GATE Civil General Aptitude: quantitative questions solved (official CE1 and CE2 papers 2022-2025)

General Aptitude is the first 10 questions of every GATE paper and 15 of its 100 marks. The eight official CE papers of 2022-2025 (sets CE1 and CE2) set 37 quantitative GA questions, worth 56 marks: 10 on ratios, partnership, money and clocks, 10 on geometry, 9 on numbers and sequences, 4 on counting and seating, 4 on charts. Each is solved with the shortcut and the trap option explained, and every answer was recomputed by a script against the official key.

Questions from the General Aptitude section of the official GATE CE papers, sets CE1 and CE2 of GATE 2022 (IIT Kharagpur), 2023 (IIT Kanpur), 2024 (IISc Bengaluru) and 2025 (IIT Roorkee); figures redrawn and solutions by Skill-Lync. · Updated 17 Nov 2026 · 19 of 37 questions on this page

GATE 2022 · CE2 · Q.3MCQ · 1 markNumbers, powers and algebra

Add x to 3/4's numerator and denominator, subtract x from 15/17's: the results are equal. Find x

Both the numerator and the denominator of are increased by a positive integer, , and those of are decreased by the same integer. This operation results in the same value for both the fractions.

What is the value of ?

  1. (A)1
  2. (B)2
  3. (C)3
  4. (D)4

Answer: (C) 3 Official key: C

  1. Set up the equation: .
  2. Cross-multiply: , that is .
  3. The terms cancel: , so .
  4. Check: and . (C) 3.

Trap: trying options without simplifying. With the fractions are and , close but not equal; always reduce both fractions before comparing.

Where this shows up in industry

Equating two ratios and solving for the unknown is the core of a proportioning problem, for example finding how much water to add so the water-cement ratio of two batches matches, or adjusting a survey scale factor.

GATE 2023 · CE1 · Q.9MCQ · 2 marksNumbers, powers and algebra

a = 30!, b = 50!, c = 100!: correct ordering of log_a c, log_c a, log_b a and log_a b?

Let , , and . Consider the following numbers:

, , ,

Which one of the following inequalities is CORRECT?

  1. (A)
  2. (B)
  3. (C)
  4. (D)

Answer: (A) Official key: A

  1. Since , their logarithms satisfy . Write each number as a ratio: .
  2. and are below 1 (smaller over larger). With the same numerator , the larger denominator gives the smaller value: .
  3. and are above 1, and gives .
  4. So : option (A).
  5. Check with : , , , giving 0.205, 0.503, 1.989 and 4.872.

Trap: (C) swaps the last two. Both are above 1, but has the larger numerator and is the biggest of all.

Where this shows up in industry

Logarithmic ratios are how civil engineers compare quantities that span many orders of magnitude: the decibel scale for traffic noise, the pH of water samples, and the log-time scale of a consolidation curve. Ordering logs without a calculator is a useful check on those plots.

GATE 2023 · CE2 · Q.9MCQ · 2 marksNumbers, powers and algebra

If 4 raised to the power 8^x equals 256, what is x?

If satisfies the equation , then is equal to _____.

  1. (A)
  2. (B)
  3. (C)
  4. (D)

Answer: (C) Official key: C

  1. Write 256 as a power of 4: . So and the exponents must match: .
  2. Write both sides as powers of 2: , so and : option (C).
  3. Check: , and .

Trap: (option D) solves , the equation with the bases swapped. (B) and (A) give of about 4.76 and 2.83, not 4. The correct form is , which is not listed as such.

Where this shows up in industry

Exponent equations of this kind appear when back-calculating from growth or decay laws, such as the time for consolidation settlement or for traffic to grow to a design value at a compound rate, as in the IRC method for design traffic.

GATE 2024 · CE1 · Q.2MCQ · 1 markNumbers, powers and algebra

Houses numbered 301, 303, ... and 302, 304, ...; the sums differ by 27. How many houses on each side?

