
Construction project management courses online
Every Skill-Lync course on construction planning, scheduling, Primavera P6, cost control, contracts and progress reporting, with fees, hours, projects and which ones overlap.
- 11
- courses
- ₹40,000
- per short course
- 15 to 25
- hours per short course
- 3
- PG programs
As of 21 Nov 2026 · Fees are the list price on each course page, inclusive of all charges
Skill-Lync teaches construction project management in 11 online courses: eight 12-week courses (Construction Project Management Fundamentals, Project Planning and Scheduling, two Primavera P6 courses, Project Cost Control, Contract and Subcontract Management, Project Progress Measurement and Reporting, and Excel for construction project management) and three PG programs that include them. Here they all are with fees, hours and projects, which ones repeat each other, and which fits a planning, billing, cost or contracts job.
Every Skill-Lync course that teaches Construction Project Management
| Course | Level | Duration | Projects | Fee |
|---|---|---|---|---|
| Construction Planning using Primavera P6 | Short course | 12 weeks | 2 | ₹40,000 |
| Construction Project Management Fundamentals | Short course | 12 weeks | 2 | ₹40,000 |
| Excel Skills and Data Analysis for Construction Project Management | Short course | 12 weeks | 2 | ₹40,000 |
| Contract and Subcontract Management | Short course | 12 weeks | 2 | ₹40,000 |
| Project Cost Control | Short course | 12 weeks | 2 | ₹40,000 |
| Project Management Using Primavera | Short course | 12 weeks | 2 | ₹40,000 |
| Project Planning and Scheduling | Short course | 12 weeks | 2 | ₹40,000 |
| Project Progress Measurement and Reporting | Short course | 12 weeks | 2 | ₹40,000 |
| Post Graduate Program in Construction Project Management | PG program | 24 weeks | 16 | ₹2,75,000 · EMI from ₹14,375/mo |
| Post Graduate Program in Infrastructure - Engineering Design and Project Management | PG program | 32 weeks | 12 | ₹2,75,000 · EMI from ₹14,375/mo |
| Post Graduate Program in Buildings - Engineering Design and Project management | PG program | 48 weeks | 16 | ₹2,75,000 · EMI from ₹14,375/mo |
Projects is the number of industry projects listed on the course page. Programs also include the courses' smaller assignments. EMI figures are the lowest monthly plan shown on the course page.
Which one should you pick?
- You are new to construction management. Construction Project Management Fundamentals (12 weeks, ₹40,000, 25 h, the most video of the eight) gives one week to each part of a project: tendering, engineering, procurement, stores, plant, scheduling, cost and earned value, billing, safety, quality and digital tools. Projects: the contracting plan for a metro project and a delay report for a multistorey building. It is in all three programs.
- You want to be a planning engineer. Take Project Planning and Scheduling (15 h) for the method (WBS, sequencing, PERT/CPM, resource levelling; projects: a police station schedule and a township plan), then one P6 course. Construction Planning using Primavera P6 (22 h) schedules a G+2 school and a 100 m WBM road; Project Management Using Primavera (20 h) plans a bridge and a cable-laying job and adds earned value. The Primavera P6 hub compares the two in detail.
- You want billing, cost control or quantity surveying. Project Cost Control (18 h) covers estimation, BOQs, rate analysis, budgets, variations and profit forecasting, with a cost control plan for a ₹50 crore residential project. Add Contract and Subcontract Management (19 h) for tenders, GCC and SCC, claims and FIDIC; its projects are a scope of work for a tender and an extension-of-time application.
- You want project controls and reporting. Project Progress Measurement and Reporting (20 h) has the fullest earned value week (down to TCPI), S-curves, dashboards and report formats. Its two projects are written studies, not a live schedule. Excel Skills and Data Analysis for Construction Project Management (19 h) is a general Excel course with a labour S-curve project.
