GATE Civil: Hydrology and Irrigation (rainfall, infiltration, hydrographs, floods, groundwater, crop water, canals, dams), previous-year questions solved

Every hydrology and irrigation question from the ten official GATE Civil papers of 2022-2026 (CE1 and CE2 each year): 37 questions (22 NAT, 10 MCQ, 5 MSQ) on rainfall, evaporation and infiltration indices, runoff and unit hydrographs, reservoirs, flood frequency and routing, aquifers and well hydraulics, crop water requirements, and canals, dams and weirs, each solved step by step and checked by a script against the official key. The GATE 2027 syllabus adds streamflow measurement, river training works, earthen dams, seepage through dams and well irrigation.

Questions from the ten official GATE CE papers, sessions CE1 and CE2 of GATE 2022 (IIT Kharagpur), 2023 (IIT Kanpur), 2024 (IISc Bengaluru), 2025 (IIT Roorkee) and 2026 (IIT Guwahati); solutions by Skill-Lync. · Updated 17 Nov 2026 · 21 of 37 questions on this page

GATE 2022 · CE2 · Q.19MCQ · 1 markPrecipitation, evaporation and infiltration

Match Horton, Penman, Chezy, Lacey and Dicken with infiltration, ET, flow velocity, channels and floods

Match Column X with Column Y:

Column XColumn Y
(P) Horton equation(I) Design of alluvial channel
(Q) Penman method(II) Maximum flood discharge
(R) Chezy’s formula(III) Evapotranspiration
(S) Lacey’s theory(IV) Infiltration
(T) Dicken’s formula(V) Flow velocity

Which one of the following combinations is correct?

  1. (A)(P)-(IV), (Q)-(III), (R)-(V), (S)-(I), (T)-(II)
  2. (B)(P)-(III), (Q)-(IV), (R)-(V), (S)-(I), (T)-(II)
  3. (C)(P)-(IV), (Q)-(III), (R)-(II), (S)-(I), (T)-(V)
  4. (D)(P)-(III), (Q)-(IV), (R)-(I), (S)-(V), (T)-(II)

Answer: (A) (P)-(IV), (Q)-(III), (R)-(V), (S)-(I), (T)-(II) Official key: A

  1. Horton equation: infiltration capacity decaying with time, . (P)-(IV).
  2. Penman method: combines the energy balance and the aerodynamic (wind) term to estimate potential evapotranspiration. (Q)-(III).
  3. Chezy's formula: mean velocity of uniform flow, . (R)-(V).
  4. Lacey's regime theory: sizes stable alluvial channels from discharge and silt factor, e.g. . (S)-(I).
  5. Dicken's formula: empirical peak flood from catchment area, . (T)-(II).
  6. Only option (A) has all five. Answer: (A).

Trap: (B) swaps Horton and Penman, the two hydrologic-loss methods. Remember Horton's curve is in mm/h of infiltration, while Penman needs radiation, temperature, humidity and wind.

Where this shows up in industry

All five still appear in Indian practice: Horton or phi-index losses in design flood studies, Penman-Monteith for crop water demand, Lacey's equations for canals in alluvium, and Dicken's formula for a first estimate of floods from ungauged catchments in central and north India.

GATE 2023 · CE1 · Q.59NAT · 2 marksPrecipitation, evaporation and infiltration

Phi-index of a 12-hour storm with a trapezoidal hyetograph and 100 mm of direct runoff (MTA)

A 12-hour storm occurs over a catchment and results in a direct runoff depth of 100 mm. The time-distribution of the rainfall intensity is shown in the figure (not to scale). The -index of the storm is (in mm, rounded off to two decimal places) ________.

Hyetograph of a 12-hour storm: rainfall intensity rises linearly from 0 at time 0 to 20 mm per hour at 4 hours, stays at 20 mm per hour until 6 hours, then falls linearly to 0 at 12 hours20004612Time (hour)Rainfall intensity (mm/hour)

Answer: Marks to all (MTA); the excess-matching phi-index is 3.60 mm/h Official key: MTA

  1. Official key: marks to all. No reason is published. The blank asks for the -index in mm, although it is a rate in mm/h, and the usual shortcut fails here.
  2. Total rainfall = area of the hyetograph = mm, so losses are 40 mm.
  3. Shortcut: mm/h assumes rain exceeds for all 12 h. Near and h the intensity is below that, so less is lost than assumed and the excess above it is 102.8 mm, not 100 mm.
  4. Correct route: with , the excess is , so , and mm/h. Rain then exceeds from h to h.
  5. Answer: marks to all; = 3.60 mm/h by matching the 100 mm excess

Trap: reporting 3.33 mm/h, which is the W-index-style average loss rate over the whole storm, not the -index.

