GATE Civil: Probability and Statistics (distributions, expectation, regression), previous-year questions solved

Every probability and statistics question from the ten official GATE Civil papers of 2022-2026: 13 questions (7 NAT, 5 MCQ, 1 MSQ) on the addition rule and conditional probability, Bayes' theorem, binomial and Poisson probabilities, the normal distribution, expectation, variance and standard deviation, mean versus median, and least-squares regression, each solved step by step and checked by a script against the official key. Engineering mathematics is Section 1 of the GATE CE syllabus and stays the same in GATE 2027.

Questions from the ten official GATE CE papers, sessions CE1 and CE2 of GATE 2022 (IIT Kharagpur), 2023 (IIT Kanpur), 2024 (IISc Bengaluru), 2025 (IIT Roorkee) and 2026 (IIT Guwahati); solutions by Skill-Lync. · Updated 17 Nov 2026 · 13 questions

GATE 2022 · CE1 · Q.49NAT · 2 marksProbability and statistics: probability rules, distributions, expectation and regression

What is the least-squares slope b of y = a + bx for four observations when a is 6.1?

A set of observations of independent variable () and the corresponding dependent variable () is given below.

5243
16101312

Based on the data, the coefficient of the linear regression model

is estimated as 6.1.

The coefficient is ______________. (round off to one decimal place)

Answer: 1.9 Official key: 1.9 to 1.9

  1. Least-squares slope: with .
  2. Sums: , , , .
  3. , so 1.9.
  4. Check against the given intercept: the line passes through the means, , and indeed .

Trap: regressing on gives a slope of 0.507 (or 1.97 when inverted), which is a different line. For the deviations minimised are the vertical ones, in .

Where this shows up in industry

Least-squares lines turn field data into design relations: calibrating a rainfall-runoff relation for a catchment, fitting a correlation between CBR and dynamic cone penetration for pavement design, or fitting a stage-discharge rating curve at a river gauging site.

GATE 2022 · CE2 · Q.49NAT · 2 marksProbability and statistics: probability rules, distributions, expectation and regression

A pair of dice is rolled thrice: what is the probability that the sum is 4 in exactly two rolls?

A pair of six-faced dice is rolled thrice. The probability that the sum of the outcomes in each roll equals 4 in exactly two of the three attempts is ______. (round off to three decimal places)

Answer: 0.019 Official key: 0.018 to 0.020

  1. One roll of the pair has 36 equally likely outcomes. A sum of 4 comes from (1, 3), (2, 2) and (3, 1), so .
  2. Three independent rolls with exactly two successes is binomial with , .
  3. .
  4. , so 0.019. Enumerating all outcomes gives the same fraction.

Trap: leaving out the factor 3 for which two rolls succeed (0.0064), or the factor for the third roll failing (0.0208, which rounds to 0.021 and is outside the accepted range).

Where this shows up in industry

The binomial count is the standard tool for exceedance risk: the chance that a flood of a given return period is exceeded in exactly k years of a project life, or that exactly k concrete cubes in a sample fall below the characteristic strength, is computed the same way.

GATE 2023 · CE1 · Q.29NAT · 1 markProbability and statistics: probability rules, distributions, expectation and regression

Two independent events have probabilities 0.5 and 0.8. What is the probability that at least one occurs?

The probabilities of occurrences of two independent events A and B are 0.5 and 0.8, respectively. What is the probability of occurrence of at least A or B (rounded off to one decimal place)? ________

Answer: 0.9 Official key: 0.9 to 0.9

  1. At least one of A or B is the union : .
  2. Independence gives .
  3. So 0.9.
  4. Check through the complement: neither event happens with probability , and .

Trap: adding the two probabilities gives 1.3, which is not a probability at all; the overlap has been counted twice. Reporting only answers a different question (both events).

Where this shows up in industry

Union probabilities are how system reliability is estimated, for example the chance that at least one of two independent pumps at a water treatment plant is working, or that a flood exceeds capacity at either of two culverts in the same season.

GATE 2023 · CE2 · Q.12MCQ · 1 markProbability and statistics: probability rules, distributions, expectation and regression

Which of four probability density curves has its mean greater than its median?