In a locality, the houses are numbered in the following way:

The house-numbers on one side of a road are consecutive odd integers starting from 301, while the house-numbers on the other side of the road are consecutive even numbers starting from 302. The total number of houses is the same on both sides of the road.

If the difference of the sum of the house-numbers between the two sides of the road is 27, then the number of houses on each side of the road is

  1. (A)27
  2. (B)52
  3. (C)54
  4. (D)26

Answer: (A) 27 Official key: A

  1. Pair the houses across the road: 301 with 302, 303 with 304, and so on. Each even house number is exactly 1 more than the odd one opposite it.
  2. With houses on each side, the even side's sum is larger by .
  3. So : option (A). Check: odd sum , even sum , difference 27.

Trap: 54 is the total number of houses on both sides; the question asks for each side.

Where this shows up in industry

Pairing items so that most of a sum cancels is the same shortcut used to check a bar bending schedule or a quantity bill quickly: compare two lists line by line and only the differences need adding, not every entry.

GATE 2024 · CE1 · Q.3MCQ · 1 markNumbers, powers and algebra

If (p/q) raised to p/q equals p raised to (p/q - 1), which relation between p and q holds?

For positive integers and , with , . Then,

  1. (A)
  2. (B)
  3. (C)
  4. (D)

Answer: (A) Official key: A

  1. Split the left side: .
  2. The right side is .
  3. The numerators are equal, so . Raise both sides to the power : , option (A).
  4. Check with an integer pair that works, , (the other is , ): and , and .

Trap: (C) would need , which the question rules out, and (D) is , which is a different relation (); for , it gives .

Where this shows up in industry

Working with exponents and logarithms is routine in civil practice: the power-law form of a rating curve, Horton's infiltration decay and pavement damage that grows with the fourth power of axle load all need you to take logs and compare exponents without a calculator slip.

GATE 2024 · CE1 · Q.4MCQ · 1 markNumbers, powers and algebra

3, 7, 15, x, 63, 127, 255: which value of x fits the sequence?

Which one of the given options is a possible value of x in the following sequence?

3, 7, 15, x, 63, 127, 255

  1. (A)35
  2. (B)40
  3. (C)45
  4. (D)31

Answer: (D) 31 Official key: D

  1. Each term is one less than a power of 2: , , , , , .
  2. The missing term is : option (D).
  3. The same rule seen another way: each term is double the previous plus 1 (, ).

Trap: 35, 40 and 45 come from guessing a step of 20, 25 or 30 after 15; only 31 keeps the gaps doubling (4, 8, 16, 32, 64, 128) all the way to 255.

Where this shows up in industry

Spotting a doubling pattern is how engineers read geometric growth in data: settlement readings, traffic counts or crack widths that double each interval call for a different response than steady linear growth, and the check is the same ratio test used here.

GATE 2024 · CE2 · Q.4MCQ · 1 markNumbers, powers and algebra

The sum of the first 20 positive odd numbers divided by 20 squared equals what?

If the sum of the first 20 consecutive positive odd numbers is divided by , the result is

  1. (A)1
  2. (B)20
  3. (C)2
  4. (D)1/2

Answer: (A) 1 Official key: A

  1. The sum of the first odd numbers is : , , , and so on.
  2. So .
  3. Divided by : , option (A).

Trap: dividing by 20 instead of gives 20 (B). Also, the 20th odd number is 39, not 40, so adding 'up to 40' overshoots.

Where this shows up in industry

Closed-form sums save real time in estimating: the area under a stepped load or a staircase of earthwork sections, or the total of an arithmetic series of floor loads, comes from a formula, not from adding every term.

GATE 2025 · CE1 · Q.3MCQ · 1 markNumbers, powers and algebra

Sum of the infinite series 1/1! + 1/2! + 1/3! + 1/4! + 1/5! + ...