Where this shows up in industry

Hydrologists back-calculate a phi-index from observed storms on a gauged catchment and reuse it to turn design rainfall into rainfall excess for spillway and culvert design floods, so it must be found from the part of the storm that actually produces runoff.

GATE 2023 · CE1 · Q.61NAT · 2 marksPrecipitation, evaporation and infiltration

Total infiltration in a 12 h storm from Horton's equation with f0 = 10 mm/h, fc = 5 mm/h, k = 0.5 /h

In Horton’s equation fitted to the infiltration data for a soil, the initial infiltration capacity is 10 mm/h; final infiltration capacity is 5 mm/h; and the exponential decay constant is 0.5 /h. Assuming that the infiltration takes place at capacity rates, the total infiltration depth (in mm) from a uniform storm of duration 12 h is ________. (round off to one decimal place)

Answer: 70.0 mm Official key: 69.7 to 70.1

  1. Horton: , the infiltration capacity falling from 10 mm/h towards 5 mm/h as the soil wets up. Infiltration at capacity means the storm never runs short of water, so the depth is the area under this curve.
  2. .
  3. mm; mm.
  4. mm; a numerical integration of gives the same.
  5. Answer: 70.0 mm

Trap: dropping the term gives 9.98 mm, and holding the initial 10 mm/h for 12 h gives 120 mm; capacity decays towards 5 mm/h within a few hours.

Where this shows up in industry

Urban drainage and watershed models such as SWMM let engineers pick Horton infiltration for pervious areas, with the three parameters fitted to ring-infiltrometer tests on site soils, to estimate how much of a design storm becomes runoff.

GATE 2023 · CE2 · Q.21MCQ · 1 markPrecipitation, evaporation and infiltration

Match Horton equation, Muskingum method and Penman method with what each one is used for

Which one of the following options provides the correct match of the terms listed in Column-1 and Column-2?

Column-1Column-2
P: Horton equationI: Precipitation
Q: Muskingum methodII: Flood frequency
R: Penman methodIII: Evapotranspiration
IV: Infiltration
V: Channel routing

Choose the correct match.

  1. (A)P-IV, Q-V, R-III
  2. (B)P-III, Q-IV, R-I
  3. (C)P-IV, Q-III, R-II
  4. (D)P-III, Q-I, R-IV

Answer: (A) P-IV, Q-V, R-III Official key: A

  1. P, Horton equation: , the decay of infiltration capacity with time, so IV (infiltration).
  2. Q, Muskingum method: storage in a river reach, used to route a flood hydrograph down a channel, so V (channel routing).
  3. R, Penman method: combines the energy balance and an aerodynamic term to estimate potential evapotranspiration, so III.
  4. Precipitation (I) and flood frequency (II) are distractors with no partner in Column-1.
  5. Answer: (A) P-IV, Q-V, R-III

Trap: (C) pairs Muskingum with evapotranspiration and Penman with flood frequency; Muskingum is flood routing, which is not the same thing as flood frequency analysis.

Where this shows up in industry

These three methods sit inside everyday water resources tools: Horton loss rates in urban drainage models, Muskingum routing in HEC-HMS river reaches, and Penman-Monteith (FAO-56) reference evapotranspiration in crop water requirement studies.

GATE 2023 · CE2 · Q.62NAT · 2 marksPrecipitation, evaporation and infiltration

Thiessen mean annual rainfall over a 30 km radius circular catchment with one central and four boundary gauges

A catchment may be idealized as a circle of radius 30 km. There are five rain gauges, one at the center of the catchment and four on the boundary (equi-spaced), as shown in the figure (not to scale).

The annual rainfall recorded at these gauges in a particular year are given below.