Which of the following probability distribution functions (PDFs) has the mean greater than the median?

Four probability density functions: Function 1 symmetric single peak; Function 2 peak towards the left with a long tail to the right; Function 3 peak towards the right with a long tail to the left; Function 4 two equal symmetric peaksFunction 1xPDFFunction 2xPDFFunction 3xPDFFunction 4xPDF
  1. (A)Function 1
  2. (B)Function 2
  3. (C)Function 3
  4. (D)Function 4

Answer: (B) Function 2 Official key: B

  1. The median splits the area under a PDF into two halves. The mean is the balance point, and it is pulled towards a long tail, because far-out values carry large moment arms.
  2. Function 1 (single symmetric peak) and Function 4 (two equal peaks placed symmetrically) are symmetric: the mean equals the median.
  3. Function 3 has its long tail on the left (negatively skewed): the mean is dragged left, below the median.
  4. Function 2 has its peak on the left and a long tail to the right (positively skewed): mean median, so (B) Function 2. For the curve drawn here, mean 2.23 against median 1.95.

Trap: Function 3's peak sits far to the right, so it is tempting to think its mean is large. Position of the peak is the mode; what matters is which side the long tail is on, and for Function 3 that is the left, giving mean 5.77 below median 6.05.

Where this shows up in industry

Annual flood peaks and short-duration rainfall intensities are right-skewed. That is why hydrologists fit Gumbel or log-Pearson Type III distributions instead of a normal curve for design floods, and why the mean annual flood of a river exceeds its median annual flood.

GATE 2023 · CE2 · Q.13MCQ · 1 markProbability and statistics: probability rules, distributions, expectation and regression

Of 100 vehicles picked at random on an even date, how many are expected to lack a pollution clearance certificate?

A remote village has exactly 1000 vehicles with sequential registration numbers starting from 1000. Out of the total vehicles, 30% are without pollution clearance certificate. Further, even- and odd-numbered vehicles are operated on even- and odd-numbered dates, respectively.

If 100 vehicles are chosen at random on an even-numbered date, the number of vehicles expected without pollution clearance certificate is ________.

  1. (A)15
  2. (B)30
  3. (C)50
  4. (D)70

Answer: (B) 30 Official key: B

  1. Registration numbers run 1000 to 1999, so 500 vehicles are even-numbered and only these run on an even date.
  2. Nothing links the certificate to the parity of the number, so the even group has the same 30% share: 150 of the 500 lack a certificate.
  3. Drawing 100 of the 500 at random, the count without a certificate is hypergeometric with mean . Summing exactly over to 100 gives the same value.
  4. Expected number: (B) 30.

Trap: halving 30 because only half the fleet runs on a given day gives 15, option (A). The odd-even rule changes which vehicles can be picked, not the proportion without certificates among them, and the sample is already restricted to vehicles on the road.

Where this shows up in industry

Sampling a fleet for compliance is how transport departments and pollution control boards plan roadside emission checks, and the same expected-value logic sets sample sizes for traffic surveys and for quality control of bricks, cubes or bitumen samples at a site laboratory.

GATE 2024 · CE1 · Q.13MCQ · 1 markProbability and statistics: probability rules, distributions, expectation and regression

Passing only Maths has probability 1/3, only English 4/9, both 1/6: what is P(passing at least one)?

The probability that a student passes only in Mathematics is . The probability that the student passes only in English is . The probability that the student passes in both of these subjects is . The probability that the student will pass in at least one of these two subjects is

  1. (A)
  2. (B)
  3. (C)
  4. (D)

Answer: (A) Official key: A

  1. “Only Mathematics”, “only English” and “both” are three disjoint pieces of the Venn diagram, and together they make up “at least one”.
  2. So add them: .
  3. That is : (A). The chance of failing both is the remaining , option (D).

Trap: using the addition rule with the “only” figures gives , option (B). The rule needs the full probabilities and , which give again.

Where this shows up in industry

The same Venn-diagram bookkeeping is used in reliability checks of civil systems, for example the probability that at least one of two pumps in a water supply scheme or one of two load paths in a bridge survives, and in combining failure modes of a slope or a retaining wall.

