GATE Civil: Hydrology and Irrigation (rainfall, infiltration, hydrographs, floods, groundwater, crop water, canals, dams), previous-year questions solved, part 2

Part 2 of 2 of the Hydrology and Irrigation hub: 16 more official GATE CE questions on groundwater and well hydraulics, irrigation water requirements and canals, dams and hydraulic structures, each solved step by step and checked against the official answer key. Part 1 covers precipitation, evaporation and infiltration, runoff and hydrographs and reservoirs, floods and flood routing.

Questions from the ten official GATE CE papers, sessions CE1 and CE2 of GATE 2022 (IIT Kharagpur), 2023 (IIT Kanpur), 2024 (IISc Bengaluru), 2025 (IIT Roorkee) and 2026 (IIT Guwahati); solutions by Skill-Lync. · Updated 17 Nov 2026 · 16 of 37 questions on this page

GATE 2024 · CE1 · Q.35NAT · 1 markGroundwater and well hydraulics

Steady pumping rate of a well in a 20 m unconfined aquifer from drawdowns at 10 m and 100 m (Dupuit)

A 30 cm diameter well fully penetrates an unconfined aquifer of saturated thickness 20 m with hydraulic conductivity of 10 m/day. Under the steady pumping rate for a long time, the drawdowns in two observation wells located at 10 m and 100 m from the pumping well are 5 m and 1 m, respectively. The corresponding pumping rate (in m³/day) from the well is ____________ (rounded off to 2 decimal places).

Answer: Official key: 1852.00 to 1858.00

  1. Unconfined aquifer, steady radial flow: Dupuit's equation , where is the saturated thickness at radius measured from the impervious base.
  2. at ; at . The 30 cm well diameter is not needed because both heads come from observation wells.
  3. and .
  4. .
  5. Answer: (key 1852 to 1858).

Trap: the confined (Thiem) form with gives ; it ignores the drop in saturated thickness near the well. Using in place of gives .

Where this shows up in industry

Pumping tests on tube wells, as done by the Central Ground Water Board during aquifer mapping, use exactly this pair of observation-well drawdowns to back out hydraulic conductivity or to set a safe yield, so that drawdown at neighbouring village wells stays within limits.

GATE 2025 · CE2 · Q.58NAT · 2 marksGroundwater and well hydraulics

60 cm well fully penetrating a 10 m confined aquifer, K = 0.0005 m/s, drawdown 1 m, R = 300 m: discharge

A 60 cm diameter well completely penetrates a confined aquifer of permeability m/s. The length of the strainer (spanning the entire thickness of the aquifer) is 10 m. The drawdown at the well under steady state pumping is 1.0 m. Assume that the radius of influence for this pumping is 300 m.

The discharge from the well (in litres per minute) is ______ (round off to the nearest integer).

Answer: Official key: 271 to 273

  1. Steady radial flow to a well in a confined aquifer (Thiem): , with the aquifer thickness = strainer length = 10 m.
  2. Transmissivity ; well radius m (half the 60 cm diameter).
  3. .
  4. .
  5. In litres per minute: , so (key 271 to 273).

Trap: using the 0.6 m diameter as gives L/min, and using without the factor 2.303 gives L/min; both are outside the key.

Where this shows up in industry

Tube wells for town water supply and irrigation are sized from pumping tests: the aquifer transmissivity found by the Thiem or Theis method, together with the allowable drawdown, sets the yield, and the Central Ground Water Board publishes such aquifer parameters for most districts.

GATE 2026 · CE1 · Q.53NAT · 2 marksGroundwater and well hydraulics

Transmissibility of a 30 m unconfined aquifer from drawdowns of 12 m and 11 m at 10 m and 100 m (Dupuit-Thiem)

A fully-penetrating well of 20 cm diameter is provided in an unconfined aquifer. The height of the ground water table is 30 m from the bottom of the aquifer. After a long period of pumping at a rate of 63 m3/s, the drawdown in the observation wells at 10 m and 100 m from the pumped well is 12 m and 11 m, respectively. The transmissibility (in m2/s) of the aquifer is ______ (rounded off to one decimal place).