GaugeG1G2G3G4G5
Rainfall (mm)910930925895905

Using the Thiessen polygon method, what is the average rainfall (in mm, rounded off to two decimal places) over the catchment in that year? ________

Circular catchment of radius 30 km with rain gauge G1 at the centre and gauges G2, G3, G4 and G5 equally spaced on the boundary, at right angles to each other as seen from G1G190°G2G3G4G5R = 30 km

Answer: 912.56 mm Official key: 912.28 to 912.82

  1. Thiessen polygons are bounded by the perpendicular bisectors between neighbouring gauges.
  2. G1 to each boundary gauge is 30 km, so its bisectors are the lines km: G1 owns a 30 km square, . Its corners lie km out, inside the circle.
  3. Catchment area . By symmetry each boundary gauge gets .
  4. The four boundary gauges add up to mm, so and mm. A nearest-gauge count on a fine grid gives 912.56 mm.
  5. Answer: 912.56 mm

Trap: the arithmetic mean of the five gauges is 913.00 mm, just outside the key, because the central gauge represents 31.8% of the area, not 20%.

Where this shows up in industry

State water resources departments and flood forecasting cells still compute catchment rainfall from rain gauge networks with Thiessen weights, usually built in GIS, before feeding it to runoff models for reservoir operation and flood warnings.

GATE 2024 · CE2 · Q.56NAT · 2 marksPrecipitation, evaporation and infiltration

Phi-index of an 8-hour storm of 11 cm that produced 6 cm of direct runoff

A storm with a recorded precipitation of 11.0 cm, as shown in the table, produced a direct run-off of 6.0 cm.

Time from start (hours)12345678
Recorded cumulative precipitation (cm)0.51.53.15.57.38.910.211.0

The -index of this storm is ____________ cm/hr (rounded off to 2 decimal places).

Answer: Official key: 0.64 to 0.65

  1. Hourly rainfall from the cumulative record: 0.5, 1.0, 1.6, 2.4, 1.8, 1.6, 1.3, 0.8 cm (total 11.0 cm).
  2. Losses . First trial over all 8 hours: . Hour 1 has only 0.5 cm, less than , so it produces no runoff and must be dropped.
  3. Second trial over the remaining 7 hours: rain , .
  4. Check: every one of those hours (lowest 0.8 cm) exceeds , and .
  5. Answer: (key 0.64 to 0.65).

Trap: stopping at the first trial, . The phi-index is defined only over the hours whose intensity exceeds it, so the trial has to be repeated.

Where this shows up in industry

Design flood studies by the Central Water Commission subtract a constant loss rate of this kind from the design storm to get effective rainfall before applying the unit hydrograph; the loss rate for a basin is calibrated from recorded storms exactly as in this question.

GATE 2025 · CE1 · Q.39MCQ · 2 marksPrecipitation, evaporation and infiltration

Four rain gauges, one outside the catchment, Thiessen weights given: Thiessen vs arithmetic mean rainfall

The mean rainfall over a catchment has to be estimated. The data for four rain gauges located in and around the catchment is listed in the table.

Rain gauge stationPQRS
Whether located inside the catchmentYesYesYesNo
Thiessen weightage factor0.250.500.100.15
Rainfall (mm)100110100125

Which one of the following statements is correct:

  1. (A)The estimate obtained from the Thiessen-mean method is greater than that obtained using the arithmetic-mean method
  2. (B)The estimate obtained from the Thiessen-mean method is equal to that obtained using the arithmetic-mean method
  3. (C)The estimate obtained from the Thiessen-mean method is less than that obtained using the arithmetic-mean method
  4. (D)The Thiessen-mean method cannot be applied in this case

Answer: (A) The Thiessen estimate is greater than the arithmetic mean Official key: A

  1. Thiessen method: each gauge gets the fraction of the catchment area that is closer to it than to any other gauge. A gauge just outside the boundary can still own part of the catchment, which is why S has a weight of 0.15. The weights add up to 1.
  2. .
  3. Arithmetic mean: only the gauges inside the catchment are averaged: .
  4. , so option (A). The Thiessen method can use outside gauges, so (D) is wrong.

Trap: averaging all four gauges gives , exactly the Thiessen value, and points to (B). The arithmetic mean is defined over the gauges inside the catchment.

