Menu

Executive Programs

Workshops

Projects

Blogs

Careers

Student Reviews



More

Academic Training

Informative Articles

Find Jobs

We are Hiring!


All Courses

Choose a category

Loading...

All Courses

All Courses

logo

DESIGN OF LOCATORS & HEAT STAKES FOR DOOR APPLIQUE

Aim: To create a closed solid, Tooling Axis, Heat stakes and locators for the given the given component. Software Used: CATIA-V5 Input Panel: CLASS-A Surface Door Applique. Introduction: 3-2-1 Principle: Locating Process: In order to completely specify the position in space of a three-dimensional object (such as the cube…

Project Details

Loading...

Leave a comment

Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.

Please  login to add a comment

Other comments...

No comments yet!
Be the first to add a comment

Read more Projects by SaiBharadwaj Sirigadi (26)

Project 2 - EDA on Vehicle Insurance Customer Data

Objective:

.

calendar

20 Jan 2023 09:04 PM IST

    Read more

    Project 1 - English Dictionary App & Library Book Management System

    Objective:

    .

    calendar

    17 Jan 2023 01:22 PM IST

      Read more

      Week 3 Sheet metal Bending challenge

      Objective:

      Objective: To perform sheet bending analysis by varying materials, coefficient of friction and mesh size. Software Used: Ansys Workbench 2021 R2. Introduction: In applied mechanics, bending (also known as flexure) characterizes the behaviour of a slender structural element subjected to an external load applied perpendicularly…

      calendar

      12 May 2022 03:14 AM IST

        Read more

        Week 2 Railwheel and Track

        Objective:

        Objective: To perform a static structural analysis on the Rail wheel and Track setup and compare it with User Defined Results with different Loads. Software used: Ansys 2021 R2. Analysis Results Total Deformation: Equivalent Elastic strain: Equivalent Stress: User Defined Result-Total Deformation:   Result Comparison:…

        calendar

        23 Apr 2022 05:02 AM IST

          Read more

          Week 2 Bevel Gear Challenge

          Objective:

          Objective: to perform Grid Dependency Test on a Bevel Gear Simulation. Software Used: Ansys 2021 R2. Theory: Grid Dependency Test: Grid dependency test is an investigation to know the solution dependency on the grid size by running the simulation with varied mesh size, finer the mesh gives higher accuracy of results. Solution…

          calendar

          19 Apr 2022 06:02 AM IST

            Read more

            Week 1 Spur Gear Challenge

            Objective:

            Objective: To recommend material (Cast Iron, Bronze and Steel) based on static structural analysis for Equivalent stress, Total deformation and Stress intensity and to locate possible fracture of the given spur gears. Software Used: Ansys Workbench. Given Materials: Cast iron, Bronze and Steel. Theory Cast IronCast…

            calendar

            06 Dec 2021 10:49 AM IST

              Read more

              Week 1 Stress Concentration on a Plate with hole

              Objective:

              Objective: To compare the deformation and maximum stress developed on a structural steel model for the given two cases, to select valid design as per analysis standpoint. Software Used: Ansys-19.0-Workbench. Material: Stainless steel. Given cases: Case-1: Case-2: Process flow in FEA: Procedure: Open Ansys Workbench.…

              calendar

              07 Oct 2021 11:32 AM IST

              • FEA
              Read more

              Week 6 - Data analysis

              Objective:

              Objective: To read the data from the file provided and perform some calculations and also to plot the graphs between different parameter.   Concept: The concept is to read the data file(engine_data.out) provided. Actually, the data file name with extension is taken from the user and then the data file is read. Then…

              calendar

              03 Oct 2021 09:40 AM IST

                Read more

                Week 5 - Curve fitting

                Objective:

                Curve fitting: Curve fitting is the process of constructing a curve, or mathematical function, that has the best fit to a series of data points, possibly subject to constraints. Curve fitting can involve either interpolation, where an exact fit to the data is required, or smoothing, in…

                calendar

                01 Oct 2021 06:28 AM IST

                  Read more

                  Master Section Development for B-Pillar Trim

                  Objective:

                  Aim: To create B-Pillar Trim, Dog House, Locators and Ribs from a B-Pillar’s A-class surface and Master sections by following OEM Standard Design Rules. Software Used: CATIA-V5,KEYSHOT-9. Input surface: B-Pillar’s Class-A surface Sequence of Operations: Looking for defects in Class-A surface. Improving Class-A…

                  calendar

                  24 Jun 2021 05:41 PM IST

                  Read more

                  Otto Cycle simulation Using Python

                  Objective:

                  Objective: To write a python code that can solve Otto cycle and plot it. Problem statement: It is necessary to analyze an engine cycle before going to manufacture. Engine air standard cycle is analyzed by plotting its air standard cycle with respect to different variables. It is a time taking procedure to plot a graph…

                  calendar

                  24 Jun 2021 05:40 PM IST

                    Read more

                    Solving second order ODEs using Python

                    Objective:

                    Objective: To solve ODE of simple pendulum using python. Problem Statement: It is necessary to solve ODE for a respective problem. It is manual process to solve ODE and time consuming to plot. It will be very easy if it can be written into computer understandable code. Theory: A function was defined for calculating the…

                    calendar

                    24 Jun 2021 05:40 PM IST

                      Read more

                      PLASTIC DESIGN OF CAR DOOR TRIM

                      Objective:

