GATE Civil: Foundation Engineering (site investigation, stress distribution, earth pressure, slope stability, shallow foundations, piles), previous-year questions solved, part 3

Part 3 of 3 of the Foundation Engineering hub: 10 more official GATE CE questions on deep foundations: piles and pile groups, each solved step by step and checked against the official answer key. Part 1 covers site investigation and in-situ tests, stress distribution in soil, earth pressure and retaining walls, stability of slopes and shallow foundations: bearing capacity and settlement.

Questions from the ten official GATE CE papers, sessions CE1 and CE2 of GATE 2022 (IIT Kharagpur), 2023 (IIT Kanpur), 2024 (IISc Bengaluru), 2025 (IIT Roorkee) and 2026 (IIT Guwahati); solutions by Skill-Lync. · Updated 17 Nov 2026 · 10 of 43 questions on this page

GATE 2022 · CE1 · Q.54NAT · 2 marksDeep foundations: piles and pile groups

Width of a 10 m square driven pile in clay for an ultimate capacity of 632 kN (Nc = 9, alpha = 0.7)

A square concrete pile of 10 m length is driven into a deep layer of uniform homogeneous clay. Average unconfined compressive strength of the clay, determined through laboratory tests on undisturbed samples extracted from the clay layer, is 100 kPa. If the ultimate compressive load capacity of the driven pile is 632 kN, the required width of the pile is _______ mm. (in integer)

(Bearing capacity factor ; adhesion factor )

Answer: Official key: 400 to 400

  1. Undrained strength: kPa.
  2. Static formula (IS 2911 form, ): .
  3. Base: . Shaft: .
  4. , so m.
  5. Check: base 72 kN + shaft 560 kN = 632 kN. Answer: .

Trap: using the unconfined compressive strength itself as (100 kPa) gives mm. The UCS is twice the undrained shear strength.

Where this shows up in industry

Precast driven piles for jetties, bridges and industrial sheds on soft to medium clay are sized with this IS 2911 (Part 1/Sec 3) static formula, and the result is then confirmed by an initial pile load test before working piles are cast.

GATE 2022 · CE2 · Q.54NAT · 2 marksDeep foundations: piles and pile groups

Design capacity of a 4 x 4 pile group (1 m piles at 3 m spacing) by the Converse-Labarre efficiency formula

A group of total 16 piles are arranged in a square grid format. The center-to-center spacing () between adjacent piles is 3 m. The diameter () and length of embedment of each pile are 1 m and 20 m, respectively. The design capacity of each pile is 1000 kN in the vertical downward direction. The pile group efficiency () is given by

where and are number of rows and columns in the plan grid of pile arrangement, and .

The design value of the pile group capacity (in kN) in the vertical downward direction is __________________. (round off to the nearest integer)

Answer: Official key: 11000 to 11200

  1. Square grid of 16 piles: .
  2. . The formula divides by 90, so must be in degrees.
  3. Bracket: .
  4. .
  5. kN. Answer: (key 11000 to 11200).

Trap: putting in radians (0.322) gives and 15914 kN, and ignoring group action gives 16000 kN; both are outside the key. The embedment length of 20 m is not needed.

Where this shows up in industry

Bridge piers and heavy industrial foundations in India often sit on groups of 1 m to 1.2 m bored piles; IS 2911 calls for group action to be considered for friction piles, and Converse-Labarre is a common way to estimate the group efficiency.

GATE 2023 · CE1 · Q.17MCQ · 1 markDeep foundations: piles and pile groups

Centre-to-centre spacing of a 3 x 3 group of 300 mm friction piles in sand for 60% group efficiency (MTA)

A group of 9 friction piles are arranged in a square grid maintaining equal spacing in all directions. Each pile is of diameter 300 mm and length 7 m. Assume that the soil is cohesionless with effective friction angle . What is the center-to-center spacing of the piles (in m) for the pile group efficiency of 60%?