Where this shows up in industry

Thiessen polygons are now drawn in a GIS (a Voronoi tool in QGIS) over the rain gauge network, and the weights feed the mean areal rainfall used for flood studies and reservoir inflow forecasts; gauges just outside the basin are kept because they inform the edges of the catchment.

GATE 2025 · CE1 · Q.61NAT · 2 marksPrecipitation, evaporation and infiltration

100 km trapezoidal canal, bed 10 m, 1:1 sides, depth 2.5 m, Class A pan 0.5 cm/day: April evaporation loss

A symmetrical trapezoidal canal is 100 km long. The bottom width is 10 m and the side slope is 1 Horizontal : 1 Vertical. The average flow depth in the canal is 2.5 m throughout the month of April. The measurement from a Class-A evaporimeter in the vicinity of the canal indicated an average evaporation rate of 0.5 cm/day in April.

The volume of water evaporated from the canal (in m3) in the month of April is close to ________ (rounded off to 1 decimal place).

Answer: Official key: 120.0 to 180.0

  1. Evaporation happens from the free water surface, so use the top width: .
  2. Water surface area: .
  3. A Class A pan evaporates more than a large water body (its thin water heats up and its sides take in heat), so lake evaporation = pan coefficient pan reading, with the standard .
  4. April has 30 days: depth lost .
  5. , i.e. (key 120.0 to 180.0; the range allows pan coefficients from about 0.53 to 0.8).

Trap: using the pan reading directly gives , and using the 10 m bed width instead of the water surface gives ; both are outside the key.

Where this shows up in industry

Evaporation from canals and reservoirs is a large item in the water budget of irrigation projects in hot months; it is estimated from India Meteorological Department Class A pan records with a pan coefficient near 0.7, and covering canals with solar panels, as tried on Gujarat's Narmada canals, cuts it.

GATE 2026 · CE2 · Q.20MCQ · 1 markPrecipitation, evaporation and infiltration

Mass curve of rainfall: can its slope be positive, and can it be zero

Following statements are made with respect to the mass curve of rainfall:

(I) Slope at a point on the curve can be positive.
(II) Slope at a point on the curve can be zero.

Which one of the following options is CORRECT?

  1. (A)Both statements (I) and (II) are TRUE.
  2. (B)Both statements (I) and (II) are FALSE.
  3. (C)Statement (I) is TRUE and statement (II) is FALSE.
  4. (D)Statement (I) is FALSE and statement (II) is TRUE.

Answer: (A) Both statements (I) and (II) are TRUE. Official key: A

  1. The mass curve of rainfall plots the cumulative rainfall depth against time, as recorded by a self-recording (siphon or tipping-bucket) rain gauge.
  2. Its slope is , the rainfall intensity at that instant. While it rains the intensity is positive, so the slope is positive: (I) is true.
  3. During a break in the storm no rain is added, so the curve runs horizontal and the slope is zero: (II) is true.
  4. A cumulative depth can never decrease, so the slope is never negative. Answer: (A) Both statements (I) and (II) are TRUE (official key: A).

Trap: picking (C) on the idea that rainfall is always falling while the curve exists. The curve continues through dry spells as a flat segment, which is exactly how storm durations and breaks are read from a gauge chart.

Where this shows up in industry

Hydrologists read intensity-duration data for drainage and culvert design off rainfall mass curves from IMD self-recording gauges: the steepest segments give the maximum intensities for each duration, and flat segments mark the breaks between storm bursts.

GATE 2022 · CE1 · Q.56NAT · 2 marksRunoff and hydrographs

Peak of the 1-hour unit hydrograph from a 2-hour, 3 cm storm hydrograph with a baseflow of 10 cumec

A two-hour duration storm event with uniform excess rainfall of 3 cm occurred on a watershed. The ordinates of streamflow hydrograph resulting from this event are given in the table.