The sum of the following infinite series is:

  1. (A)
  2. (B)
  3. (C)
  4. (D)

Answer: (C) Official key: C

  1. The exponential series is , so at :
  2. and .
  3. The given series is the same sum without the first term, so it equals , option (C).
  4. Check: the first terms already give ; the full sum is , and .

Trap: (D) . The series for starts at , a term that is easy to forget is there.

Where this shows up in industry

The exponential series underlies every e to the power x a design calculation uses: first-order BOD decay in a river below an outfall, the time-settlement curve in consolidation and continuous compounding in project cash flows. Knowing that e is about 2.718 is enough to sanity-check those outputs.

GATE 2025 · CE2 · Q.5MCQ · 1 markNumbers, powers and algebra

Y + 2V = 50, V + G = 50, Y + R = 50, V + 2R = 50: which pie chart shows the balls in the bag?

A bag contains Violet (V), Yellow (Y), Red (R), and Green (G) balls. On counting them, the following results are obtained:

(i) The sum of Yellow balls and twice the number of Violet balls is 50.
(ii) The sum of Violet and Green balls is 50.
(iii) The sum of Yellow and Red balls is 50.
(iv) The sum of Violet and twice the number of Red balls is 50.

Which one of the following Pie charts correctly represents the balls in the bag?

  1. (A)Option A: pie chart, clockwise from 12 o'clock: V 10%, R 20%, Y 30%, G 40%V10%R20%Y30%G40%
  2. (B)Option B: pie chart, clockwise from 12 o'clock: V 40%, R 10%, Y 20%, G 30%V40%R10%Y20%G30%
  3. (C)Option C: pie chart, clockwise from 12 o'clock: V 30%, R 40%, Y 10%, G 20%V30%R40%Y10%G20%
  4. (D)Option D: pie chart, clockwise from 12 o'clock: V 20%, R 30%, Y 40%, G 10%V20%R30%Y40%G10%

Answer: (A) Official key: A

  1. From (i): . From (iii): .
  2. Put in (iv): , so .
  3. Then , and, from (ii), .
  4. Total balls, so the shares are V 10%, R 20%, Y 30%, G 40%: pie chart (A).
  5. Check every statement: , , , .

Trap: the four charts use the same four percentages in different orders; (D) swaps Y and G, and only solving the equations tells which colour gets which share.

Where this shows up in industry

Turning statements into a few linear equations is routine in quantity work: mix proportions from ratio conditions, or member forces from the equilibrium of a truss joint, are small linear systems, and the result is often reported as shares of a whole.

GATE 2022 · CE1 · Q.2MCQ · 1 markGeometry and mensuration

Lines through the origin and (1, 3) and (1, 2): area between them for x from 0 to 1?

Two straight lines pass through the origin . One of them passes through the point and the other passes through the point .

What is the area enclosed between the straight lines in the interval on the -axis?

  1. (A)0.5
  2. (B)1.0
  3. (C)1.5
  4. (D)2.0

Answer: (A) 0.5 Official key: A

  1. The lines are and . Between and the region is the triangle with corners , and .
  2. Its base is the vertical side at , of length , and its height is the horizontal distance , so the area is .
  3. Same with integrals: , that is (A) 0.5.

Trap: taking the area under one of the lines, 1.5 for (C) or 1 for (B), instead of the difference.

Where this shows up in industry

The area between two lines over a range is exactly how earthwork is measured between a ground line and a formation line on a road or canal cross-section, before multiplying by the chainage interval to get the cut or fill volume.

GATE 2022 · CE1 · Q.5MCQ · 1 markGeometry and mensuration

Squares SPQT, PXWR and RUVZ around a circle with centre R: how are their areas related?

