. (iii) The length of the field nearest to the toe of the dam in the downstream side is 1 m.
If the soil below the dam is having a saturated unit weight of 21 kN/m3 and unit weight of water is 9.81 kN/m3, then the factor of safety against the quick condition will be ______ (round off to two decimal places).
Answer: Official key: 1.24 to 1.30
- Head lost across each equipotential drop: .
- Exit gradient in the last field at the toe: .
- Critical gradient for the quick condition: .
- , so the answer is .
Trap: taking (a common rule of thumb) gives , and using instead of the submerged weight gives ; both are outside the key. Only the buoyant weight resists the upward seepage force.
Barrages and weirs on alluvial rivers in India are designed against piping by checking the exit gradient at the downstream end (Khosla's method in CBIP Publication 12) against a safe value, and flow nets do the same check for dams and cofferdams on permeable foundations.
Permeability of a sand at void ratio 0.80 by Taylor's equation, given 0.14 cm/s at void ratio 0.60
For a liquid, the permeability of a sandy soil having a void ratio of 0.60 was determined as 0.14 cm/s. Considering the same liquid and by using Taylor’s equation, the permeability (in cm/s) of this soil corresponding to the void ratio of 0.80 is _____ (rounded off to two decimal places).
Answer: Official key: 0.28 to 0.32
- Taylor's equation: . Same soil (same grain size and shape factor ) and same liquid (same ), so only the void-ratio term changes: .
- At : . At : .
- .
- Answer: (key range 0.28 to 0.32).
Trap: using the simpler rule gives , and dropping the in Taylor's term gives . Both fall outside the key; the question names Taylor's equation, so use .
Permeability is measured in the lab by the constant-head test of IS 2720 (Part 17) at one density; when a filter or drainage blanket for an embankment or a retaining-wall backfill will be placed looser or denser than the test sample, engineers scale the measured value with the void-ratio term of Taylor or Kozeny-Carman before using it in dewatering or drainage calculations.
Critical hydraulic gradient for quicksand in a saturated sand with water content 20 % and G = 2.65
A fully saturated sandy soil deposit has water content 20 % and specific gravity 2.65.
The critical hydraulic gradient for seepage through the soil to create the quicksand condition is _____________ (rounded off to two decimal places).
Answer: Official key: 1.00 to 1.15
- Fully saturated, so and gives .
- Quicksand starts when the upward seepage force per unit volume, , equals the submerged unit weight , so the effective stress becomes zero.
- .
- Check with unit weights (): , , and . Answer: .
Trap: putting the water content in place of the void ratio, . For a saturated soil , not , so the denominator is .
The same check governs the floor of a deep excavation dewatered inside sheet piles or diaphragm walls in saturated sand, such as a metro station box, and the exit gradient below barrages on Indo-Gangetic alluvium, where the design exit gradient is kept to a fraction of the critical value to prevent piping.
Days for 25 % consolidation of a 25 m clay layer from an oedometer t50 of 10 min on a 25 mm sample
A raft foundation of 30 m × 25 m is proposed to be constructed at a depth of 8 m in a sand layer. A 25 m thick saturated clay layer exists 2 m below the base of the raft foundation. Below the clay layer, a dense sand layer exists at the site. A 25 mm thick undisturbed sample was collected from the mid-depth of the clay layer and tested in a laboratory oedometer under double drainage condition. It was found that the soil sample had undergone 50 % consolidation settlement in 10 minutes.
The time (in days) required for 25 % consolidation settlement of the raft foundation will be ____________________. (round off to the nearest integer)
Answer: Official key: 1730 to 1740
- Drainage paths: the lab sample drains both faces, mm. In the field the clay has sand above and dense sand below, so it also drains both ways: m.
- For , : , .
- Lab: .
- Field: .
- days. Answer: 1736 days
Trap: taking the field layer as single drained ( m) gives 6944 days, four times too long. Using the rounded table values and gives 1727 days, just outside the key: keep exact.
Oedometer values (IS 2720 Part 15) are scaled this way to predict how long the clay under rafts, tank farms and highway embankments will keep settling; when the answer runs into years, as here, designers install prefabricated vertical drains to shorten the drainage path.
Percentage consolidation at mid-depth of a clay layer when effective stress reaches 175 kPa
A saturated compressible clay layer of thickness is sandwiched between two sand layers, as shown in the figure. Initially, the total vertical stress and pore water pressure at point P, which is located at the mid-depth of the clay layer, were 150 kPa and 25 kPa, respectively. Construction of a building caused an additional total vertical stress of 100 kPa at P. When the vertical effective stress at P is 175 kPa, the percentage of consolidation in the clay layer at P is _____________. (in integer)
Answer: Official key: 50 to 50
- Initial effective stress at P: kPa.