  1. (A)0.582
  2. (B)0.486
  3. (C)0.391
  4. (D)0.677

Answer: Marks to all (MTA); block-perimeter method gives (B) 0.486 m Official key: MTA

  1. Official key: marks to all. No reason is published; the two standard routes below land on different options, which is the likely cause.
  2. Block-perimeter route: with the same unit skin friction on the block face and on each pile, , so and cancel. m gives m, option (B).
  3. Converse-Labarre route: , so and m, which is not an option; (A) gives .
  4. Physically, is far below the usual minimum of 2.5d to 3d, and driven friction piles in sand usually show .
  5. Answer: marks to all; the block-perimeter reading gives (B) 0.486 m

Trap: taking the block width as instead of gives m, which matches no option.

Where this shows up in industry

Designers of pile groups under bridge piers and building cores compare the summed capacity of the individual piles with the block (equivalent pier) capacity and adopt the smaller, and keep the spacing at or above about 2.5 to 3 pile diameters so the group does not fail as a block.

GATE 2023 · CE2 · Q.59NAT · 2 marksDeep foundations: piles and pile groups

Allowable load of a 0.6 m diameter, 8 m long pile in clay with cohesion 25 kPa by the alpha method, FS = 3

A circular pile of diameter 0.6 m and length 8 m was constructed in a cohesive soil stratum having the following properties: bulk unit weight = 19 kN/m3; angle of internal friction = 0° and cohesion = 25 kPa.

The allowable load the pile can carry with a factor of safety of 3 is ________ kN (round off to one decimal place).

[Adopt: Adhesion factor, and Bearing capacity factor, ]

Answer: Official key: 145.0 to 149.0

  1. Static formula for a pile in clay (): . With the overburden term at the base roughly balances the pile's self-weight, so is not needed.
  2. Shaft: , kN.
  3. Base: , kN.
  4. kN, kN
  5. kN

Trap: leaving out the end bearing gives 125.7 kN, and using for the base area gives 210.5 kN. The base is small but not negligible here (about 14% of ).

Where this shows up in industry

Bored cast-in-situ piles in soft clay for flyovers, metro viaducts and buildings are first sized with this static formula as in IS 2911 (Part 1), then the design load is confirmed by an initial pile load test before the working piles are cast.

GATE 2024 · CE2 · Q.34NAT · 1 markDeep foundations: piles and pile groups

Net ultimate uplift capacity of a 10 m long, 0.7 m diameter pile in clay with c = 50 kPa and alpha 0.5

A reinforced concrete pile of 10 m length and 0.7 m diameter is embedded in a saturated pure clay with unit cohesion of 50 kPa. If the adhesion factor is 0.5, the net ultimate uplift pullout capacity (in kN) of the pile is ________________ (rounded off to the nearest integer).

Answer: Official key: 545 to 555

  1. A pile pulled upward resists only by shaft adhesion; there is no end bearing in tension. Net uplift capacity excludes the pile's own weight.
  2. Alpha method (IS 2911 Part 1/Sec 2): unit skin resistance .
  3. Shaft surface area: .
  4. (check: per metre of shaft over 10 m).
  5. Answer: (key 545 to 555).

Trap: adding the pile weight ( gives ) turns this into the gross capacity, ; adding an end bearing as in compression gives . Neither belongs in a net pullout capacity.

Where this shows up in industry

Uplift capacity by the alpha method governs bored piles under transmission-line towers and telecom masts, basements resisting buoyancy, and under-reamed piles in black cotton soil (IS 2911 Part 3), where swelling clay tries to lift the pile; IS 2911 (Part 4) pull-out load tests are used to confirm the design value.

GATE 2025 · CE1 · Q.58NAT · 2 marksDeep foundations: piles and pile groups

450 mm driven pile in clay, cu = 20 kPa, alpha = 0.95, Nc = 9, 144 kN at FS 3: required embedment depth

A single pile with 450 mm diameter has been driven into a homogeneous clay layer, which has an undrained cohesion () of 20 kPa and unit weight of 18 kN/m3. The ground water table is found to be at the surface of the clay layer. The adhesion factor () of the soil is 0.95 and bearing capacity factor () is 9. The pile is supporting a column load of 144 kN with a factor of safety of 3.0 against ultimate axial pile capacity in compression.