- You want the full set. The PG Program in Construction Project Management (24 weeks, ₹2,75,000, EMI from ₹14,375 a month) bundles seven of these courses (all except Construction Planning using Primavera P6) plus a Power BI dashboards course. Bought separately, those seven cost ₹2,80,000. Its pricing adds career services: resume and LinkedIn help, mock interviews and access to Skill-Lync's network of 500+ recruitment partners for interview opportunities.
- You want design first, management second. The PG programs in Infrastructure (32 weeks) and Buildings (48 weeks) cost the same ₹2,75,000 but are mainly road design and building design. Each has only two construction management courses. Choose them for the design skills.
What is Construction Project Management?
Construction project management is getting a building, road or plant built to the contract's scope, on time and within budget. On a contractor's site it splits into a few jobs: planning engineers build and update the schedule, billing engineers and quantity surveyors measure work and raise bills, cost controllers compare what was spent with what was earned, contracts engineers handle tenders, subcontracts, variations and claims, and the project manager answers for all of it, along with quality and safety. Owners and project management consultants do the same work from the client's side.
The core measurement is earned value. Take a ₹50 crore building job (assumed figures throughout). At the status date the baseline says 40% of the work should be done, so the planned value (PV) is ₹20 crore. On site, substructure (budget ₹10 crore) is complete, superstructure (₹20 crore) is 30% done and finishes and MEP (₹20 crore) 5%: the earned value is 10 + 6 + 1 = ₹17 crore, 34% physical progress, the point the actual S-curve has reached. Accounts say ₹19 crore has been spent. So the cost variance EV − AC is ₹2 crore over, the schedule variance EV − PV is ₹3 crore behind, CPI = EV ÷ AC = 0.89 and SPI = EV ÷ PV = 0.85. A CPI below 1 means every rupee spent is buying less than a rupee of planned work. If that continues, the estimate at completion BAC ÷ CPI is ₹55.9 crore, ₹5.9 crore over budget. To still finish at ₹50 crore, the remaining ₹33 crore of work must be done for the ₹31 crore left: a to-complete index of 1.06, against 0.89 so far. One limit: SPI is measured in money, so whether the finish date slips depends on whether the late work is on the critical path.
Money also moves through the running bills. Under CPWD's General Conditions of Contract 2023, a contractor may ask for a mobilisation advance of up to 10% of the tendered amount (Clause 10B), paid in instalments of at most 5% against bank guarantees for 110% of the advance, at 8% simple interest. Recovery starts once the first 10% of the work's gross value has been executed and paid, and runs pro rata so the whole advance is back by the time 80% has. On a ₹20 crore contract: an advance of ₹2 crore, recovered from billing between ₹2 crore and ₹16 crore, which is 2 ÷ 14 = 14.29% of every rupee billed in that band. If bills so far total ₹1.2 crore and the next one is ₹1.5 crore, only the ₹70 lakh above ₹2 crore attracts recovery: ₹10 lakh. Clause 1A also deducts 2.5% of each bill's gross amount as security deposit, ₹3.75 lakh, until it reaches 2.5% of the tendered amount (₹50 lakh). The bill pays ₹136.25 lakh before interest on the advance, taxes and other deductions; the next ₹1.5 crore bill loses ₹21.43 lakh to recovery. Billing engineers do this on every bill. Skill-Lync's free billing engineer workshop covers the deductions on a bill, including retention and mobilisation advance recovery.
What a Construction Project Management course covers
- The project lifecycle. Project vs operations, stakeholders, process groups and organisation structures; engineering stages and drawings; procurement, site stores and material reconciliation; plant and machinery (hire or buy, depreciation); HSE plans; quality plans, ITPs and QA vs QC; digital tools such as a common data environment, 5D BIM, scan to BIM and RFID.
- Planning and scheduling. Planning, monitoring and control systems, milestones, the work breakdown structure, sequencing and interdependencies, relationships, leads and lags, CPM and PERT network analysis, resource allocation and levelling, reducing project duration, schedule levels, baselines and a master construction programme.
- Primavera P6. EPS and OBS, calendars, WBS, activities, relationships and constraints, the critical path, resources and roles, levelling, baselines, progress updates, earned value and S-curves, risks, issues and thresholds, Visualizer and reports.