GATE 2024 · CE1 · Q.47NAT · 2 marksProbability and statistics: probability rules, distributions, expectation and regression

With a 200-year return period and Poisson occurrence, what is the chance of at least one exceedance in 50 years?

The return period of a large earthquake for a given region is 200 years. Assuming that earthquake occurrence follows Poisson’s distribution, the probability that it will be exceeded at least once in 50 years is ____________ % (rounded off to the nearest integer).

Answer: 22 per cent Official key: 21 to 23

  1. Mean rate per year, so the expected number of events in 50 years is .
  2. Poisson: .
  3. per cent, so 22 per cent.

Trap: per cent treats probabilities as additive year after year and lies outside the key. The binomial form per cent is almost the same, since the annual probability is small.

Where this shows up in industry

Seismic hazard studies express design ground motion this way: a 475-year return period corresponds to about 10 per cent probability of exceedance in 50 years. The same Poisson formula sets the risk of a design flood being exceeded during the life of a dam or bridge.

GATE 2024 · CE2 · Q.36MCQ · 2 marksProbability and statistics: probability rules, distributions, expectation and regression

80 per cent heart attack risk, halved by medicine X taken by 50 of 100 patients: P(takes X and has an attack)?

In a sample of 100 heart patients, each patient has 80% chance of having a heart attack without medicine X. It is clinically known that medicine X reduces the probability of having a heart attack by 50%. Medicine X is taken by 50 of these 100 patients. The probability that a randomly selected patient, out of the 100 patients, takes medicine X and has a heart attack is

  1. (A)40%
  2. (B)60%
  3. (C)20%
  4. (D)30%

Answer: (C) 20% Official key: C

  1. .
  2. With medicine X the risk is halved: .
  3. Joint probability (multiplication rule):
  4. , that is (C) 20%, or 20 of the 100 patients.

Trap: (A) 40% is the conditional probability of an attack for a patient already known to take X, not the joint probability. (B) 60% is the overall chance of an attack, . Read “takes X and has a heart attack” as an intersection.

Where this shows up in industry

Joint and conditional probabilities are used in risk-based civil engineering: the chance that a bridge is both overloaded and corroded, that a flood occurs while a spillway gate is out of service, or that a slope fails given heavy rainfall, all feed reliability-based design and asset management decisions.

GATE 2025 · CE1 · Q.14MCQ · 1 markProbability and statistics: probability rules, distributions, expectation and regression

Variance of a random variable taking 0, 1, 7, 11 and 12 with probabilities 0.4, 0.3, 0.1, 0.1 and 0.1

is a random variable that can take any one of the values 0, 1, 7, 11, and 12. The probability mass function for is

; ; ;

;

Then, the variance of is

  1. (A)20.81
  2. (B)28.40
  3. (C)31.70
  4. (D)10.89

Answer: (A) 20.81 Official key: A

  1. Use the shortcut , which needs only two weighted sums over the five values.
  2. Mean: .
  3. Second moment: .
  4. Variance: 20.81, option (A).
  5. The probabilities add up to , so the distribution is valid.

Trap: every wrong option is a piece of the right working. (C) is alone, (D) is , and (B) subtracts the mean without squaring it.

Where this shows up in industry

Mean and variance of a discrete distribution are the first summary in reliability work: axle-load spectra from axle load surveys for IRC:37 pavement design, daily rainfall depths and cube results at a batching plant are all reduced to a mean and a spread before a characteristic or design value is chosen.

GATE 2025 · CE2 · Q.22MSQ · 1 markProbability and statistics: probability rules, distributions, expectation and regression

Mutually exclusive, independent and conditional probability: which statements about non-null A and B are correct?

Given that A and B are not null sets, which of the following statements regarding probability is/are CORRECT?

  1. (A), if A and B are mutually exclusive.
  2. (B)Conditional probability, if .
  3. (C), if A and B are mutually exclusive.
  4. (D), if A and B are independent.

Answer: (B, C) Official key: B;C

  1. (A) is wrong. Mutually exclusive means , so , while for non-null events. The product rule defines independence, not exclusivity.
  2. (B) is correct. If then , so : once has happened, has certainly happened.
  3. (C) is correct. , and the last term is 0 for mutually exclusive events.
  4. (D) is wrong. Independence means , which is not 0. With one fair die, and are independent: .
  5. Correct: (B) and (C).