Time (hours)01234567
Streamflow ()1016344031251610

Considering a constant baseflow of 10 m3/s, the peak flow ordinate (in m3/s) of one-hour unit hydrograph for the watershed is ________. (in integer)

Answer: Official key: 12 to 12

  1. Direct runoff = streamflow minus 10: 0, 6, 24, 30, 21, 15, 6, 0 at to 7 h.
  2. Divide by the 3 cm of excess rain to get the 2-hour unit hydrograph: 0, 2, 8, 10, 7, 5, 2, 0.
  3. S-curve: gives 0, 2, 8, 12, 15, 17, 17, 17.
  4. Offset the S-curve by 1 h and scale by : = 0, 4, 12, 8, 6, 4, 0, 0.
  5. Check: averaging two consecutive hours of rebuilds , and both have the same volume (catchment about 12.2 ).
  6. Peak of the 1-hour unit hydrograph: at h.

Trap: taking the peak of the 2-hour unit hydrograph (10) or dividing the peak streamflow by 3 without removing baseflow (13.3). A shorter unit hydrograph is peakier, so the 1-hour peak must exceed 10.

Where this shows up in industry

Unit hydrographs derived from gauged storms are how CWC flood estimation reports and spillway design floods are built: a design storm is broken into unit-duration blocks and convolved with the unit hydrograph, which is why converting between durations with the S-curve matters.

GATE 2023 · CE1 · Q.34NAT · 1 markRunoff and hydrographs

Duration D of a unit hydrograph built by superposing a one-hour unit hydrograph (ordinates 3 and 10)

The ordinates of a one-hour unit hydrograph for a catchment are given below:

t (hour)01234567
Q (m3/s)09211812520

Using the principle of superposition, a D-hour unit hydrograph for the catchment was derived from this one-hour unit hydrograph. The ordinates of the D-hour unit hydrograph were obtained as 3 m3/s at t = 1 hour and 10 m3/s at t = 2 hour. The value of D (in integer) is ________.

Answer: 3 Official key: 3 to 3

  1. A D-hour unit hydrograph (1 cm of excess spread over D hours) is the sum of D one-hour unit hydrographs, each lagged by 1 h, divided by D: .
  2. At h only the first one-hour hydrograph has started, so , giving .
  3. Check at h: , as given. A search over to 7 finds no other value that fits both ordinates.
  4. The full 3-hour ordinates are 0, 3, 10, 16, 17, 11.67, 6.33, 2.33, 0.67, 0 m3/s, and their sum equals that of the one-hour hydrograph (67), so both carry the same 1 cm of runoff.
  5. Answer: D = 3

Trap: dividing the one-hour ordinate at by the D-hour one, , forgets that the D-hour ordinate at 2 h also contains the lagged 9 from the first hour.

Where this shows up in industry

Flood forecasters and dam designers convert a catchment's unit hydrograph to the duration of the design storm in exactly this way, by lagging and superposing it or through an S-curve, before convolving it with the design rainfall excess.

GATE 2024 · CE1 · Q.56NAT · 2 marksRunoff and hydrographs

Peak of the 3-hour unit hydrograph derived from given 1-hour unit hydrograph ordinates

The ordinates of a 1-hour unit hydrograph (UH) are given below.

Time (hours)012345
Ordinates of 1-hour UH (m³/s)01350809585
Time (hours)67891011
Ordinates of 1-hour UH (m³/s)5535151030

These ordinates are used to derive a 3-hour UH. The peak discharge (in m³/s) for the derived 3-hour UH is ____________ (rounded off to the nearest integer).

Answer: Official key: 86 to 88

  1. A 3-hour storm of 1 cm effective rain is three back-to-back 1-hour storms of cm each. Because 3 h is a whole multiple of 1 h, no S-curve is needed: lag the 1-hour UH by 0, 1 and 2 hours, add, and divide by 3.
  2. .
  3. Largest three-hour sum: , , so (neighbours: gives 75, gives 78.33).
  4. Check: the ordinates of add up to the same 441 as , so the volume is still 1 cm of runoff.
  5. Answer: (key 86 to 88).

Trap: stopping at the sum (), which is the hydrograph of 3 cm of rain, or quoting the 1-hour peak of ; a longer storm spreads the same volume, so the peak must fall.

Where this shows up in industry

Flood estimation reports of the Central Water Commission give synthetic 1-hour unit hydrographs for each hydro-meteorological subzone; engineers convert them to the duration of the design storm in the same way to get design floods for culverts, bridges and small dams.