In the following diagram, the point R is the center of the circle. The lines PQ and ZV are tangential to the circle. The relation among the areas of the squares, PXWR, RUVZ and SPQT is

Circle with centre R. Square SPQT stands on the tangent PQ at Q, square PXWR on PR, and square RUVZ on the radius RZ with side ZV tangent at ZSPTQRXWZUV
  1. (A)Area of SPQT = Area of RUVZ = Area of PXWR
  2. (B)Area of SPQT = Area of PXWR − Area of RUVZ
  3. (C)Area of PXWR = Area of SPQT − Area of RUVZ
  4. (D)Area of PXWR = Area of RUVZ − Area of SPQT

Answer: (B) Area of SPQT = Area of PXWR − Area of RUVZ Official key: B

  1. A tangent is perpendicular to the radius at the point of contact. PQ touches the circle at Q, so the angle PQR is and triangle PQR is right-angled at Q, with hypotenuse PR.
  2. Pythagoras: .
  3. Read each square: PXWR stands on PR (area ), SPQT on PQ (area ), and RUVZ on the radius RZ, which equals QR (area ).
  4. So : area of SPQT = area of PXWR area of RUVZ, (B).

Trap: (C) puts the hypotenuse square on the wrong side. The square on the hypotenuse is always the largest, so it can never equal a difference of the other two. ZV being a tangent only confirms that RUVZ is a square with side equal to the radius.

Where this shows up in industry

Right angles at a tangent point are used every day in highway and railway curve setting: the radius to the tangent point is perpendicular to the tangent, which is how surveyors fix the centre and offsets of a circular curve by Pythagoras from the tangent line.

GATE 2022 · CE2 · Q.8MCQ · 2 marksGeometry and mensuration

L1: 2x - 3y = 5, L2: 3x + 2y = 8, L3: 4x - 6y = 5, L4: 6x - 9y = 6: which statement is right?

Consider the following equations of straight lines:

Line L1:
Line L2:
Line L3:
Line L4:

Which one among the following is the correct statement?

  1. (A)L1 is parallel to L2 and L1 is perpendicular to L3
  2. (B)L2 is parallel to L4 and L2 is perpendicular to L1
  3. (C)L3 is perpendicular to L4 and L3 is parallel to L2
  4. (D)L4 is perpendicular to L2 and L4 is parallel to L3

Answer: (D) L4 is perpendicular to L2 and L4 is parallel to L3 Official key: D

  1. Slope of is . L1: ; L2: ; L3: ; L4: .
  2. L1, L3 and L4 all have slope , so they are parallel (distinct lines, since their constants differ after scaling). L2 has slope , and , so L2 is perpendicular to each of them.
  3. (A) fails (L1 is not parallel to L2), (B) fails (L2 is not parallel to L4), (C) fails (L3 is parallel, not perpendicular, to L4). (D): L4 is perpendicular to L2 and parallel to L3.

Trap: comparing the coefficients without dividing out the common factor; and look different but are both multiples of .

Where this shows up in industry

Parallel and perpendicular checks from line equations are what a total station or CAD program does when setting out a building grid: column lines must be exactly parallel and the cross grid exactly perpendicular, which in coordinates means equal slopes and slopes multiplying to minus one.

GATE 2023 · CE1 · Q.3MCQ · 1 markGeometry and mensuration

Regular hexagon PQRSTV of side 5 cm, circle centred at V through P: area of the shaded part inside the hexagon?

In the given figure, PQRSTV is a regular hexagon with each side of length 5 cm. A circle is drawn with its centre at V such that it passes through P. What is the area (in cm2) of the shaded region? (The diagram is representative)

Regular hexagon PQRSTV with a circle centred at V passing through P and T; the part of the circle inside the hexagon is shadedPVTSRQ
  1. (A)
  2. (B)
  3. (C)
  4. (D)

Answer: (A) Official key: A

  1. The radius is cm, a side of the hexagon. is also a side, so the circle passes through T as well.
  2. The shaded region is the part of the circle inside the hexagon: a sector with its vertex at V bounded by VP and VT.
  3. Its angle is the interior angle of a regular hexagon: .
  4. Sector area cm, about 26.18 cm: option (A). A fine-grid count of the circle inside the hexagon gives 26.18.

