Part 2 of 2 of the Transportation Engineering hub: 28 more official GATE CE questions on pavement design and traffic engineering and planning, each solved step by step and checked against the official answer key. Part 1 covers highway geometric design, railway and airport engineering and highway materials and bituminous mixes.
Questions from the ten official GATE CE papers, sessions CE1 and CE2 of GATE 2022 (IIT Kharagpur), 2023 (IIT Kanpur), 2024 (IISc Bengaluru), 2025 (IIT Roorkee) and 2026 (IIT Guwahati); solutions by Skill-Lync. · Updated 17 Nov 2026 · 28 of 64 questions on this page
Dual-wheel assembly: ratio of ESWL at depth d/2 to ESWL at depth 2s (45 degree dispersion)
For the dual-wheel carrying assembly shown in the figure, P is the load on each wheel, is the radius of the contact area of the wheel, is the spacing between the wheels, and is the clear distance between the wheels. Assuming that the ground is an elastic, homogeneous, and isotropic half space, the ratio of Equivalent Single Wheel Load (ESWL) at depth to the ESWL at depth is ___________. (round off to one decimal place)
(Consider the influence angle to be 45° for the linear dispersion of stress with depth)
Answer: 0.5 Official key: 0.5 to 0.5
- With 45° dispersion, the stress zone under each tyre widens by on each side as depth grows. The inner edges are apart, so the two zones first touch when , at .
- Down to each tyre acts alone: ESWL .
- By the two zones overlap almost completely and the pair acts as one load: ESWL (Boyd and Foster). Between the two depths ESWL is interpolated on a log-log plot; halfway on that plot it is .
- Ratio 0.5.
Trap: inverting the ratio (ESWL at over ESWL at ) gives 2.0. Read the order in the question: the shallow depth comes first.
IRC:37 designs flexible pavements for a standard 80 kN single axle with dual wheels; the ESWL idea explains why thin upper layers feel each tyre separately while the subgrade, deeper down, feels the pair as one load.
Design traffic in msa from an axle load survey: 800 CVPD, 12 t rear axle, 4% growth, 15-year life
The following data is obtained from an axle load survey at a site:
Average rear axle load = 12000 kg
Number of commercial vehicles = 800 per day
The pavement at this site would be reconstructed over a period of 5 years from the date of survey. The design life of the reconstructed pavement is 15 years. Use the standard axle load as 8160 kg and the annual average vehicle growth rate as 4.0%. Assume that Equivalent Wheel Load Factor (EWLF) and Vehicle Damage Factor (VDF) are equal.
The cumulative standard axle (in msa) for the pavement design is ______ (rounded off to 2 decimal places).
Answer: Marks to all (our working: 33.27 msa) Official key: MTA
- Traffic when the new pavement opens, 5 years after the survey: .
- Fourth-power law: .
- Growth factor over 15 years: .
- , taking a lane distribution factor of 1. A year-by-year sum gives the same.
- Our answer is 33.27 msa, but the official key gives marks to all. IISc did not publish why; the data leave room for other readings: no lane distribution factor or carriageway type is given, and growth during the 5 years before opening can be read either way (ignoring it gives 27.35 msa).
Trap: using the axle load ratio without the fourth power (VDF 1.47) or forgetting the 365 days. In IRC design the growth up to the opening year is always included.
IRC:37-2018 designs flexible pavements for the cumulative msa computed this way, with a VDF from an axle load survey and a lane distribution factor (for example 0.5 of two-way commercial traffic on a two-lane road); it recommends a 20-year design period for national and state highways.
Critical stress combination in a jointed plain concrete slab at summer midnight
Various stresses in jointed plain concrete pavement with slab size of 3.5 m × 4.5 m are denoted as follows:
Wheel load stress at interior =
Wheel load stress at edge =
Wheel load stress at corner =
Warping stress at interior =
Warping stress at edge =
Warping stress at corner =
Frictional stress between slab and supporting layer =
The critical stress combination in the concrete slab during a summer midnight is
- (A)
- (B)
- (C)
- (D)
Answer: (A) Official key: A
- At night the top of the slab is cooler than the bottom, so the slab curls upward: corners and edges lift off the base and the top fibre goes into tension.
- A wheel load at a corner bends the unsupported corner like a cantilever, which also puts the top fibre in tension.
- So at night the two add at the corner: wheel load stress at corner plus warping stress at corner.
- Frictional stress comes from the slab sliding on its base as it expands and contracts with the seasonal temperature range; it is significant only near the middle of long slabs, not at a free corner, and is neglected in the corner combination.