- Cost estimation and control. Direct and indirect cost, BOQ and quantity take-offs, unit rate analysis, budgets, variation orders and value engineering, change orders, contingency, risk mitigation, budget transfers, profit forecasting, a cost MIS and claim evaluation.
- Contracts and subcontracts. What makes a contract valid, fixed price, cost plus and time-and-material contracts, LSTK, EPC, EPCM and item rate, GCC and SCC, breach and force majeure, claims and arbitration in India, the tender process from notice inviting tender to closure, BOQ and schedule of rates, back-to-back subcontracts and the FIDIC books.
- Progress, billing and reporting. Monitoring and tracking, RACI and communication matrices, documentation and minutes, progress report formats, earned value (PV, EV, AC, SV, CV, SPI, CPI, EAC, ETC, VAC, TCPI), S-curves, bar charts and dashboards; client and vendor billing with deductions, retentions and advances; Excel lookups, pivot tables, Power Query, date functions and macros.
The courses in detail
Construction Planning using Primavera P6
Primavera P6 in 12 weekly topics (22 h): planning basics and the iron triangle, contracts and portfolio structure, calendars and WBS, activities and sequencing, critical path analysis, lags and leads, baselines, resources and levelling, progress updating, P6 risk scoring, issues and thresholds, Visualizer and reports. Projects: a schedule for a G+2 school building, and a resource-loaded schedule for a 100 m WBM road.
Projects include: Developing a realistic schedule to construct a main school building (G+2); Developing the project schedule of the 100m WBM road construction project.
Tools: Primavera P6
Construction Project Management Fundamentals
One week on each area of a construction project (25 h): lifecycle and organisation, tendering and contracts, engineering deliverables and drawings, procurement, site stores and inventory, plant and machinery (hire or buy, depreciation), scheduling, cost control with earned value and extension-of-time claims, client and vendor billing with retentions and advances, HSE, quality plans and ITPs, and digital tools such as 5D BIM and a common data environment. Projects: the contracting and tendering plan for a metro project, and a delay and cost-overrun report for a multistorey building.
Projects include: Understanding Contracting and Tendering Process for the Commencement of a Metro Project; Analysis and Report Generation for Delays in Multistorey Building Project.
Excel Skills and Data Analysis for Construction Project Management
The Excel analysis course in 10 weekly topics (19 h): functions, formatting and date functions (NETWORKDAYS, EOMONTH), conditional and lookup functions, pivot tables, Power Query and PowerPivot, large data sets, data validation, list functions, macros and email automation. Projects: labour charts and S-curves for water supply projects, and a pivot-table report.
Projects include: Data Cleaning and Transformation Using Charts and S-Curves in Excel; Data Analysis Using Pivot Tables and Report Creation.
Tools: MS Excel
Contract and Subcontract Management
Contract management in 12 weekly topics (19 h): what makes a contract valid, fixed price, cost plus and time-and-material contracts, LSTK, EPC, EPCM and item rate contracts, general and special conditions (GCC and SCC), breach, force majeure and void contracts, claims and the steps of arbitration in India, the tender process from notice inviting tender to contract closure, subcontracting with BOQs and schedules of rates, and the FIDIC contract books. Projects: a scope of work for a tender, and an extension-of-time application for a water infrastructure project.
Projects include: Develop a Scope document or Scope of Work (SOW) for a tender; Develop an Extension of Time (EOT) application for a water infrastructure project.
Project Cost Control
Cost estimation and control from the contractor's and the client's side (18 h): direct and indirect cost, BOQ and quantity take-offs, unit rate analysis, budgets, variation orders and value engineering, change orders, contingency, risk mitigation, budget transfers, profit forecasting, a cost MIS and claim evaluation. Projects: a cost control plan for a 50 crore rupee residential project, and a review of the tender documents for a warehouse.
Projects include: Developing a Project Cost Control Plan for a Residential Project; Analyzing the Tender Documents for a Warehouse Construction Project.