Answer: Official key: 35.0 to 40.0

  1. Saturated thickness at the observation wells: at and at .
  2. Steady flow to a well in an unconfined aquifer (Dupuit-Thiem): .
  3. .
  4. Transmissibility is times the saturated thickness of the aquifer, : . The well diameter is not needed because both heads are read at the observation wells.
  5. Answer: (key range 35.0 to 40.0).

Trap: multiplying by the mean saturated depth between the wells, 18.5 m, gives , and using in place of gives ; both fall outside the key.

Where this shows up in industry

Groundwater surveys by the Central Ground Water Board and consultants for municipal and industrial borewells run exactly this test: pump at a steady rate, read the drawdown in two observation wells, and back-calculate the aquifer's permeability and transmissivity to fix well spacing and safe yield.

GATE 2022 · CE1 · Q.34NAT · 1 markIrrigation water requirements

Interval between irrigations for consumptive use 2.8 mm/day and 50 % of 80 mm available water (MTA)

During a particular stage of the growth of a crop, the consumptive use of water is 2.8 mm/day. The amount of water available in the soil is 50 % of the maximum depth of available water in the root zone. Consider the maximum root zone depth of the crop as 80 mm and the irrigation efficiency as 70 %.

The interval between irrigation (in days) will be _________. (round off to the nearest integer)

Answer: Marks to all (MTA); the standard reading gives 14 days Official key: MTA

  1. The 80 mm is the maximum depth of available water held in the root zone. The crop is irrigated when it has used the allowed half of it, so the depth used between irrigations is mm.
  2. The crop draws this down at the consumptive use rate, so the interval is days, about 14 days.
  3. The irrigation efficiency does not change the interval. It sets the gross depth to apply each time: mm, so that 40 mm actually stays in the root zone.
  4. GATE awarded marks to all for this question. The likely reasons: the 80 mm is called a root zone depth although it is a depth of water, and multiplying by the 70 % efficiency gives days, another defensible-looking answer.

Trap: dividing the full 80 mm by 2.8 mm/day gives 29 days, which would let the soil dry to the wilting point before the next watering.

Where this shows up in industry

Canal and drip irrigation schedules are planned exactly this way: a management allowed depletion of about half the available water, divided by the crop's daily water use from FAO-56, gives the rotation period between turns of water.

GATE 2022 · CE2 · Q.20MCQ · 1 markIrrigation water requirements

Actual evapotranspiration from reference ET 6 mm/day, crop coefficient 1.2 and soil coefficient 0.8

In a certain month, the reference crop evapotranspiration at a location is 6 mm/day. If the crop coefficient and soil coefficient are 1.2 and 0.8, respectively, the actual evapotranspiration in mm/day is

  1. (A)5.76
  2. (B)7.20
  3. (C)6.80
  4. (D)8.00

Answer: (A) 5.76 Official key: A

  1. The reference evapotranspiration is the water use of a well-watered reference grass surface; it depends on the weather alone.
  2. The crop coefficient converts it to the crop's own demand under ideal soil water: mm/day.
  3. When the soil is drier than ideal the crop transpires less. The soil (water stress) coefficient scales it down: mm/day.
  4. Answer: (A) 5.76 mm/day.

Trap: stopping at mm/day, option (B). That is the potential crop demand; the question asks for the actual value with the soil coefficient applied.

Where this shows up in industry

FAO-56, used by state irrigation departments to plan canal releases and drip schedules, computes crop water use as Ks times Kc times ET0, with ET0 from Penman-Monteith weather data and Kc taken from crop-stage tables.