- Answer: (A) .
Trap: the edge combinations (B) and (C) are the day-time (bottom-up) cases: summer mid-day wheel plus warping minus friction, winter mid-day plus friction. Adding friction at the corner, (D), is wrong.
IRC:58-2015 checks concrete pavement slabs for two cases, bottom-up cracking from edge loads with day-time curling, and top-down cracking when the slab curls up at night and axles load the transverse joints, the night case behind this question.
IRC 37:2018 flexible pavements for national highways: minimum traffic growth rate and design period
The recommended minimum traffic growth rate and design period considered for structural design of flexible pavements for national highways in India as per IRC 37:2018 is ______ percentage and ______ years, respectively.
- (A)5, 20
- (B)5, 30
- (C)7, 20
- (D)7, 30
Answer: (A) 5, 20 Official key: A
- IRC 37:2018 asks for the traffic growth rate to be estimated from past traffic and economic data, and when it is estimated lower, a minimum of 5 % per year is to be used.
- It sets a design period of at least 20 years for national and state highways (and urban roads); other categories may use 15 years.
- So the pair is 5 % and 20 years, option (A).
- Why it matters: the cumulative growth factor over 20 years is 33.1 at 5 % against 43.3 at 7.5 %, so the growth rate alone changes the design traffic in msa by about 31 %.
Trap: remembering the older IRC 37:2001 default of 7.5 % growth, which makes 7 look familiar; or picking 30 years, which is a typical design period for rigid (concrete) pavements under IRC 58, not flexible pavements under IRC 37.
Every NHAI and state PWD flexible pavement design report computes the cumulative standard axles (msa) with IRC 37:2018, from a classified traffic count, a growth rate of at least 5 %, a vehicle damage factor survey and a 20-year design period.
Match vehicle damage factor, PCU, perception-reaction time and CBR with their uses
Match the following in Column I with Column II.
| Column I | Column II |
|---|---|
| (1) Vehicle Damage Factor | A. Stability of subgrade soil |
| (2) Passenger Car Unit | B. Capacity of a roadway |
| (3) Perception Reaction Time | C. Design rigid pavement |
| (4) California Bearing Ratio | D. Design flexible pavement |
| E. Stopping sight distance |
- (A)(1)-(D); (2)-(B); (3)-(E); (4)-(A)
- (B)(1)-(C); (2)-(B); (3)-(D); (4)-(A)
- (C)(1)-(D); (2)-(E); (3)-(B); (4)-(A)
- (D)(1)-(D); (2)-(B); (3)-(A); (4)-(E)
Answer: (A) (1)-(D); (2)-(B); (3)-(E); (4)-(A) Official key: A
- (1) Vehicle damage factor converts the commercial vehicles counted into equivalent standard axles, the design traffic in msa for a flexible pavement: (D). Rigid pavements under IRC 58 are designed from axle load spectra, not from VDF.
- (2) Passenger car unit converts a mixed stream of trucks, two-wheelers and cars into equivalent cars to compare with the capacity of a roadway: (B).
- (3) Perception-reaction time gives the lag distance in the stopping sight distance: (E).
- (4) California bearing ratio measures the strength, or stability, of the subgrade soil: (A).
- Answer: (A).
Trap: option (B) pairs VDF with rigid pavements, and option (D) swaps CBR and reaction time. CBR also enters flexible pavement design, but D is already taken by VDF, so CBR goes to the subgrade.
A single highway project report uses all four: a classified count converted to PCU for the lane requirement, an axle load survey for the VDF and msa, a 2.5 s reaction time in the sight distance checks, and subgrade CBR tests for the pavement crust.
Rigid pavements: bottom-up cracking at the edge and top-down fatigue cracking, are both statements true?
Consider the following statements with respect to rigid pavements:
Statement-1: Bottom-up cracking (BUC) in rigid pavements is caused at the edge of the slab due to combined effect of single or tandem rear axle load and positive temperature differential.
Statement-2: Top-down fatigue cracking (TDC) in rigid pavements is caused due to repeated cycles of axle loads and negative temperature differential.
The CORRECT option is:
- (A)Both statements are TRUE.
- (B)Statement-1 is TRUE, but Statement-2 is FALSE.
- (C)Statement-1 is FALSE, but Statement-2 is TRUE.
- (D)Both statements are FALSE.