Project Management Using Primavera
Primavera P6 in 12 weekly topics (20 h): EPS and OBS, calendars, WBS, activity types, relationships, constraints and the critical path method, resources and roles, levelling and resource curves, baselines, progress updates, earned value with S-curves and monthly cash flow, risk register, issues and thresholds, and reports. Week 1 shows the client interface of P6 Release 8.2. Projects: a bridge construction plan on a 6-day working calendar, and a cable-laying plan with resource optimisation.
Projects include: Developing a Project Plan for Bridge Construction; Developing a Project Plan for a Cable-Laying Project.
Tools: Primavera P6
Project Planning and Scheduling
Planning and scheduling method (15 h): planning, monitoring and control systems, milestones, building a work breakdown structure, sequencing and interdependencies, relationships, leads and lags, PERT/CPM network analysis, resource allocation and levelling, reducing project duration, and the types of contracts and EPC schedules. Projects: a police station building schedule with critical activities found by total float, and a township development plan.
Projects include: Developing the Schedule for the Construction of Police Station Building; Planning and Scheduling of the Township Development.
Project Progress Measurement and Reporting
Project controls and reporting (20 h): project lifecycle and organisation, communication management and RACI matrices, documentation and minutes, monitoring and tracking, internal and external progress reports, schedule preparation and a master construction programme, CPM and PERT, earned value (PV, EV, AC, SPI, CPI, EAC, ETC, VAC, TCPI), and S-curves, bar charts and dashboards. Both projects are written studies: one on communication systems, one on scheduling techniques.
Projects include: Detailed Study: Communication Systems in Project Management; Detailed Study: Scheduling Techniques in Project Management.
Post Graduate Program in Construction Project Management
Eight courses: Construction Project Management Fundamentals, Project Planning and Scheduling, Project Management Using Primavera, Project Progress Measurement and Reporting, Project Cost Control, Contract and Subcontract Management, Excel for construction project management, and a Power BI dashboards course. Its pricing lists career services: resume and LinkedIn help, mock interviews, and access to Skill-Lync's network of 500+ recruitment partners for interview opportunities.
Projects include: Understanding Contracting and Tendering Process for the Commencement of a Metro Project; Analysis and Report Generation for Delays in Multistorey Building Project; Developing the Schedule for the Construction of Police Station Building; Planning and Scheduling of the Township Development.
Tools: Primavera P6, MS Excel, Power BI
Post Graduate Program in Infrastructure - Engineering Design and Project Management
A 32-week program that contains all four road design courses (geometric design fundamentals, fundamentals of road design, Civil 3D with InfraWorks and Map 3D, and OpenRoads Designer), a traffic engineering course (traffic studies, level of service, intersections and signal timing), Construction Project Management Fundamentals and Project Management Using Primavera. Projects range from highway corridors to a metro tender and a bridge construction schedule.
Projects include: Designing, Plotting, and Quantifying a Resurfacing Project; Designing, Plotting, and Quantifying a Reconstruction Project; Geometric Design Parameter; Lane National Highway Roadway Design in Civil 3D.
Tools: INFRAWORKS, CIVIL 3D, Map 3D, Bentley’s Openroads Designer, Civil 3D, Primavera P6
Post Graduate Program in Buildings - Engineering Design and Project management
Mainly building design: Revit, ETABS and SAFE for seismic design, STAAD.Pro for industrial structures, tensile structures, and Rhino and Grasshopper for energy analysis. Two of its seven courses are construction management: Construction Planning using Primavera P6 and Construction Project Management Fundamentals.
Projects include: Building 3D Model from Concept Stage to Design using Revit; Creating Architectural and Structural Models, Detecting Clashes using Naviswork; Integrating Dynamo and Autodesk Revit to Design a 3D Model; Preparing a Schedule and Cost Estimation Report using Revit.