GATE 2022 · CE2 · Q.57NAT · 2 marksIrrigation water requirements

Minimum pump horsepower for 108 ha of paddy: delta 144 cm, base period 120 days, 10 m lift

A pump with an efficiency of 80% is used to draw groundwater from a well for irrigating a flat field of area 108 hectares. The base period and delta for paddy crop on this field are 120 days and 144 cm, respectively. Water application efficiency in the field is 80%. The lowest level of water in the well is 10 m below the ground. The minimum required horse power (h.p.) of the pump is ________. (round off to two decimal places)

(Consider 1 h.p. = 746 W; unit weight of water = 9810 N/m3)

Answer: h.p. Official key: 30.00 to 32.00

  1. Water the crop needs at the field: over 120 days.
  2. Only 80 % of the water applied stays in the root zone, so the well must supply .
  3. Continuous discharge: .
  4. Lift from the lowest well level: m. Pump power: W.
  5. h.p. Answer: h.p. (key 30.00 to 32.00).

Trap: leaving out both efficiencies gives 19.73 h.p., and leaving out only the pump efficiency gives 24.66 h.p.; both are outside the key. The duty here is ha per cumec at the field.

Where this shows up in industry

Tube-well irrigation of paddy in Punjab, Haryana and Bihar is sized this way, and the same sum explains the falling water table: lifting more than a metre of water over every hectare each season takes a lot of energy, much of it from subsidised farm power.

GATE 2023 · CE1 · Q.33NAT · 1 markIrrigation water requirements

Minimum canal discharge for 100 ha of wheat when 12 cm is needed in the most intense 30-day period

A canal supplies water to an area growing wheat over 100 hectares. The duration between the first and last watering is 120 days, and the total depth of water required by the crop is 35 cm. The most intense watering is required over a period of 30 days and requires a total depth of water equal to 12 cm. Assuming precipitation to be negligible and neglecting all losses, the minimum discharge (in m3/s, rounded off to three decimal places) in the canal to satisfy the crop requirement is ________.

Answer: 0.046 Official key: 0.045 to 0.047

  1. The canal must keep up with the crop when demand peaks, so size it on the most intense period, not on the season average.
  2. Volume in the peak period: .
  3. Duration: s, so .
  4. Check with duty: ha per cumec, and .
  5. Answer: 0.046 m³/s

Trap: spreading the full 35 cm over 120 days gives , which would leave the crop short for the whole peak month.

Where this shows up in industry

Irrigation departments size distributary and minor canals on the peak (kor) watering demand of the dominant crop, then add conveyance and field losses, because a channel sized on the seasonal average cannot deliver the critical watering on time.

GATE 2026 · CE1 · Q.17MCQ · 1 markIrrigation water requirements

Duty on capacity of a canal delivering 10 cumec to 7500 ha when losses are 50 % of the head discharge

An irrigation canal is to be designed to deliver 10 cumec to meet the peak demand of 7500 hectare of cropped area. The estimated canal losses are 50 % of the head discharge. The duty (in hectare/cumec) on capacity of this canal is

  1. (A)375
  2. (B)1125
  3. (C)1500
  4. (D)1875

Answer: (A) 375 Official key: A

  1. The 10 cumec is what must reach the fields. Losses are a fraction of the discharge at the head: , so .
  2. The canal is sized for its head discharge, so its capacity is .
  3. Duty on capacity = area served per cumec of canal capacity .
  4. Answer: (A) 375 (official key: A).

Trap: taking the losses off the 10 cumec () gives , option (C). The losses come out of the head discharge, so the head must carry more than the fields receive. The duty at the outlets, , is higher than the duty on capacity because it ignores the water lost on the way.

Where this shows up in industry

State irrigation departments size main and branch canals on the duty on capacity: the command area and the crop's outlet duty are converted to head discharge with seepage and evaporation losses, which in unlined Indian canals often take 30 to 50 % of the water released.

GATE 2026 · CE2 · Q.19MCQ · 1 markIrrigation water requirements

Outlet discharge for a CCA of 10000 ha, base period 140 days and watering depth (delta) 40 cm

The Culturable Command Area (CCA) for a canal is 10000 hectares. The base period for a crop in the CCA is 140 days. Watering depth for the crop is 40 cm. The outlet discharge (in m3/s) lies between

  1. (A)3 and 4
  2. (B)13 and 14
  3. (C)23 and 24
  4. (D)33 and 34

Answer: (A) 3 and 4 Official key: A

  1. Duty and delta are linked by with in days and in metres: .
  2. Outlet discharge .
  3. Check by volume: spread over gives the same .
  4. Answer: (A) 3 and 4 (official key: A).