GATE 2025 · CE1 · Q.20MCQ · 1 markRunoff and hydrographs

Order of steps from an isolated storm to the total flood hydrograph at the catchment outlet

To derive the total flood hydrograph at a catchment outlet from an isolated storm, the order in which the following methods are applied, from the first method to the last method, is

P. Obtaining the hyetograph
Q. Addition of baseflow
R. Estimation of initial and infiltration losses
S. Application of unit hydrograph

  1. (A)PRSQ
  2. (B)PQRS
  3. (C)RPSQ
  4. (D)PSQR

Answer: (A) PRSQ Official key: A

  1. Start with the storm itself: the hyetograph (P), rainfall intensity against time, from the rain gauge records.
  2. Subtract the initial abstraction and infiltration losses (R), for example with a -index, to get the excess (effective) rainfall hyetograph. Only the excess becomes direct runoff.
  3. Apply the unit hydrograph (S): multiply its ordinates by each block of excess rainfall in cm, lag the blocks by the unit duration and add. This gives the direct runoff hydrograph.
  4. Add the base flow (Q), the groundwater contribution that was separated out when the unit hydrograph was derived, to get the total flood hydrograph.
  5. Order: P, R, S, Q, option (A).

Trap: (D) applies the unit hydrograph to the total rainfall and removes losses last; a unit hydrograph is defined for 1 cm of excess rainfall, so the losses must come off before the convolution, never after.

Where this shows up in industry

HEC-HMS, the free US Army Corps of Engineers model widely used in Indian flood studies, is organised in exactly this order: a meteorologic model supplies the hyetograph, then a loss method, a transform method such as a unit hydrograph, and finally a baseflow method for each sub-basin.

GATE 2025 · CE2 · Q.26MSQ · 1 markRunoff and hydrographs

Lower drainage density, all else equal: effect on the flood hydrograph peak and time base

In the context of the effect of drainage density on the run-off generation and the hydrograph at the catchment outlet, all other factors remaining the same, pick one or more CORRECT statement(s) from the choices given below.

  1. (A)Lower drainage density results in higher peak in flood hydrograph compared to that when the drainage density is higher.
  2. (B)Lower drainage density results in lower peak in flood hydrograph compared to that when the drainage density is higher.
  3. (C)Lower drainage density results in a flood hydrograph with a longer time base compared to that when the drainage density is higher.
  4. (D)Lower drainage density results in a flood hydrograph with a shorter time base compared to that when the drainage density is higher.

Answer: (B) and (C) Official key: B;C

  1. Drainage density is the total stream length per unit catchment area. With few streams, rain must travel a long way as slow overland flow before it reaches a channel.
  2. Slower travel spreads the same runoff volume over a longer time, so the hydrograph has a longer time base: (C) true, (D) false.
  3. With the volume fixed, a longer base means a lower peak. For a triangular hydrograph : with , a 30 h base gives against for an 18 h base. So the peak is lower: (B) true, (A) false.
  4. Answer: (B) and (C).

Trap: reading low drainage density as 'water stays on the land, so more runoff' and choosing (A). The runoff volume is the same by assumption; only its timing changes, and slower timing flattens the peak.

Where this shows up in industry

Drainage density is computed from a digital elevation model in GIS for ungauged catchments, and synthetic unit hydrograph methods such as those in the Central Water Commission flood estimation reports use stream length and slope in the same way to set the peak and time base.

GATE 2025 · CE2 · Q.59NAT · 2 marksRunoff and hydrographs

Flood peak 180 m3/s from a 3 h storm of 6.6 cm, loss 0.2 cm/h, base flow 30 m3/s: 3-h unit hydrograph peak

The peak of flood hydrograph due to a 3-hour duration storm in a catchment is 180 m3/s. The total rainfall depth is 6.6 cm. It can be assumed that the average infiltration loss is 0.2 cm/h. There are no other losses. The base flow is constant at a value of 30 m3/s.

The peak value of the 3-hour unit hydrograph for this catchment (in m3/s) is ______ (round off to the nearest integer).

Answer: Official key: 25 to 25

  1. A unit hydrograph is the direct runoff from 1 cm of excess rainfall in the unit duration, so remove both the base flow and the losses.
  2. Excess rainfall: (the -index loss acts for the full 3 hours).
  3. Direct runoff peak: .
  4. By linearity the 3-h UH ordinates are the direct runoff ordinates divided by the excess depth: , so (key 25 to 25).