Answer: (A) Both statements are TRUE. Official key: A
- By day the top of the slab is warmer than the bottom (positive differential): the slab curls down at the edges, loses support at its middle and the bottom fibres go into tension. A rear axle at the edge then adds bending tension at the bottom: bottom-up cracking. Statement-1 is true.
- At night the top is cooler (negative differential): the slab curls up, its corners and ends lift off the base, and axles near the transverse joints bend it so that the top fibres crack under repeated loading: top-down cracking. Statement-2 is true.
- Answer (A).
Trap: thinking fatigue only starts at the bottom of a slab, as in flexible pavement theory, and choosing (B). The negative temperature differential makes the top of a concrete slab the tension face.
IRC 58, the Indian code for plain jointed rigid pavements, has the designer check cumulative fatigue damage for both bottom-up cracking (day-time axle loads at the edge) and top-down cracking (night-time axle loads near the joints) before accepting a slab thickness.
Which stresses are considered in rigid pavement design: warping, frictional, maximum or sum of stresses?
Which of the following statements is/are TRUE with respect to the type of stresses to be considered for the design of rigid pavements?
- (A)Warping stress due to temperature differential between the top and bottom of the pavement slab as a result of daily variation in temperature
- (B)Frictional stress due to the overall increase or decrease in temperature of the pavement slab as a result of seasonal variation in temperature
- (C)Critical stress obtained as the maximum of the wheel load stress, the warping stress, and the frictional stress
- (D)Critical stress obtained as the sum of wheel load stresses at edge, interior, and corner of the pavement slab
Answer: (A) and (B) Official key: A;B
- (A) TRUE: the daily top-to-bottom temperature differential curls the slab; its weight resists the curling and causes warping stresses (Westergaard and Bradbury).
- (B) TRUE: a uniform seasonal rise or fall makes the whole slab expand or contract; friction with the sub-base resists that movement and causes frictional stress, which sets the joint spacing.
- (C) FALSE: the design checks critical combinations (for example edge load stress plus warping stress, minus frictional stress in summer), not the largest single stress.
- (D) FALSE: edge, interior and corner are separate load positions, each checked on its own; their stresses are never added together.
- Answer (A) and (B).
Trap: (C) sounds safe, but taking only the largest stress would miss the edge load plus warping combination that usually governs the slab thickness.
Contraction joints at about 4.5 m spacing and dowel bars in Indian concrete highways exist to keep these warping and frictional stresses low, as IRC 58 sets out, which is why a jointed concrete road shows regular transverse joints.
Order of traffic densities at four points P, Q, R, S on the Greenshields speed-flow diagram
Consider the four points P, Q, R, and S shown in the Greenshields fundamental speed-flow diagram. Denote their corresponding traffic densities by , , , and , respectively. The correct order of these densities is
- (A)
- (B)
- (C)
- (D)
Answer: (A) Official key: A
- Greenshields: speed falls linearly with density, , so . Density depends only on speed, and the slower the stream, the denser it is.
- Read the speeds off the vertical axis: P is at zero speed, Q (the nose) at , R higher on the upper branch, S at .
- So (jam, zero flow), (capacity), smaller still and (free flow, zero flow). With veh/km and R at : .
- Order: (A) .
Trap: ranking by flow (horizontal position) gives Q first, option (C). P and S both have zero flow but sit at opposite ends of the density range.
The Indian Highway Capacity Manual (Indo-HCM, CSIR-CRRI, 2017) fits speed-flow curves of exactly this shape to mixed Indian traffic; operating on the lower branch, below the nose, is what a traffic jam looks like on the graph.
Effective green time of a two-phase signal: cycle 100 s, amber 4 s, red 50 s, lost time 2 s per phase
A two-phase signalized intersection is designed with a cycle time of 100 s. The amber and red times for each phase are 4 s and 50 s, respectively. If the total lost time per phase due to start-up and clearance is 2 s, the effective green time of each phase is ______s. (in integer)
Answer: 48 s Official key: 48 to 48
- For each phase the signal shows green, then amber, then red, and the three add up to the cycle: .
- Actual green: s.
- Effective green is the time the approach discharges at saturation flow: the displayed green plus the amber that drivers use, minus the start-up and clearance lost time: .
- 48 s.
Trap: subtracting the lost time from the displayed green alone gives 44 s, and ignoring it gives 46 s. The 2 s lost time is counted over green plus amber, so the amber has to be added back first.
Capacity of a signalised approach is saturation flow times effective green over cycle; IRC:93, India's guideline for road traffic signals, uses this split of green, amber and lost time when signal timings are worked out.
