Every AC-circuit question from the last five GATE Electrical papers that is not on another page: an AC Thevenin equivalent with a controlled source, true power factor with a harmonic, half-cycle average power, neutral shift in an unbalanced star, mixed delta and star loads, a capacitive load behind line inductance, two wattmeters on an unbalanced load, cascaded and paralleled two-ports, reflected impedance of coupled coils and maximum power transfer. Each answer matches the official key and was recomputed by a full circuit solve.
Questions from official GATE EE papers (IIT Kharagpur 2022, IIT Kanpur 2023, IISc Bengaluru 2024, IIT Guwahati 2026); solutions by Skill-Lync. · Updated 16 Nov 2026 · 11 questions
Dependent source 4i_x and i = sin 1000t: what is the Thevenin voltage across a-b at t = 5 ms?
Answer: Official key: -12.1 to -11.9
- Work in phasors with the sine as reference: . Call the left branch and the middle branch ; let be the node right of the controlled source.
- With a-b open, all of flows down : , so .
- The controlled source sets , so .
- KCL at : the source current splits into and the controlled-source branch (which carries on to node a): , so .
- . It is purely real, so .
- At : rad and .
Trap: taking in degrees gives V. The argument is in radians. A full nodal solve of the two unknown node voltages gives the same .
Every AC small-signal model of an amplifier or a grid-tied inverter's control loop is a network with controlled sources like this one, and circuit simulators (SPICE AC analysis) do exactly this complex nodal solve to report Thevenin and Norton equivalents at a port.
A 325 V sine source drives 12 A fundamental plus 9 A third harmonic: what is the load power factor?
The load power factor, correct up to two decimal places, is:
- (A)1.00
- (B)0.80
- (C)0.65
- (D)0.57
Answer: (B) 0.80 Official key: B
- Only the current component at the voltage's frequency carries average power: (the 150 Hz term averages to zero against a 50 Hz voltage).
- , .
- . Answer (B).
Trap: the fundamental current is in phase with the voltage, so the displacement factor is 1 and option (A) looks right. The third harmonic adds rms current without adding power, and the true power factor is displacement factor × distortion factor . Averaging over one period numerically gives 0.8000.
Rectifier loads (SMPS, LED drivers, VFD front ends) draw exactly this kind of current. Power analysers report true PF and displacement PF separately, and harmonic standards such as IEC 61000-3-2 and IEEE 519 exist because harmonic current heats cables and transformers without delivering power.
v = Vm sin ωt and i = Im sin(ωt − θ): what is the average power over a half cycle?
What is the average power dissipated over a half cycle corresponding to ?
- (A)0
- (B)
- (C)
- (D)
Answer: (C) Official key: C
- .
- The second term oscillates at , so one half cycle of the source () is exactly one full period of it, and it averages to zero.
- Average over the half cycle , the same as over a full cycle. Answer (C).
Trap: picking (A) because and each average to zero over a cycle. Power is their product, and the product does not average to zero. Picking (B) forgets the factor from . We averaged numerically over for five random sets of : only (C) matches every time.
Digital power meters and power analysers compute real power by averaging sampled over a whole number of half cycles, which is why they lock their averaging window to zero crossings: any whole number of half cycles gives the true average power.
Unbalanced star load with Z_A = 10 Ω and Z_B = 20∠60° Ω: which Z_C makes the voltage between n and n' zero?
- (A)
- (B)
- (C)
- (D)
Answer: (C) Official key: C
- Phase voltages: , , V (line voltage ).
- Millman: . It is zero when the numerator is zero.
- and , so must be .
- . Answer (C).
Trap: assuming the load must be balanced, or copying 's angle (D, which leaves a 50 V neutral shift). Zero shift needs the three phase currents to add to zero, not equal impedances. A nodal solve at for each option confirms only (C) gives 0 V.
In LV distribution a lost neutral turns every unbalanced building into this circuit: the star point drifts and lightly loaded phases see overvoltage that burns appliances. Utilities balance single-phase loads across phases and use neutral-loss protection for this reason.
Delta of Z1 = 18 + j24 Ω and star of Z2 = 6 + j8 Ω on a 100√3 V supply: what does the line ammeter read?
Answer: Official key: 20 to 20
- Read the figure: the three connect line to line (a delta), the three meet at a floating star point.
- Convert the delta to a star: per phase, the same as .
- Per phase the two star loads are in parallel: , .
- Phase voltage , so the line current is .
Trap: putting the line voltage across the star impedance, or forgetting the delta-to-star factor of 3 (treating as a star gives 13 A). A nodal solve of the full circuit, with the star point as the only unknown node, gives 20.00 A in line R.
Plant feeders carry delta-connected motors alongside star-connected heaters and lighting, and engineers reduce everything to per-phase star equivalents exactly this way to size cables, breakers and the transformer.