Trap: the factor 8.64 needs in metres; putting in 40 (cm) gives and an absurd (with in cm the factor is 864). Taking a hectare as gives , option (D). A hectare is .

Where this shows up in industry

Outlet and distributary capacities in a command area are worked out this way from the crop's delta and base period; the same duty-delta relation lets canal officers check whether a proposed cropping pattern can be supplied from the available head discharge.

GATE 2022 · CE1 · Q.47MSQ · 2 marksCanals, dams and hydraulic structures

Cross-drainage works: where the drain runs in an aqueduct, super-passage, level crossing and canal syphon

In the context of cross-drainage structures, the correct statement(s) regarding the relative positions of a natural drain (stream/river) and an irrigation canal, is/are

  1. (A)In an aqueduct, natural drain water goes under the irrigation canal, whereas in a super-passage, natural drain water goes over the irrigation canal.
  2. (B)In a level crossing, natural drain water goes through the irrigation canal.
  3. (C)In an aqueduct, natural drain water goes over the irrigation canal, whereas in a super-passage, natural drain water goes under the irrigation canal.
  4. (D)In a canal syphon, natural drain water goes through the irrigation canal.

Answer: (A, B) Official key: A, B

  1. A cross-drainage work is needed wherever a canal meets a natural drain. Which one goes on top depends on their bed and water levels.
  2. Aqueduct: the canal is carried over the drain in a trough on piers, so the drain flows under the canal (a syphon aqueduct is the same with the drain under pressure). Super-passage: the drain is carried over the canal, so the drain flows above it. (A) is true and (C), which swaps them, is false.
  3. Level crossing: used when canal and drain are at about the same level; the drain water enters the canal and leaves it on the other side, with regulators on both. So the drain water goes through the canal: (B) is true.
  4. Canal syphon: the canal dips under the drain as an inverted syphon, so the drain passes over the canal, not through it. (D) is false.
  5. Answer: (A, B).

Trap: reading “syphon” as a mixing structure and picking (D). In both syphon types the two flows never mix; only the level crossing (and an inlet-outlet) lets the drain water join the canal.

Where this shows up in industry

Large canal projects such as the Indira Gandhi and Sardar Sarovar canals cross hundreds of drains, and the choice between aqueduct, super-passage, syphon and level crossing is made from the canal and drain bed levels and the drain's design flood.

GATE 2023 · CE2 · Q.20MCQ · 1 markCanals, dams and hydraulic structures

Identify the cross-drainage work: stream carried in a trough over a canal flowing below with a free surface

Identify the cross-drainage work in the figure.

Cross-drainage work: the natural stream flows at its high flood level in a trough carried on piers above the canal; the canal flows underneath with its full supply level below the bottom of the trough, so it runs with a free water surfaceHFLDrainage /natural streamPierFull supply levelCanalCanalCanal bottom level
  1. (A)Super passage
  2. (B)Aqueduct
  3. (C)Siphon aqueduct
  4. (D)Level crossing

Answer: (A) Super passage Official key: A

  1. Two questions classify any cross-drainage work: which water body passes over the other, and does the lower one flow with a free surface or under pressure.
  2. In the figure the drainage (natural stream) flows at its HFL in a trough on piers, and the canal passes underneath.
  3. The canal's full supply level is below the underside of the trough, so the canal keeps a free water surface.
  4. Drainage over canal with free-surface canal flow is a super passage. If the canal flowed full against the trough it would be a canal siphon (not offered). Canal over drainage would be an aqueduct or siphon aqueduct, and a level crossing has the two flows meeting at the same level.
  5. Answer: (A) Super passage

Trap: (B) aqueduct is the mirror image, with the canal carried in a trough over the drainage.