Cars at 4 per hour and buses at 2 per hour arrive as Poisson processes: probability of at least 2 vehicles in 30 minutes
At a traffic intersection, cars and buses arrive randomly according to independent Poisson processes at an average rate of 4 vehicles per hour and 2 vehicles per hour, respectively. The probability of observing at least 2 vehicles in 30 minutes is ______. (round off to two decimal places)
Answer: 0.80 Official key: 0.78 to 0.82
- The sum of independent Poisson streams is a Poisson stream with the summed rate: vehicles per hour.
- Mean count in 30 minutes: .
- .
- 0.80.
Trap: using only the cars () gives 0.59; keeping the hourly rate () gives 0.98; reading at least 2 as more than 2 gives 0.58. All fall outside the key.
Poisson arrivals underpin gap-acceptance checks at unsignalised junctions and queue estimates at toll plazas; the model holds for light, random traffic, not for vehicles released in platoons by an upstream signal.
Peak hour factor for 10-minute counts 10, 11, 12, 15, 13, 11 in the peak hour
The vehicle count obtained in every 10 minute interval of a traffic volume survey done in peak one hour is given below.
| Time interval (in minutes) | Vehicle count |
|---|---|
| 0 – 10 | 10 |
| 10 – 20 | 11 |
| 20 – 30 | 12 |
| 30 – 40 | 15 |
| 40 – 50 | 13 |
| 50 – 60 | 11 |
The peak hour factor (PHF) for 10 minute sub-interval is __________. (round off to one decimal place)
Answer: 0.8 Official key: 0.8 to 0.8
- PHF compares the hourly volume with the rate of the busiest sub-interval: , with sub-intervals in an hour.
- Hourly volume: vehicles.
- Peak 10-minute count , and an hour has such intervals.
- 0.8.
Trap: using the familiar 15-minute form, , gives 1.2, which is above 1 and impossible for a PHF. The multiplier is the number of sub-intervals in the hour, 6 here.
Junction and lane capacity checks use the flow rate of the busiest sub-interval, the hourly volume divided by the PHF, so a PHF of 0.8 means the design must carry surges 25 percent above the average hourly rate.
Greenshields model: which flow-density and flow-speed relations are correct?
For a traffic stream, is the space mean speed, is the density, is the flow, is the free flow speed, and is the jam density. Assume that the speed decreases linearly with density.
Which of the following relation(s) is/are correct?
- (A)
- (B)
- (C)
- (D)
Answer: (B, D) Official key: B, D
- Linear speed-density (Greenshields): , and always .
- Flow in terms of density: , which is (B).
- Flow in terms of speed: invert to , so , which is (D).
- (A) and (C) swap the roles of and and fail a numerical check (, , : true ). Both parabolas peak at veh/h.
- Answer: (B) and (D).
Trap: mixing the two forms, for example writing as the linear term of the flow-density curve (A). Check units: is a flow, is not.
Capacity of a lane, the peak of these parabolas, is v_f k_j / 4; Indian capacity studies such as Indo-HCM (CSIR-CRRI, 2017) estimate free speed and jam density for each road class from field data.
Single-lane highway, density 40 veh/km, time-mean speed 40 and space-mean speed 30 kmph: average headway
A single-lane highway has a traffic density of 40 vehicles/km. If the time-mean speed and space-mean speed are 40 kmph and 30 kmph, respectively, the average headway (in seconds) between the vehicles is
- (A)3.00
- (B)2.25
- (C)
- (D)
Answer: (A) 3.00 Official key: A
- The fundamental relation uses the space-mean speed, the speed averaged over the vehicles on a stretch of road at one instant.
- veh/h.
- Average time headway is the inverse of flow: 3.00 s, option (A).
Trap: the time-mean speed gives veh/h and s, option (B); leaving in hours gives option (C), h, and (D) combines both slips.
A headway of about 2 seconds per vehicle is what sets the commonly quoted capacity of roughly 1,800 to 2,000 cars per hour per lane on an uninterrupted urban road.
Shockwave speed between a stream of 1200 veh/h at 60 kmph and a stream of 1800 veh/h at 30 kmph
Assuming that traffic on a highway obeys the Greenshields model, the speed of a shockwave between two traffic streams (P) and (Q) as shown in the schematic is _______ kmph. (in integer)
Answer: 15 kmph Official key: 15 to 15
- Density of each stream from : veh/km and veh/km.
- Shockwave speed is the slope of the chord joining the two states on the flow-density curve: .
- 15 kmph, positive, so the boundary moves downstream, in the direction of traffic.