Delta R-C load fed through 31.83 mH lines from 415 V: what is the load voltage V_AB?
Answer: Official key: 414 to 416
- Reactances at 50 Hz: , .
- Delta branch ; star equivalent per phase.
- Per phase: , , .
- Load phase voltage , so .
Trap: assuming the line inductance must drop the voltage. With a capacitive load the drop across and the load voltage are out of phase, and here , so the load sees the full supply voltage. A three-node solve of the full circuit with the printed (rounded) L and C gives 415.01 V.
This is why a capacitive load (or a power-factor-correction bank) at the end of an inductive feeder lifts the receiving-end voltage: utilities check this voltage rise before switching capacitor banks, and too much compensation on a light load gives overvoltage.
Two wattmeters with Z1 = 50∠−90° Ω and Z2 = 200∠−30° Ω on 400 V: what is |W1 − W2|?
Answer: Official key: 692 to 693
- Read the figure: is across lines R and B, across R and Y; nothing but 's pressure coil sits between B and Y. Take , , (R-Y-B).
- A, A, so A and .
- .
- , which is all of the power in (); is a pure capacitor.
Trap: using the balanced-load rule . This load is unbalanced (two impedances only), so compute each meter from its own voltage and current. Check: W equals the total load power.
Three-wire three-phase energy meters are two-element meters built on this two-wattmeter (Blondel) principle, and with unbalanced or very low-power-factor loads one element can legitimately read zero or negative, which commissioning engineers must not mistake for a wiring fault.
Network P (given Z matrix) cascaded with network Q (given Y matrix): what is β, the B parameter of the combined ABCD matrix?
Answer: Official key: -19.90 to -19.70
- Cascaded networks multiply their ABCD matrices in order: , so .
- From : , .
- From : , .
Trap: multiplying in the wrong order ( gives ) or swapping and (P is not reciprocal). We also shorted port 2 of R, pushed 1 A out of it and walked back through Q's Y equations and P's Z equations: the source needs V, which is by definition.
Transmission lines, filters and RF chains are modelled as cascades of ABCD (transmission) matrices: a long power line is a chain of nominal-π sections, and multiplying their matrices gives the sending-end voltage and current for a given load.
Two-port with y11 = 5 S, y22 = 1 S, y12 = y21 = −2.5 S, a 3 Ω bridge and a 6 Ω load: how much power reaches R_L?
The power delivered to the load resistor in Watt is __________ (Round off to 2 decimal places).
Answer: Official key: 237 to 239
- The 3 Ω resistor sits between terminals 1 and 2, in parallel with the network. Two-ports in parallel add their Y matrices; the 3 Ω adds to and and to and : S, S.
- Port 2 into the load: .
- .
Trap: forgetting the 3 Ω bridge (306 W). Note: these numbers are not those of a real passive resistive network. Its π-equivalent has a shunt of S at port 2, which is why the load voltage (37.78 V) exceeds the 20 V source. Use the parameters as given, as the official key does.
Y-parameters are what a network analyser measures on transistors and RF blocks, and adding Y matrices is how designers fold feedback elements (like this bridging resistor) into an amplifier model before predicting its gain and output power.
Coupled coils of 125 mH and 1 mH with M = 5 mH and a 50 μF secondary at 5000 rad/s: what is Z_th at P-Q?
Answer: Official key: 5.32 to 5.34
- Reactances at : , , , .
- Secondary loop impedance: .
- Reflected into the primary: . It cancels the primary's , so the 2 Ω + 125 mH branch looks like a plain 2 Ω.
- (looking from P-Q into the network, so is not part of it).
Trap: worrying about the dots. The reflected impedance depends on , so the dot orientation does not change it; a three-mesh solve with and with gives the same .
Reflected impedance is how wireless chargers and resonant converters work: the receiver coil is tuned with a capacitor so that what the transmitter sees is mostly resistive, and the same calculation tells a protection engineer how a CT's secondary burden appears in the primary circuit.
10 V source with a 5 Ω, 10 Ω and 4 Ω two-port: which R_L receives maximum power?
(Round off to two decimal places)
Answer: Official key: 2.81 to 2.91
- Maximum power goes to a resistive load when seen from port 2.
- Kill the ideal 10 V source (short it). The 5 Ω resistor is directly across that source, so it is shorted and drops out.
- From port 2: 4 Ω in parallel with 10 Ω (to the shorted port 1): .
Trap: keeping the 5 Ω in series with the 10 Ω, giving . Anything directly across an ideal voltage source never affects the rest of the circuit. A 1 A test-current solve at port 2 with the source killed reads 2.857 V.
Matching a load to the source resistance matters for antennas, RF stages and sensor interfaces, where signal power is scarce. Power systems deliberately do the opposite: matching would waste half the power, so generators and grids run with load impedances far above the source impedance.