Where this shows up in industry

Irrigation engineers choose between aqueducts, super passages, siphons and level crossings from the relative bed levels and flood discharge of the drain and the canal, because that choice fixes the trough, pier and headloss design.

GATE 2024 · CE1 · Q.57NAT · 2 marksCanals, dams and hydraulic structures

Normal depth in a standard round-bottom triangular lined canal carrying 20 m3/s, Chezy C = 150

A standard round bottom triangular canal section as shown in the figure has a bed slope of 1 in 200. Consider the Chezy’s coefficient as 150 m1/2/s.

The normal depth of flow, y (in meters) for carrying a discharge of 20 m³/s is ____________ (rounded off to 2 decimal places).

Standard round-bottom triangular canal section: the two sides slope at 1 vertical to 1.5 horizontal and are joined by a circular bottom arc whose centre lies at the centre of the water surface; the radius to the bottom and the radii to the two tangent points, each perpendicular to a side, all equal the flow depth yyyy90°90°11.511.5

Answer: Official key: 1.09 to 1.12

  1. Side slope 1.5 H : 1 V, so the side makes rad with the horizontal and .
  2. The bottom arc has radius and subtends ; each side triangle has legs and . So , and .
  3. Chezy: .
  4. , so .
  5. Answer: (key 1.09 to 1.12).

Trap: treating it as a sharp triangle (, ) gives . The rounded bottom adds area and makes exactly ; must also be in radians.

Where this shows up in industry

IS 10430 recommends this round-bottom triangular section for lined canals carrying up to about 55 cumecs, because the curved bed suits concrete or tile lining laid by paver and gives nearly the best hydraulic radius; distributaries of large projects such as Sardar Sarovar use lined sections.

GATE 2024 · CE2 · Q.41MCQ · 2 marksCanals, dams and hydraulic structures

Flow depth of a round-bottom triangular lined canal carrying 25 m3/s at 1 in 1500, n = 0.013

A round-bottom triangular lined canal is to be laid at a slope of 1 in 1500, to carry a discharge of 25 m³/s. The side slopes of the canal cross-section are to be kept at 1.25H : 1V. If Manning’s roughness coefficient is 0.013, the flow depth (in meters) will be in the range of

  1. (A)2.39 to 2.42
  2. (B)1.94 to 1.97
  3. (C)2.24 to 2.27
  4. (D)2.61 to 2.64

Answer: (A) 2.39 to 2.42 Official key: A

  1. Side slope 1.25 H : 1 V: , rad.
  2. Round-bottom triangle with bottom radius equal to the depth : and .
  3. Manning: .
  4. , so , which lies in 2.39 to 2.42.
  5. Answer: (A) 2.39 to 2.42.

Trap: reading 1.25H : 1V as 1.25 vertical to 1 horizontal () gives ; taking instead of gives . Neither matches an option.

Where this shows up in industry

Lined canals are sized this way in Indian irrigation design offices: n = 0.013 to 0.018 for concrete lining as given in IS 10430, a side slope near 1.25 H to 1 V where the bank soil allows, and the round bottom chosen because it carries the most water for the least lining area.

GATE 2025 · CE1 · Q.43MSQ · 2 marksCanals, dams and hydraulic structures

Lacey's regime equations for scour at hydraulic structures in alluvium: what D, P and d mean

Lacey's regime equations, followed in India for making scour calculations while designing hydraulic structures across alluvial channels, are given below. Regarding these equations, which of the following statements is/are true:

where, is discharge and is silt factor.

  1. (A) is the depth of scour below the existing riverbed
  2. (B) is the Lacey's waterway width
  3. (C) is the average grain size diameter of the bed material in centimetres
  4. (D) is the depth of scour below the design flood level

Answer: (B) and (D) Official key: B;D

  1. is Lacey's regime depth, the normal depth of scour. Like any flow depth it is measured from the water surface at the design (high) flood level down to the scoured bed: (D) is true and (A) is false.
  2. is Lacey's regime wetted perimeter. For a wide alluvial river the wetted perimeter and the surface width are almost equal, so it is used as the Lacey waterway that a weir or bridge should provide: (B) is true.
  3. In the grain size is in millimetres: medium sand of 0.3 mm gives , the familiar value near 1. In centimetres it would give an unrealistic 0.30, so (C) is false.
  4. Answer: (B) and (D). Example: needs m and scours to about m below the flood level.