- Check: both states lie on one Greenshields line with km/h and veh/km.
Trap: dividing the flow difference by the speed difference gives -20 kmph, and the plain speed difference gives 30. The shockwave formula divides by densities, not speeds.
Shockwave analysis tells traffic police and toll operators how fast a queue tail grows behind a lane closure, crash or toll plaza, and therefore where advance warning signs have to be placed.
Webster optimum cycle for a two-phase four-arm intersection with given lane volumes and 9 s total lost time
The lane configuration with lane volumes in vehicles per hour of a four-arm signalized intersection is shown in the figure. There are only two phases: the first phase is for the East-West and the West-East through movements, and the second phase is for the North-South and the South-North through movements. There are no turning movements. Assume that the saturation flow is 1800 vehicles per hour per lane for each lane and the total lost time for the first and the second phases together is 9 seconds.
The optimum cycle length (in seconds), as per the Webster's method, is ____________. (round off to the nearest integer)
Answer: 37 s Official key: 37 to 37
- Webster: , where is the sum of the critical flow ratios of the phases.
- Phase 1 (east-west): the busiest lane carries 504 veh/h, so .
- Phase 2 (north-south): busiest lane 396 veh/h, so .
- and s: 37 s.
Trap: dropping the 1.5 on gives 28 s; averaging all lanes of a phase instead of taking its critical lane gives 35.2 s. The critical lane sets the green each phase needs.
Fixed-time signal plans at Indian junctions are still commonly worked out with Webster's formula from classified turning counts, then fine-tuned on site; IRC:93 is the Indian guideline for road traffic signals.
Ratio of capacities of two roads from their linear speed-density lines (Greenshields model)
A plot of speed-density relationship (linear) of two roads (Road A and Road B) is shown in the figure.
If the capacity of Road A is and the capacity of Road B is , what is ?
- (A)
- (B)
- (C)
- (D)
Answer: (C) Official key: C
- A linear speed-density line is the Greenshields model: , with free speed at zero density and jam density at zero speed.
- Flow . Setting gives , so speed is there.
- Capacity , a quarter of the rectangle under each line.
- For the two roads , which is (C) .
- Check with numbers ( = 80, = 100, = 60, = 160): a search over density gives capacities 2000 and 2400 veh/h, ratio 0.8333, equal to .
Trap: picking (A) or (B) because one road has the higher free speed and the other the higher jam density. Capacity needs both: neither ratio alone decides it, and where the lines cross does not matter.
CSIR-CRRI's Indo-HCM (2017) set the capacity of Indian highway sections from speed-flow-density data fitted for mixed traffic, the same idea as this two-parameter line: free speed and jam density together fix the maximum flow.
Time-space diagram of traffic stopped and released: compare speed, volume and density in regions P, Q and R
The figure presents the time-space diagram for when the traffic on a highway is suddenly stopped for a certain time and then released. Which of the following statements are true?
- (A)Speed is higher in Region R than in Region P
- (B)Volume is lower in Region Q than in Region P
- (C)Volume is higher in Region R than in Region P
- (D)Density is higher in Region Q than in Region R
Answer: (B), (C) and (D) Official key: B;C;D
- Read the regions: P is the arriving stream, Q is the queue (horizontal paths, so speed 0), R is the stream discharging after release. Slope of a path = speed; paths closer together in time = higher flow; closer together in distance = higher density.
- Greenshields with = 80 km/h, = 150 veh/km and arrivals of 1500 veh/h: P has veh/km at 68.3 km/h; Q has , flow 0; R discharges at capacity, at 40 km/h, 3000 veh/h.
- (A) R is slower than P (40 vs 68.3 km/h): its paths are flatter. False.
- (B) Flow in Q is zero: true. (C) R flows at capacity, more than the arrivals: true. (D) Jam density in Q is double that in R: true.
- Answer: (B), (C) and (D).
Trap: assuming released traffic is faster because it is accelerating away. The discharge runs at capacity, which on the speed-density line sits at half the free speed; the light arriving traffic is faster. The queue tail moves back at -11.7 km/h and the release wave at -40 km/h.
Toll plazas, railway level crossings and signals on Indian highways create this pattern every cycle: a queue that grows backwards while traffic is held, then discharge at saturation flow, which is why signal timing and toll-lane counts are worked out from queue discharge rates.