Trap: using the 60 degree angle at the centre of the hexagon gives , which is not an option; the sector sits at a corner, so the interior angle of 120 degrees is the one to use.

Where this shows up in industry

Sector and segment areas come up when computing the wetted area of a partly full circular sewer or culvert, and when sizing a circular footing that is cut by a boundary. The same formula, theta over 360 times pi r squared, does the work.

GATE 2023 · CE1 · Q.10MCQ · 2 marksGeometry and mensuration

4 cm square with a semicircle on top and two quarter-circle arcs at the bottom, radius 2 cm: shaded area?

A square of side length 4 cm is given. The boundary of the shaded region is defined by one semi-circle on the top and two circular arcs at the bottom, each of radius 2 cm, as shown.

The area of the shaded region is _____ cm2.

A 4 cm square: a semicircle of radius 2 cm spans the top half and two quarter-circle arcs of radius 2 cm meet at the middle of the bottom edge; the corners outside the semicircle and the two quarter discs at the bottom are shaded black4 cm2 cm
  1. (A)8
  2. (B)4
  3. (C)12
  4. (D)10

Answer: (A) 8 Official key: A

  1. Top half (a rectangle): the semicircle of radius 2 sits in it, centred at the middle of the square. The shaded top part is the rectangle minus the semicircle: .
  2. Bottom half: each black piece is a quarter disc of radius 2 centred at a bottom corner, area . Two of them give .
  3. Total cm: option (A). The terms cancel. A fine-grid count of the black area gives 8.000.

Trap: taking the bottom white region as the shaded part gives for the bottom half, and a total of , not an option. Read which side of each arc is black before adding.

Where this shows up in industry

Adding and subtracting circular pieces from rectangles is how the area of a horseshoe or arched tunnel section, or a rectangular slab with circular openings, is worked out for concrete quantities in a bill of quantities.

GATE 2023 · CE2 · Q.10MCQ · 2 marksGeometry and mensuration

Rotating globe: points on the equator, the north pole and midway between them. How do their speeds compare?

Consider a spherical globe rotating about an axis passing through its poles. There are three points , , and situated respectively on the equator, the north pole, and midway between the equator and the north pole in the northern hemisphere. Let , , and move with speeds , , and , respectively.

Which one of the following options is CORRECT?

  1. (A)
  2. (B)
  3. (C)
  4. (D)

Answer: (C) Official key: C

  1. Every point of a rigid globe turns with the same angular speed , but each moves on its own circle around the axis. Its speed is , where is its distance from the axis.
  2. At latitude on a globe of radius , that distance is .
  3. P (equator, ): . R (midway, ): . Q (pole, ): it sits on the axis, so .
  4. So : option (C).

Trap: equal angular speed is not equal speed. (D) would be true only if R were also on the equator.

Where this shows up in industry

Speed proportional to distance from the axis matters in rotating plant on civil projects, such as the tip speed of a tunnel boring machine cutterhead or a concrete mixer drum. Outer cutters travel farthest and wear fastest, which sets their replacement intervals.

GATE 2024 · CE1 · Q.10MCQ · 2 marksGeometry and mensuration

At half moon the Moon-Earth-Sun angle is 89.85 degrees: ratio of Earth-Sun to Earth-Moon distance?

During a half-moon phase, the Earth-Moon-Sun form a right triangle. If the Moon-Earth-Sun angle at this half-moon phase is measured to be 89.85°, the ratio of the Earth-Sun and Earth-Moon distances is closest to

  1. (A)328
  2. (B)382
  3. (C)238
  4. (D)283

Answer: (B) 382 Official key: B

  1. At half moon the right angle is at the Moon: the sunlight hits the Moon at to our line of sight. So Earth-Sun is the hypotenuse and Earth-Moon is the side next to the angle at the Earth.
  2. , so .
  3. , so the ratio is : option (B).

Trap: the options are the same three digits shuffled, so a rough estimate is not enough; use in radians for the small angle .