Trap: forgetting to subtract the base flow gives , and dividing by the total 6.6 cm instead of the excess gives . Base flow is groundwater, not storm runoff, and losses never reach the stream.

Where this shows up in industry

The Central Water Commission flood estimation reports derive unit hydrographs this way from recorded storms and floods on gauged catchments, then regionalise them so that design floods for bridges and culverts on ungauged streams can be computed from the design storm.

GATE 2026 · CE1 · Q.64NAT · 2 marksRunoff and hydrographs

Rational-method design flow of a storm sewer for a 7 ha plot with I = 25/(t + 10) and C = 0.60

The intensity-duration relationship for a rainfall on a rectangular plot ABCD of area 7 ha (1 ha = 104 m2) can be modelled by the following equation:

where I is rainfall intensity (in cm/h), and t is the duration (in minutes) of rainfall. The average runoff coefficient over the area is 0.60. The time of entry (in minutes) to the outfall from the corners A, B, C, and D is 10, 20, 15 and 25, respectively.

The design flowrate (in m3/h) of the storm-sewer at the outfall is _____ (in integer).

Answer: Official key: 300 to 300

  1. The peak flow from the whole plot occurs when rain from the most remote point reaches the outfall, so the design duration is the time of concentration, the largest time of entry: (corner D).
  2. Design intensity: .
  3. Rational formula: .
  4. Answer: (key range 300 to 300).

Trap: using the shortest time of entry (10 min) gives and ; averaging the four times gives . A shorter duration means a higher intensity, but only part of the plot is then contributing, so the rational method always uses .

Where this shows up in industry

Municipal storm-water drains, road side drains and campus drainage in India are sized by the rational method as in the CPHEEO manual: an IDF curve from IMD rainfall, a runoff coefficient for the surface and the time of concentration of each catchment.

GATE 2022 · CE2 · Q.34NAT · 1 markReservoirs, floods and flood routing

Hydrologic risk of a flood control structure when the return period equals the life and both tend to infinity

A flood control structure having an expected life of years is designed by considering a flood of return period years. When , and , the structure’s hydrologic risk of failure in percentage is ______. (round off to one decimal place)

Answer: % Official key: 63.0 to 63.5

  1. The chance that the design flood is exceeded in any one year is , so the chance it is never exceeded in years is .
  2. Risk of at least one exceedance in the life: .
  3. With : . As , .
  4. %. Already at it is 63.40 %. Answer: % (key 63.0 to 63.5).

Trap: reporting itself, 36.8 %, which is the probability of surviving the life, not of failing. A 100-year flood is not “once in 100 years”: over a 100-year life it is more likely than not to occur.

Where this shows up in industry

This is why spillways of large dams are designed for the probable maximum flood rather than a 100-year flood, and why barrage and bridge designers pick a return period several times the design life to keep the risk to around 10 percent or less.

GATE 2025 · CE1 · Q.34NAT · 1 markReservoirs, floods and flood routing

Water resources project, 25-year life, acceptable risk 5%: return period of the design flood

A water resources project with an expected life of 25 years has to be designed for an acceptable risk of 5% against a design flood. The return period for the design flood (in years) is ________ (rounded off to the nearest integer).

Answer: years Official key: 476 to 500

  1. The chance that a -year flood is equalled or exceeded in any one year is , so the chance it does not occur in successive years is .
  2. Risk is the chance it occurs at least once in the life: .
  3. , so and .
  4. , so years (key 476 to 500). For small risks gives , which also lands inside the key.

Trap: taking years ignores the 25 years of exposure, and reading 5% as the chance of no flood gives years; a project designed for a 20-year flood would very likely see it in its 25-year life.

Where this shows up in industry

Diversion tunnels and cofferdams that protect a dam site during construction are sized this way: the designer picks an acceptable risk over the few years they must work, converts it to a return period, and reads the flood from a frequency analysis of the annual peak flows of the river.