Maximum flow on a lane for free speed 60 km/h and 8 m spacing at jam, linear speed-density
The free mean speed is 60 km/hr on a given road. The average space headway at jam density on this road is 8 m. For a linear speed-density relationship, the maximum flow (in veh/hr/lane) expected on the road is
- (A)1875
- (B)938
- (C)2075
- (D)1038
Answer: (A) 1875 Official key: A
- Jam density from the spacing at jam: .
- Linear (Greenshields) model: , so flow .
- gives and , hence .
- . A grid search over gives the same peak.
- Answer: (A) 1875.
Trap: (B) 938 is half the answer, what you get by taking both the optimum density and the optimum speed as a quarter of the free values, or by dividing by 8. At capacity the density is half of jam density and the speed is half of free speed, and the flow is their product.
The Indian Highway Capacity Manual (Indo-HCM, 2017) by CSIR-CRRI builds lane capacities for mixed Indian traffic from field speed-flow-density data, fitting models of this kind to find the density at which flow peaks.
Mean speed of six vehicles from their trajectories in a time-space diagram (Edie's definition)
The figure presents the trajectories of six vehicles within a time-space domain. The number in the parentheses represents unique identification of each vehicle.
(Figure NOT to scale)
The mean speed (in km/hr) of the vehicles in the entire time-space domain is ______ (rounded off to the nearest integer).
Answer: 57 km/h Official key: 52 to 58
- Read each trajectory inside the domain (0 to 30 s, 0 to 500 m): distances travelled are 100, 250, 400, 400, 350 and 150 m; times spent are 10, 15, 30, 25, 15 and 10 s.
- Edie's mean speed for a time-space region is total distance travelled divided by total time spent: .
- In km/h: , so 57 km/h.
- The key, 52 to 58, is wide on purpose: the harmonic mean of the six individual speeds (the space-mean speed of the vehicles) is 53.07 km/h, which is also accepted.
Trap: answering in m/s (15.7) or reading the end points of trajectories (1) and (2) at 30 s instead of where they leave the domain at the 500 m boundary.
Traffic studies increasingly extract vehicle trajectories from drone or CCTV video, and Edie's definitions turn those trajectories directly into flow, density and space-mean speed for a road section, which is how such datasets are summarised.
Upper speed limit for a traffic sign from a spot speed study of 500 vehicles (85th percentile)
The consolidated data of a spot speed study for a certain stretch of a highway is given in the table.
| Speed range (kmph) | Number of observations |
|---|---|
| 0 - 10 | 7 |
| 10 - 20 | 31 |
| 20 - 30 | 76 |
| 30 - 40 | 129 |
| 40 - 50 | 104 |
| 50 - 60 | 78 |
| 60 - 70 | 29 |
| 70 - 80 | 24 |
| 80 - 90 | 13 |
| 90 - 100 | 9 |
The “upper speed limit” (in kmph) for the traffic sign is
- (A)50
- (B)55
- (C)65
- (D)70
Answer: (B) 55 Official key: B
- The upper speed limit for regulation is the 85th percentile speed: the speed that 85 % of drivers do not exceed.
- Total observations ; 85 % of them is 425.
- Cumulative counts: 7, 38, 114, 243, 347, 425, 454, 478, 491, 500. The 425th vehicle closes the 50-60 class.
- Plotting each class at its mid-speed (5, 15, ..., 55 km/h), as the cumulative-frequency curve in most traffic-studies texts does, puts 85 % at 55 km/h: (B) 55.
- Plotted at class upper limits the same point is 60 km/h, which is not offered, so the key follows the mid-speed convention.
Trap: the 98th percentile (84 km/h on the same curve) is the design speed for geometric design, not the speed-limit sign; the 15th percentile (20 km/h) is the lower limit used for minimum-speed signs on expressways.
Speed limits on Indian roads are guided by spot speed studies, with the 85th percentile speed, rounded to a multiple of 5 km/h, a common basis for the regulatory sign under IRC:67 and state speed-limit notifications.
All of a peak hour's vehicles arrive within 10 minutes: the 15-minute peak hour factor
All the vehicles that come during a particular peak hour come during a 10-minute period within this hour. The 15-minute peak hour factor for this peak hour is
- (A)0.25
- (B)0.167
- (C)0.75
- (D)1.0
Answer: (A) 0.25 Official key: A
- The 15-minute peak hour factor compares the hourly volume with four times the busiest 15-minute count: .
- Let the hour's volume be . Every vehicle arrives inside one 10-minute window, and any 15-minute window that covers those 10 minutes holds all vehicles, so .
- 0.25, option (A). This is the smallest value a 15-minute PHF can take; a perfectly uniform hour gives the largest, 1.0.
