HEC-RAS Projects

Project 2
Aim To compute flood levels of a river in our area. Tools Used HEC RAS DEM of the river. Google Chrome (or any other Browser) Excel Sheet Autocad Google Earth Pro  Introduction Bridge is a passage of transportation (for people or vehicles) over a large body of water or physical obstruction. A culvert is generally…
  • Catchment
  • DEM
  • GIS
  • HEC-RAS
  • HTML
  • QGIS

Project submitted by -

submitdetails

Jija

Know more
Objective:- To Develop a Hydraulic Model for a Major River selected from particular area using RAS Mapper tool of HEC-RAS. Calculating catchment area over a River reach of 10 Km and do flow calculations for the river using UH method. Considering Steady flow and Unsteady Flow analysis both and run the simulation…
1.ans.:- Objective:- To Develop a Hydraulic Model for a Major River selected from particular area i.e. Entering cross sectional data, creating geometry of river, Calculating catchment area over a River reach of 10 Km and do flow calculations for the river using UH method. Considering Steady flow analysis and…
Aim To use toposheet for catchment area calculations. To calculate flow for selected river using UH Method To analyse and observe differnt run profiles and steady flow analysis Software Required Microsoft Excel HEC-RAS Autocad Google Chrome (Or any other browser) Google Earth Pro Procedure Select a river. Here I choose…

Project submitted by -

submitdetails

Jija

Know more
OBJECTIVE:The purpose of this challenge is  To compute flood levels of considered river of atleat 10km To enter all the inline and lareal structures to the considered river To enter geometric data using RAS mapper To do flow calculations for the considered river To generate bot steady and unsteady flow analysis To compute…

Project submitted by -

submitdetails

Mahareddy

Know more
OBJECTIVE: The purpose of this project is to select a river which is having it's length greater than 10 km.Then to  enter it's crosssections and use toposheet for catchment area calculations and to use Unit Hydrograph method for catchment area calculations.To run the river model for different profiles by considering…

Project submitted by -

submitdetails

Mahareddy

Know more