Trap: (A) and (D) swap the definitions of mutually exclusive and independent. Two non-null events that cannot occur together are strongly dependent: knowing one happened rules out the other.

Where this shows up in industry

These rules underpin risk estimates in dam safety reviews and water supply planning in India: the chance that independent pumps or feeder mains fail together uses the product rule, and the chance of one of several mutually exclusive flood scenarios uses simple addition.

GATE 2025 · CE2 · Q.51NAT · 2 marksProbability and statistics: probability rules, distributions, expectation and regression

Standard deviation of a random variable taking 1, 2, 4 and 8 with probabilities 0.3, 0.1, 0.3 and 0.3

Consider a discrete random variable X whose probabilities are given below. The standard deviation of the random variable is ______ (round off to one decimal place).

1248
0.30.10.30.3

Answer: 2.8 Official key: 2.7 to 2.9

  1. The probabilities add up to , so the table is a valid distribution. Standard deviation is the square root of the variance, and .
  2. Mean: .
  3. Second moment: .
  4. Variance: .
  5. Standard deviation: , so 2.8.

Trap: stopping at the variance gives , outside the key. Taking forgets to subtract the square of the mean.

Where this shows up in industry

Standard deviation sets the margin in Indian concrete mix design: IS 10262 targets the characteristic strength plus 1.65 times the standard deviation of cube results, so a plant with a smaller spread can meet the same grade with less cement.

GATE 2026 · CE1 · Q.26NAT · 1 markProbability and statistics: probability rules, distributions, expectation and regression

A black ball is drawn from one of two bags chosen at random: what is the probability it came from Bag I?

Bag I contains 4 white and 6 black balls.

Bag II contains 4 white and 3 black balls.

One ball is drawn at random from any one of the two bags and it is found to be a black ball. The probability that the black ball was drawn from Bag I is ______ (rounded off to two decimal places).

Answer: 0.58 Official key: 0.50 to 0.66

  1. Either bag is equally likely: . The chance of black from each bag: and .
  2. Total probability of black: .
  3. Bayes' theorem: , so the answer is 0.58.
  4. The black ball makes Bag I more likely than the prior 1/2 because Bag I has the higher share of black balls (0.60 against 0.43).

Trap: pooling all 17 balls (9 black, 6 of them from Bag I) gives , which treats every ball as equally likely and ignores that each bag is picked with probability 1/2. The value 0.30 is the joint probability , not the conditional one.

Where this shows up in industry

Bayes' theorem is how engineers update a failure cause from evidence: if cubes from a pour fail and two batching plants supplied it, each plant's known rejection rate gives the chance the bad batch came from either; the same updating is used in reliability assessment of existing bridges after an inspection result.

GATE 2026 · CE2 · Q.47NAT · 2 marksProbability and statistics: probability rules, distributions, expectation and regression

Age is N(36, 12) and height N(160, 10): find h so that P(height above h) equals P(age above 50)

The age (in years) of a population is normally distributed with a mean of 36 and standard deviation of 12. The height (in cm) of the same population is also normally distributed with a mean of 160 and standard deviation of 10.

If the probability of age greater than 50 years is equal to the probability of height greater than h, the value of h (in cm) is ______ (rounded off to two decimal places).

Answer: 171.67 cm Official key: 170.00 to 173.00

  1. Two normal variables have equal upper-tail probabilities exactly when their standard scores are equal.
  2. Age: , so .
  3. Height: , so .
  4. Rounded: 171.67 cm. No table lookup is needed, because only equal z-values matter.

Trap: adding the same 14 units to the height mean gives , which ignores that the two standard deviations differ (12 against 10).

Where this shows up in industry

Standard scores drive concrete mix design: IS 10262 sets the target mean strength at fck + 1.65 s so that only 5 percent of cube results fall below the characteristic strength, and the same z-value logic is used to judge acceptance of cube and steel test results on site.

From GATE prep to a construction planning career

Talk to a counsellor.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.