Trap: dividing the hour into 10-minute intervals and writing , option (B). The question asks for the 15-minute PHF, so the divisor is always 4 times the peak 15-minute count.
Junction and corridor counts for signal design in Indian cities are recorded in 15-minute bins for this reason: a short surge, such as the minutes after a factory shift or school closes, sets the design flow even when the hourly total looks modest.
Speed constant at 90 km/h up to 10 veh/km, then linear to jam density 100: maximum flow
The speed-density relation on a one-way, single lane road is shown in the figure, where speed is in km/hour and density is in vehicles/km. The maximum flow (in vehicles/hour) on this road is
- (A)2500
- (B)900
- (C)2250
- (D)2000
Answer: (A) 2500 Official key: A
- Flow is speed times density: .
- For : , so , rising to veh/h at the break point.
- For the line passes through (10, 90) and (100, 0): .
- Then , a parabola with its peak at , that is veh/km, inside this branch.
- 2500 veh/h, option (A), at a speed of 50 km/h.
Trap: reading the flow at the break point, (option B), or treating the road as one straight Greenshields line from 90 km/h to jam density 100, which gives (option C). The second branch has an intercept of 100 km/h, not 90.
Traffic engineers fit speed-density models like this to loop-detector or video data from expressways; the peak of the resulting flow curve is the lane capacity that decides when a corridor needs another lane or ramp metering.
30 % trucks at 30-60 km/h and 70 % cars at 40-80 km/h, uniform: share above a 50 km/h limit
A one-way, single lane road has traffic that consists of 30% trucks and 70% cars. The speed of trucks (in km/h) is a uniform random variable on the interval (30, 60), and the speed of cars (in km/h) is a uniform random variable on the interval (40, 80). The speed limit on the road is 50 km/h. The percentage of vehicles that exceed the speed limit is ______ (rounded off to 1 decimal place).
Note: is a uniform random variable on the interval , if its probability density function is given by for , and 0 otherwise.
Answer: 62.5 Official key: 61.0 to 63.0
- For a uniform speed on the share above a limit is .
- Trucks: .
- Cars: .
- Total probability over the vehicle mix: .
- Percentage exceeding the limit = 62.5 (key 61.0 to 63.0).
Trap: averaging the two shares without the 30/70 weights gives , and computing the share below the limit gives . Weight each vehicle class by its share of the traffic, and count the part of each interval above 50 km/h.
Spot speed studies with radar guns or video give exactly this class-wise speed distribution, and the share of vehicles above the posted limit is what police and road agencies use to decide on enforcement cameras or traffic calming on a stretch.
Linear speed-density, free flow 100 km/h, capacity 4000 veh/h: speeds at a volume of 2000 veh/h
The free flow speed of a highway is 100 km/h and its capacity is 4000 vehicle/h. Assume speed density relation is linear.
For a traffic volume of 2000 vehicle/h, choose all the possible speeds (in km/h) from the options given below (round off to two decimal places).
- (A)85.36
- (B)65.20
- (C)14.64
- (D)7.22
Answer: (A) and (C) Official key: A;C
- Linear (Greenshields) model: , so the capacity is .
- gives the jam density veh/km.
- Flow in terms of speed: , so .
- This is , so .
- km/h (uncongested, veh/km) or km/h (congested, veh/km): answer (A) and (C).
Trap: keeping only the higher root. Below capacity every flow occurs twice on the flow-speed curve, once in free flow and once in a queue, and the question asks for all possible speeds.
This is why a traffic count alone cannot tell a free-flowing road from a jammed one: the same 2000 veh/h is measured in both states, so Indian traffic studies record speed or density, such as travel time runs or video, alongside volume.
Space mean speed of three vehicles with travel times 4, 5 and 8 minutes on a 2 km stretch
The travel times of three vehicles on a 2 km stretch of road are 4, 5, and 8 minutes. Assuming the speed of each vehicle to be constant in this stretch, the Space Mean Speed (in km/h) of the vehicles is ______ (rounded off to two decimal places).
Answer: 21.18 km/h Official key: 20.00 to 21.90
- Space mean speed is the total distance covered divided by the total time taken, which equals the harmonic mean of the individual speeds.
- Speeds: , and km/h.
- km/h; check: .
- Answer 21.18 km/h.
Trap: the arithmetic mean of the speeds, km/h, is the time mean speed (what a spot-speed gun at one point measures), and it is outside the key.