The required embedment depth of the pile (in m) is _______________ (rounded off to the nearest integer).

Answer: Official key: 15 to 16

  1. Required ultimate capacity: .
  2. Static formula for a pile in clay (IS 2911 Part 1): . In the case the unit weight and water table do not enter.
  3. End bearing: , .
  4. Skin friction per metre: .
  5. , so (key 15 to 16). Ignoring the small tip load gives m, which the key range also accepts.

Trap: designing for the working load instead of the ultimate, ; the factor of safety must be applied first, so the pile needs .

Where this shows up in industry

Precast driven piles for jetties, bridges and buildings on soft marine clay (Mumbai, Kochi, Kolkata) are first sized with this IS 2911 (Part 1/Sec 3) alpha formula to fix the toe level, which is then confirmed by an initial vertical load test to IS 2911 (Part 4) before the working piles are driven.

GATE 2025 · CE2 · Q.57NAT · 2 marksDeep foundations: piles and pile groups

4 x 4 friction pile group in clay, 20 m long, 500 mm piles, qu = 100 kPa, alpha 0.8: spacing for efficiency 1

A 4 4 group pile, with each pile 20 m long and 500 mm in diameter, is installed in a square pattern in a clayey soil, as shown in the figure. The average unconfined compressive strength of the soil is 100 kN/m2, and the adhesion factor is 0.8. Neglect the bearing at the tip of the piles. For a group efficiency factor of 1.0, the centre to centre spacing (s) of the piles (in m) would be ________ (round off to two decimal places).

Pile group: elevation of four of the 20 m long piles in clay joined by a cap at ground level, and plan of the 4 by 4 square group with centre-to-centre spacing s in both directionsGround level20 mClaysssPlanElevation

Answer: Official key: 1.50 to 1.52

  1. Cohesion: . Tip bearing is neglected, so only friction counts.
  2. Piles acting individually: .
  3. Block failure: the group acts as one block of width ; its sides shear through clay against clay, so full (no ): .
  4. Efficiency 1.0 means : , so .
  5. , so (key 1.50 to 1.52), about . At closer spacing block failure governs and the efficiency drops below 1.

Trap: taking the block width as (centre line to centre line) leaves out half a pile on each side and gives , outside the key.

Where this shows up in industry

Pile groups under bridge piers and building columns in soft clay are checked to IS 2911 (Part 1) both as individual piles and as an equivalent block, and IS 2911 asks for a spacing of not less than about three diameters for friction piles, close to the 1.51 m (3d) found here.

GATE 2026 · CE1 · Q.57NAT · 2 marksDeep foundations: piles and pile groups

Capacity ratio of 1200 mm to 600 mm diameter, 6 m long piles in clay with cu = 80 kPa and adhesion factor 0.54

A circular pile of 600 mm diameter and 6 m length is embedded in a saturated clayey soil. Undrained cohesion of the soil is 80 kPa. Unit weight of the soil is 19.20 kN/m3. The adhesion factor is 0.54. If the diameter of the pile is doubled to 1200 mm (keeping the length constant), the ratio of pile capacity of 1200 mm diameter pile to that of 600 mm diameter pile is ______ (rounded off to two decimal places).

Answer: Official key: 2.50 to 2.65

  1. Undrained capacity (IS 2911 Part 1/Sec 2, Annex B): with .
  2. 600 mm pile: , . , , .
  3. 1200 mm pile: base area is 4 times and shaft area 2 times, so , , .
  4. Ratio . The unit weight is not needed: the overburden at the base is offset by the pile's own weight in the net capacity (adding it anyway gives 2.652, still inside the key). Answer: (key range 2.50 to 2.65).

Trap: treating the pile as friction only gives a ratio of 2.00 (shaft area doubles), and scaling everything with area gives 4. The answer lies between because the base share grows with and the shaft share with .