- The 100 kPa load is first carried entirely by excess pore pressure. When it has fully dissipated, kPa.
- Degree of consolidation at a point = fraction of the excess pore pressure dissipated = fraction of the effective stress increase already achieved: .
- Equivalently, the excess pore pressure left is kPa out of the initial 100 kPa.
- Answer: 50 %
Trap: forgetting the initial pore pressure and using gives 25 %. The 150 kPa is total stress; consolidation is measured in effective stress.
On preloaded soft-clay sites such as port reclamations and expressway embankments, Casagrande piezometers at mid-depth of the clay track exactly this dissipation, and the surcharge is removed only after the measured degree of consolidation reaches the design target.
Clay layer settled 10 mm of 50 mm in 300 days: additional time to reach 50% consolidation
The total primary consolidation settlement () of a building constructed on a 10 m thick saturated clay layer is estimated to be 50 mm. After 300 days of the construction of the building, primary consolidation settlement was reported as 10 mm. The additional time (in days) required to achieve 50% of will be ________ (rounded off to the nearest integer).
Answer: Official key: 1550 to 1600
- Average degree of consolidation after 300 days: (20%).
- For : , so and .
- Same layer, same drainage and , so gives .
- .
- Additional time after the first 300 days: .
Answer: .
Trap: reporting days. That is the time from construction; the question asks for the time still needed. Taking (linear) is the other slip: it gives 750 days in total.
On soft-clay sites such as port backup areas and highway approaches on marine clay, settlement plates are read for months and fitted to the Tv-U curve to forecast when the fill can be paved; if the forecast is too slow, prefabricated vertical drains shorten the drainage path.
Oedometer clay at 100 kPa, load raised to 150 kPa: effective stress and excess pore pressure right after
In an oedometer apparatus a specimen of fully saturated clay has been consolidated under a vertical pressure of 100 kPa and is at equilibrium state. Immediately on increasing the vertical pressure to 150 kPa, the effective stress and excess pore water pressure will be
- (A)
- (B)
- (C)
- (D)
Answer: (B) , Official key: B
- At equilibrium under 100 kPa all excess pore pressure has dissipated: , .
- The load step is . Water and soil grains are nearly incompressible and the oedometer allows no lateral strain, so at the water takes the whole increment (spring analogy, Terzaghi): .
- Effective stress is unchanged at that instant: : option (B).
- With time dissipates and rises to 150 kPa.
Trap: option (C) lets the new load act on the soil skeleton immediately, which is the end-of-consolidation state, not the instant of loading. Option (D) puts the total stress, not the increment, into the pore water.
The IS 2720 (Part 15) consolidation test applies each load increment and waits for this excess pore pressure to dissipate before the next one; the same principle is tracked in the field with piezometers when soft marine clays are preloaded with surcharge and PVDs for port and highway embankments.
6 m clay drained top and bottom, t50 = 2 years, mv = 1.51e-3 m2/kN: coefficient of permeability in m/year
A 6 m thick clay stratum has drainage at both its top and bottom surface due to the presence of sand strata. The time to complete 50% consolidation is 2 years. The coefficient of volume change () is and unit weight of water is 9.81 kN/m3.
The coefficient of permeability (in m/year) is ______ (round off to three decimal places).
Answer: Official key: 0.010 to 0.015
- Drainage at both faces: drainage path .
- For , . From : .
- Terzaghi: , so .
- The answer is (with the exact it is , the same to three decimals).
Trap: using the full 6 m as the drainage path gives , four times too large and outside the key. With sand on both faces water leaves both ways, so the longest path is half the thickness.
Geotechnical reports for soft clay sites (coastal reclamation, ports, highway embankments) back-calculate permeability and c_v from IS 2720 (Part 15) oedometer data in exactly this way, and use them to decide prefabricated vertical drain spacing and the surcharge period.
Clay layer takes 30 days to go from 25 % to 50 % consolidation: total time for 90 % consolidation
For a clayey soil stratum, the time required for degree of consolidation from 25 % to 50 % is 30 days.
The total time (in days) required for 90 % degree of consolidation of the same soil stratum is ______ (rounded off to the nearest integer).
Answer: Official key: 170 to 174
- Terzaghi: . For the same stratum is fixed, so time is proportional to the time factor .
- For : . , , so 30 days corresponds to .
- For : , so .
- Total time from the start of loading: . Answer: .
Trap: reading 30 days as gives days, and using beyond 60 % () gives 130 days. The 30 days is the interval between 25 % and 50 %, and comes from the log formula.
On soft marine clay at port and highway embankment sites, engineers back-calculate the field from settlement-plate readings taken at two degrees of consolidation in exactly this way, then decide how long the surcharge must stay or how closely to space prefabricated vertical drains to reach 90 % consolidation before paving.