Trap: (A) treats as scour below the bed. The cut-off and pile depths are fixed by subtracting (times a safety multiple) from the flood level, so measuring it from the bed would put them metres too deep or too shallow.

Where this shows up in industry

Indian barrage guidelines (IS 6966) and bridge codes (IRC:5 and IRC:78) use these Lacey relations to fix the waterway of barrages and bridges on alluvial rivers and to set the levels of cut-offs, sheet piles and well foundations below the expected scour.

GATE 2025 · CE2 · Q.25MSQ · 1 markCanals, dams and hydraulic structures

Upstream and downstream cut-offs below weir and barrage aprons on alluvial rivers: why they are provided

Pick one or more CORRECT statement(s) from the choices given below, in the context of upstream and downstream cut-offs provided below the concrete apron of weirs / barrages constructed across alluvial rivers.

  1. (A)Cut-offs are provided to increase the rate of flow over the weir / barrage.
  2. (B)Cut-offs are provided to increase the seepage length and prevent failure due to piping.
  3. (C)The bottom level of cut-offs mainly depends on the scour depth.
  4. (D)Cut-offs are provided to ensure occurrence of hydraulic jump within the stilling basin.

Answer: (B) and (C) Official key: B;C

  1. Water seeps under the floor from the high upstream pool to the low tail water. If the exit gradient at the downstream end is too high, sand grains are washed out and a pipe works back under the floor (piping). Vertical cut-offs (sheet piles or concrete walls) force the water to travel down and up, lengthening the creep path (Bligh, Lane) and, in Khosla's theory, cutting the exit gradient: (B) is true.
  2. During floods the alluvial bed scours on both sides of the floor. A cut-off must go below the expected scour, taken as a multiple of Lacey's scour depth below the flood level, or the floor is undermined: (C) is true.
  3. Cut-offs are buried under the floor and have no effect on the discharge over the crest: (A) is false. The jump position is set by the floor level, tail water and the stilling basin shape: (D) is false.
  4. Answer: (B) and (C).

Trap: (D) mixes up the downstream cut-off with the end sill and baffle blocks of the stilling basin, which do help hold the jump; the cut-off below them is a seepage and scour element.

Where this shows up in industry

Barrages on the Ganga and Kosi are designed to IS 6966 using Khosla's method, developed from piping failures of weirs on Punjab rivers; the downstream cut-off depth is checked both for a safe exit gradient and for the scour expected in the design flood.

GATE 2026 · CE1 · Q.54NAT · 2 marksCanals, dams and hydraulic structures

Maximum bed slope of a wide unlined channel, 1 m deep, for a permissible tractive stress of 10 N/m2

A wide unlined channel carries sediment-free water. The depth of water is 1 m. The specific weight of water is 10 kN/m3. To prevent scouring, the maximum permissible tractive stress on bed is 10 N/m2. The maximum slope of the channel bed to prevent scouring is 1 in n. The value of n is ______ (in integer).

Answer: Official key: 1000 to 1000

  1. The average shear stress on the bed of a channel in uniform flow is . For a wide channel the hydraulic radius equals the depth, .
  2. Scour is avoided while , so .
  3. Keep the units consistent: . Then .
  4. Answer: (key range 1000 to 1000).

Trap: leaving as 10 (kN/m) against in N/m gives , that is , a vertical bed. Convert both to newtons before dividing.

Where this shows up in industry

Earthen distributaries and field channels in alluvium are checked by the tractive-force method: the bed and side slopes are kept flat enough that the boundary shear stays below what the soil can resist, otherwise the canal scours, and steeper reaches get falls or lining.

From GATE prep to a water resources and flood engineering career

Talk to a counsellor.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.