Travel-time surveys with the moving-observer method or number-plate matching give space mean speed directly, and it is this speed, not the spot speed, that enters flow = density x speed in the capacity studies behind India's Indo-HCM manual.
Densities in a narrowed road section and the sections after it, from unconstrained and constrained flow-density curves
A road is divided into four sections having varying widths as shown in the figure. Section-2 (S2) represents a capacity constrained condition with respect to the traffic flow passing through Section-1 (S1). Section-3 (S3) and Section-4 (S4) do not face any such capacity constraint with respect to the flow. A flow-density relationship for unconstrained and constrained flow conditions is shown in the figure.
If Section-1 observes density D2, the option representing the correct state of density in Sections 2, 3 and 4 is:
- (A)S2 – D4 ; S3 – D3 ; S4 – D2
- (B)S2 – D3 ; S3 – D2 ; S4 – D1
- (C)S2 – D3 ; S3 – D4 ; S4 – D2
- (D)S2 – D4 ; S3 – D3 ; S4 – D1
Answer: (D) S2 – D4 ; S3 – D3 ; S4 – D1 Official key: D
- The demand arriving from S1 is the flow at point 2, which is above the dashed line, the capacity of the narrowed section (the peak of the constrained curve).
- S2 cannot pass that demand: it runs congested, carrying its capacity flow at the high density on the congested side, D4.
- Downstream, no more than the bottleneck's capacity can arrive. S3 discharges that flow at the peak of the constrained curve, D3.
- S4 is unconstrained and carries the same flow in free flow, on the rising branch of the unconstrained curve at that flow: point 1, D1.
- Answer (D).
Trap: assuming the upstream state carries through and putting S4 back at D2, option (A). The bottleneck meters the flow, so every section after it sees at most the capacity flow, and a wide road at that flow is in free flow.
Lane drops at old narrow bridges, toll plazas and work zones behave exactly like S2: a queue builds upstream while traffic just past the bottleneck runs freely, which is why widening only the approach rarely cures the jam.
Vehicles in queue at 10:00 am after a truck blocks the middle lane of a 6-lane dual carriageway from 08:00 to 08:30
Traffic is moving on a 6-lane dual carriageway road. Traffic volume per direction during peak hour (08:00 am to 09:00 am) is 6000 veh/h. It is assumed that the traffic is distributed uniformly across the lanes in each direction. Just at 08:00 am, a truck goes out of order on the middle lane of one side, thus disrupting the traffic on that lane in one direction. The lane capacity under normal conditions is 2000 veh/h/ln and under queue formation it is 1600 veh/h/ln. The traffic resumes at 08:30 am on removing the truck from the middle lane. Hourly traffic volume after 09:00 am reduces to 5000 veh/h/dir.
The number of vehicles in the queue at 10:00 am is ______ (in integer).
Answer: 2200 vehicles Official key: 2200 to 2200
- Once a queue exists, each lane discharges at the queue capacity, 1600 veh/h/ln.
- 08:00-08:30, two lanes open: discharge veh/h against 6000 arriving, queue .
- 08:30-09:00, three lanes but a queue is present: discharge , queue .
- 09:00-10:00: arrivals 5000, discharge still 4800, queue .
- Answer 2200 vehicles; the queue is still growing at 10:00.
Trap: switching back to 2000 veh/h/ln once the truck is gone ignores the queue-discharge capacity and gives 400; letting the two open lanes run at 2000 during the blockage gives 1800. Both are outside the key.
This capacity drop when a queue forms is why expressway operators keep cranes and route-patrol vehicles on call: a lane blocked for half an hour in the peak can leave a queue that keeps growing for hours after the lane reopens.
Maximum flow from Greenberg's speed-density model with v0 = 45 km/h and jam density 200 veh/km
For a given traffic stream, the speed-density relationship is given as:
where is the mean speed (in km/h), and is the density (in veh/km).
Considering as 45 km/h, and as 200 veh/km, the maximum flow (in veh/h) for the given stream is ______ (rounded off to the nearest integer).
Answer: 3311 veh/h Official key: 3300 to 3350
- Flow (Greenberg's model).
- Maximum: , so veh/km, and the speed there is km/h.
- veh/h; a numerical search over gives the same, 3310.9.
- Answer 3311 veh/h.
Trap: using Greenshields' result with gives 2250 veh/h, outside the key; in Greenberg's model is the speed at capacity, not the free-flow speed (which is unbounded as ).
Greenberg's logarithmic model fits dense, congested urban streams better than Greenshields' straight line, so traffic studies on Indian city arterials often test both against video counts before estimating capacity.