Where this shows up in industry

This is Aristarchus' method, and the same thin-triangle geometry is used in surveying: when a sight angle is close to 90 degrees, a tiny angle error swings the computed distance hugely, which is why total-station traverses avoid such ill-conditioned triangles.

GATE 2024 · CE2 · Q.7MCQ · 2 marksGeometry and mensuration

Seven equal chalk sticks fill a cylinder (one centre, six around): ratio of occupied to empty space?

Seven identical cylindrical chalk-sticks are fitted tightly in a cylindrical container. The figure below shows the arrangement of the chalk-sticks inside the cylinder.

The length of the container is equal to the length of the chalk-sticks. The ratio of the occupied space to the empty space of the container is

Cross-section: seven equal circles, one in the centre and six around it, all touching, inside one large circle that touches the outer six
  1. (A)5/2
  2. (B)7/2
  3. (C)9/2
  4. (D)3

Answer: (B) 7/2 Official key: B

  1. All lengths are equal, so compare cross-section areas. Let each stick have radius .
  2. The six outer sticks touch the centre one, so their centres are from the middle, and the container touches their far sides: container radius .
  3. Container area ; sticks ; empty .
  4. Occupied : empty , option (B).

Trap: 9/2 is container to empty, and 7/9 (not offered) is occupied to the whole container; read which two quantities the ratio compares.

Where this shows up in industry

The same packing sits inside every seven-wire prestressing strand: one centre wire with six around it, so the strand is about three wire diameters across, and the gaps between the wires are what grout and corrosion protection have to deal with.

GATE 2025 · CE1 · Q.9MCQ · 2 marksGeometry and mensuration

Circle centre (0.5, 0) radius 0.5 meets circle centre (1, 1) radius 1: which point is an intersection?

A circle with center at and radius intersects with another circle with center at and radius at two points. One of the points of intersection is:

  1. (A)
  2. (B)
  3. (C)
  4. (D)

Answer: (B) Official key: B

  1. Circle 1: , that is .
  2. Circle 2: , that is .
  3. Subtract: , so .
  4. Substitute in circle 1: gives , so or .
  5. The points are and ; only the second is offered: (B). Check: and .

Trap: (A) and (C) lie on the first circle only, and (D) on the second only. Test each option in both equations.

Where this shows up in industry

Intersecting two circles is the arithmetic of trilateration: a point fixed in a survey from measured distances to two known stations lies where the two distance circles meet, and a third distance picks which of the two points is the real one.

GATE 2025 · CE2 · Q.10MCQ · 2 marksGeometry and mensuration

Villages with PQ = 13 km, QR = 14 km, RP = 15 km: shortest road from P to the road QR?

Three villages P, Q, and R are located in such a way that the distance km, km, and km, as shown in the figure. A straight road joins Q and R. It is proposed to connect P to this road QR by constructing another road. What is the minimum possible length (in km) of this connecting road?

Note: The figure shown is representative.

Triangle of villages: Q and R joined by a straight road QR of 14 km; P is 13 km from Q and 15 km from R, joined by dashed linesQRP13 km15 km14 km
  1. (A)10.5
  2. (B)11.0
  3. (C)12.0
  4. (D)12.5

Answer: (C) 12.0 Official key: C

  1. The shortest road from P to the line QR is the perpendicular from P, the altitude on QR.
  2. Area by Heron's formula: , area .
  3. Altitude 12.0 km, option (C).
  4. Check: the foot of the perpendicular is 5 km from Q, and , . It falls between Q and R, so the road can meet QR there.

Trap: the median from P (to the midpoint of QR) is km, longer than the perpendicular; any road other than the perpendicular is longer.

Where this shows up in industry

The shortest link from a village to an existing highway is the perpendicular to it, the first alignment a planner sketches for a rural link road before terrain and land adjust it; Heron's formula gives that length from three measured distances without any angle readings.

From GATE prep to a construction planning career

Talk to a counsellor.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.