Where this shows up in industry

Designers of bored cast-in-situ piles in soft to stiff clay (for example Kolkata and Mumbai marine clays) run exactly this static formula from IS 2911 for each candidate diameter, then compare the capacity gained per cubic metre of concrete before fixing the pile diameter and confirming it with an initial load test.

GATE 2026 · CE1 · Q.58NAT · 2 marksDeep foundations: piles and pile groups

Spacing-to-diameter ratio of a 5 x 5 group of 1 m friction piles in soft clay for a group efficiency of unity

A group of 25 circular piles is arranged in 5 × 5 uniform pattern in a soft clay soil with equal spacing in both the directions. These are friction piles with negligible end bearing.

Consider the following details:

Diameter of each pile = 1 m
Length of each pile = 15 m
Cohesion of the soil = 20 kN/m2
Unit weight of the soil = 16 kN/m3
Adhesion factor = 0.75

Considering the efficiency of the pile group as unity, the optimum value of the ratio of the pile spacing to pile diameter is ________________ (rounded off to one decimal place).

Answer: Official key: 3.2 to 3.6

  1. Single pile (friction only): ; 25 piles give .
  2. Block failure: the group fails as one block of side , with full cohesion (, soil against soil) on its perimeter and, as stated, negligible base resistance: .
  3. Efficiency of unity is the optimum spacing where the two modes give the same capacity: , so .
  4. , so . Cohesion and length cancel; the unit weight is not needed. Answer: (key range 3.2 to 3.6).

Trap: taking the block width as and forgetting the half-diameter of the outer piles on each side gives , outside the key. The block perimeter runs along the outer faces of the corner piles.

Where this shows up in industry

For pile groups in soft clay under bridge piers and storage tanks, IS 2911 asks for the group capacity as the lesser of n times the single pile and the block capacity; designers use this break-even spacing to lay out the pile cap so that closer spacing does not cut the group's capacity.

GATE 2026 · CE2 · Q.22MCQ · 1 markDeep foundations: piles and pile groups

Match Converse-Labarre, Hiley, Newmark's chart and Skempton's equation with their uses in foundation design

Information related to foundation design is provided in table below.

Column 1Column 2
(I) Converse-Labarre formula(P) Pile capacity from dynamic formula
(II) Hiley formula(Q) Pile group efficiency
(III) Newmark’s influence chart(R) Bearing capacity factor of saturated clay
(IV) Skempton’s equation(S) Increase in vertical stress below footing

Option giving the CORRECT match between Column 1 and Column 2 is:

  1. (A)(I) – (Q); (II) – (P); (III) – (S); (IV) – (R)
  2. (B)(I) – (R); (II) – (S); (III) – (Q); (IV) – (P)
  3. (C)(I) – (P); (II) – (Q); (III) – (S); (IV) – (R)
  4. (D)(I) – (R); (II) – (S); (III) – (P); (IV) – (Q)

Answer: (A) (I) – (Q); (II) – (P); (III) – (S); (IV) – (R) Official key: A

  1. Converse-Labarre gives the efficiency of a friction pile group: with in degrees. So (I) – (Q).
  2. Hiley's formula equates hammer energy, less impact and elastic losses, to the work done by the pile against the ground: a dynamic pile formula (IS 2911 Part 1). So (II) – (P).
  3. Newmark's influence chart sums the vertical stress increase under a uniformly loaded area of any shape, from Boussinesq's solution. So (III) – (S).
  4. Skempton's equation gives for footings on saturated clay (), e.g. up to . So (IV) – (R).
  5. Answer: (A) (I) – (Q); (II) – (P); (III) – (S); (IV) – (R) (official key: A).

Trap: (C) swaps the two pile formulas. Both are about piles, but Converse-Labarre has no hammer or set in it; it only uses the group geometry , and .

Where this shows up in industry

On a single bridge or building project an Indian geotechnical engineer may use all four: Skempton's for raft or footing capacity on clay, Newmark or Boussinesq for stress below footings in settlement work, Hiley's formula to set the driving criterion for precast piles, and a group efficiency check for the pile cap.

From GATE prep to a geotechnical and foundation design career

Talk to a counsellor.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.