GATE 2026 · CE1 · Q.55NAT · 2 marksReservoirs, floods and flood routing

Risk that a bridge with a 50-year life, designed for the 100-year flood, sees that flood exceeded

A bridge with an expected life of 50 years is designed for a flood of 10000 m3/s corresponding to the return period of 100 years. The risk associated with this design is ____________ (rounded off to two decimal places).

Answer: Official key: 0.38 to 0.41

  1. The annual exceedance probability of the 100-year flood is ; the chance it is not exceeded in a given year is .
  2. Years are independent, so the reliability over the life is .
  3. Risk, the probability that the design flood is equalled or exceeded at least once in the 50 years: .
  4. Answer: (key range 0.38 to 0.41).

Trap: is not a probability formula and is outside the key; nor is the reliability . The Poisson form is a close approximation and lands in the key. The flood magnitude, 10000 m/s, plays no part.

Where this shows up in industry

Bridge and dam designers use this risk relation the other way round: IRC SP 13 and CWC guidelines fix a design flood return period, and the risk over the service life shows why a 100-year flood still has roughly a 40 % chance of occurring during a 50-year bridge life.

GATE 2026 · CE2 · Q.32NAT · 1 markReservoirs, floods and flood routing

Probability that a storm with a 15-year return period occurs at least once in the next 10 years

The probability (in %) that a storm having return period of 15 years may occur in the next 10 years is ______ (rounded off to two decimal places).

Answer: Official key: 45.00 to 55.00

  1. Annual probability of the 15-year storm: . Probability it does not occur in a given year: .
  2. Probability of no occurrence in 10 independent years: .
  3. Probability of at least one occurrence: , that is .
  4. Answer: (key range 45.00 to 55.00).

Trap: gives , which is not a probability law and is outside the key. The chance of exactly one occurrence, , is also outside: may occur means at least once.

Where this shows up in industry

This at-least-once probability is how a design return period is chosen for culverts, urban drains and cofferdams: a cofferdam that stands for two construction seasons is designed for a flood whose chance of occurring within that short life is acceptably small.

GATE 2026 · CE2 · Q.43MSQ · 2 marksReservoirs, floods and flood routing

Match hydrologic, hydraulic, reservoir and channel routing with Muskingum, Modified Puls and characteristics

Types of flood routing and methods are given in the table below.

Column 1: Type of Flood RoutingColumn 2: Method
(P) Hydrologic routing(i) Muskingum method
(Q) Hydraulic routing(ii) Modified Pul’s method
(R) Reservoir routing(iii) Method of Characteristics
(S) Channel routing

Option(s) giving the CORRECT match(es) between Column 1 and Column 2 is/are:

  1. (A)(P) – (i) ; (Q) – (iii) ; (R) – (ii)
  2. (B)(Q) – (i) ; (R) – (iii) ; (S) – (ii)
  3. (C)(P) – (i) ; (R) – (ii) ; (S) – (i)
  4. (D)(P) – (ii) ; (Q) – (iii) ; (R) – (ii)

Answer: (A), (C) and (D) Official key: A;C;D

  1. Hydrologic routing uses only the continuity (storage) equation, , with an assumed storage relation. Both the Muskingum method (, for river reaches) and the Modified Puls method (level-pool storage, for reservoirs) are hydrologic, so (P) matches (i) and (ii).
  2. Hydraulic routing solves the Saint-Venant equations (continuity and momentum); the method of characteristics is one way to solve them, so (Q) – (iii).
  3. Reservoir routing is level-pool routing: (R) – (ii). Channel routing is done by Muskingum (or hydraulically): (S) – (i).
  4. (A), (C) and (D) contain only valid pairs. (B) pairs hydraulic routing with Muskingum and reservoir routing with characteristics, both wrong. Answer: (A), (C) and (D) (official key: A;C;D).

Trap: treating the table as a one-to-one match and rejecting (D) because Modified Puls is listed against reservoir routing too. A method can belong to a type (hydrologic) and to an application (reservoir) at once.

Where this shows up in industry

Reservoir operators route design floods through spillways with the Modified Puls method to fix the maximum water level and spillway size, while flood forecasting on Indian rivers uses Muskingum for quick reach routing and full Saint-Venant models such as HEC-RAS unsteady flow.

From GATE prep to a water resources and flood engineering career

Talk to a counsellor.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.