                      AIM: To create a CAD model considering the OEM standards from the Class-A surface of a Door Panel. SOFTWARE USED: CATIA-V5, Keyshot. INPUT SURFACE: INTRODUCTION: Door panels serve as an interface between the interior of the car and the inner workings of the door, and between vehicle occupants and the door. They are expected…

                      calendar

                      24 Jun 2021 05:39 PM IST

                      Read more

                      DESIGN OF LOCATORS & HEAT STAKES FOR DOOR APPLIQUE

                      Objective:

                      Aim: To create a closed solid, Tooling Axis, Heat stakes and locators for the given the given component. Software Used: CATIA-V5 Input Panel: CLASS-A Surface Door Applique. Introduction: 3-2-1 Principle: Locating Process: In order to completely specify the position in space of a three-dimensional object (such as the cube…

                      calendar

                      13 Jan 2021 12:31 PM IST

                      Read more

                      RIB DESIGN FOR COIN HOLDER

                      Objective:

                      Aim: To Design a rib for the given plastic component.  Software Used: CATIA-V5.  Input component: Coin Holder.  Introduction: Rib: Ribs are thin, wall-like features typically designed into the geometry of a part to add internal support to walls or other features like bosses. In a…

                      calendar

                      10 Jan 2021 11:25 AM IST

                      Read more

                      Door Arm Rest Week 8 Challenge

                      Objective:

                      .

                      calendar

                      05 Dec 2020 03:20 AM IST

                        Read more

                        Project 1

                        Objective:

                        .

                        calendar

                        15 Sep 2020 03:45 PM IST

                          Read more

                          Week 9:- 2D Detailing Challenge

                          Objective:

                          1.Drawing templates:A drawing template stores document settings that you can use again and again. This can include a sheet format. Here are some examples of these settings: Drawing Document Properties: Drafting Standards, Units, Font style and sizes, etc. Custom Properties Tree Display Predefined Views 2.Angle…

                          calendar

                          25 Aug 2020 07:20 AM IST

                            Read more

                            BIW FIXTURES-3D-FINISHING & DESIGN OF ROUGH LOCATORS

                            Objective:

                            Aim:To Perform 3D finish and create Rough locators for the Assembly design created for the given Panel. Software Used:CATIA-V5 Panel given: Introduction: 3D-Finishing:It is the process before sending the part for final simulation.The part should be checked for all proper clearences and representing…

                            calendar

                            22 Aug 2020 06:06 PM IST

                            Read more

                            BIW FIXTURES-3D-FINISHING THEORY

                            Objective:

                            1.3D-Finishing:It is the process before sending the part for final simulation.The part should be checked for all proper clearences and representing the maching sides of a part by applying colour codes.In this process the part is checked with hole concentricity,designing of rough locators for guiding the panel.Fasteners…

                            calendar

                            18 Aug 2020 06:51 AM IST

                              Read more

                              BIW FIXTURES-DESIGN OF BASE UNIT

                              Objective:

                              Aim:To Design a Base Unit for the Pin Units and Clamp units including Swivel clamp unit with all weldments for the given Car Panel. Software Used:CATIA-V5 Car Panel: Introduction: 1.Base Unit:A base unit is the unit designed to mount all the other units(Clamp unit, Pin unit, rest unit…

                              calendar

                              21 Jul 2020 08:20 AM IST

                              Read more

                              BIW FIXTURES-DESIGN OF SWIVEL CLAMP UNITS & PIN CLAMP UNIT

                              Objective:

                              Aim: To design 3 Different types of Swivel Clamp Unit with Different Riser, Blade and Clamp Arm for the given Car Panel and to design a Pin-Clamp Unit for the given Car Panel. Software Used:CATIA-V5 Car Panel: Introduction: This project is to design 3-Swivel clamp units and 1-Pin-clamp unit to fix it in fixed position.This…

                              calendar

                              08 Jul 2020 04:41 PM IST

                              Read more

                              BIW FIXTURES-DESIGN OF POWER CLAMP UNITS & REST UNITS

                              Objective:

                              Aim: To design 3 Different types of Power Clamp Unit with Different Riser, Blade and Clamp Arm for the given Car Panel and design 2 Different types of Rest Unit for the given Car Panel. Software Used:CATIA-V5 Car Panel: Introduction: This project is to design 3-power clamp units and 2-Rest units put together with…

                              calendar

                              26 Jun 2020 04:33 PM IST

                              Read more

                              PRE-DESIGN PROCESSES OF BIW FIXTURE

                              Objective:

                              1.DESIGN METHODOLOGY:Design methodology refers to the development of a system or method for a unique situation. Today, the term is most often applied to technological fields.It is       nothing but the steps followed dueing the concept design of BIW Fixture.The various stages of design methdologies…

                              calendar

                              30 Apr 2020 03:08 AM IST

                              Read more

                              BASICS OF BIW FIXTURE DESIGN

                              Objective:

                              1.   PROJECT EXECUTION:It involves Establishing and managing the project team. Coordinating people and resources. Monitoring team performance.The items produced by project                   execution are:The risk and issue management responses plus corrective…

                              calendar

                              19 Apr 2020 08:45 PM IST

                                Read more

                                INTRODUCTION TO BIW FIXTURES

                                Objective:

                                BIW :It is short for \"Body In White\" refers to the stage in Automobile Manufacturing in which automobile\'s body sheet metal components(doors,hood,trunks,bumpers and panels) made up of homogenous materials(steel or alluminium sheets or composites) are assembled together,using one or more combination of different techniques(welding,riveting,clinching,bonding,laser…

                                calendar

                                09 Apr 2020 03:12 AM IST

                                Read more
                                Showing 1 of 26 projects