Tools: ETABS, SAFE, RFEM, Revit, STAAD.Pro, Rhino, Grasshopper, Primavera P6
Jobs after a Construction Project Management course
Typical job titles: planning engineer or junior planner, billing engineer, planning and billing engineer, quantity surveyor, estimation engineer, cost controller, contracts or procurement engineer, project engineer, project coordinator and, with experience, project manager. Employers are building and infrastructure contractors, EPC companies, real estate developers, project management consultancies and cost consultants, in India and in the Gulf.
From Skill-Lync's own placement records (as of 21 Nov 2026, 3,905 placements): 23 civil placements have a planning, billing, quantity surveying, estimation or contracts job title, placed 2021 to 2024: 14 planning or scheduling, 8 billing, QS or estimation and 1 contract management. All report a salary: median 3 LPA, range 1.2 to 12 LPA; planning titles alone have a median of 3.3 LPA. Of the 23, 11 were freshers. Employers in these records include L&T Construction, BL Kashyap & Sons, Sobha, Casagrand and Eversendai. For comparison, all 367 civil placements with a salary have a median of 2.4 LPA.
Read these with care. 21 of the 23 came from Skill-Lync's Master's in Civil Engineering program and none from the PG Program in Construction Project Management, which has no placement records yet. They are learners who told us they were placed, so treat them as a starting point, not as the market rate. More: civil engineer salaries.
Free Construction Project Management tutorials
Start here before you pay for anything. These are written by Skill-Lync learners and engineers:
- How is Primavera Software Important for Civil Engineering?
- Civil Engineering Jobs for Freshers in India: Roles, Hirers, Starting Pay
- Civil Engineering Interview Questions: 30 Answers With Worked Numbers
- Top 10 Primavera Interview Questions with Answers
- Top 10 Job Profiles for Civil Engineers
- AI and Construction: Bridging the Gap Between Automation and Human Expertise
- BIM in Revit: Enhancing Design and Construction Processes
- How Are Mega-Tall Skyscrapers Built? The Engineering, Step by Step
Before you pay
The same topics appear in several courses. The critical path method is taught in Project Planning and Scheduling, Project Progress Measurement and Reporting and both P6 courses; earned value in the Fundamentals course, Progress Measurement and Project Management Using Primavera. Buy three or four of these and expect repeated weeks.
Do not buy both Primavera courses. They share the P6 core (WBS, activities, relationships, CPM, resources, baselines, updating, reports) and differ mainly in projects. Project Management Using Primavera's first week shows the interface of P6 Release 8.2, an old version, so ask which release the recordings use.
One construction course is left off this page. Effective Dashboards using Power BI for Construction Management has the same syllabus and projects as the general Power BI course and nothing about construction in it; it is on the business analytics courses page. It is still one of the eight courses in the PG Program in Construction Project Management. The Excel course here is also general Excel, with one construction project.
The two design programs are mostly design. Of the nine courses in the PG Program in Infrastructure and the seven in the PG Program in Buildings, two each are construction management. The PG Program in Construction Project Management is the only program here built for this work.
No certification exam, no software licence. None of these courses includes a PMP or other certification exam, and none says it includes a Primavera P6 licence. The contracts course teaches Indian contract practice and arbitration plus FIDIC; it is not legal training.
Who should not buy. IT and software project managers (every project here is construction), and planners who already run P6 schedules on site: the courses start from the basics.
Construction Project Management course FAQs
What is the fee for a construction project management course at Skill-Lync?
As of 21 Nov 2026, each of the eight short courses is ₹40,000, inclusive of all charges. The PG Program in Construction Project Management, and the Infrastructure and Buildings design programs that include construction management courses, are ₹2,75,000 each, with EMI from ₹14,375 a month.
Which construction management course should a fresher take first?
Construction Project Management Fundamentals: 12 weeks and 25 hours of video covering the whole project, from tendering and procurement to scheduling, cost, billing, safety and quality. After it, choose by role: planning and scheduling with P6 for planning jobs, cost control and contracts for billing, QS and contracts jobs.
What does a planning engineer do on a construction project?
A planning engineer builds the project schedule (WBS, activities, durations, logic, critical path), sets the baseline, updates progress every week or month, reports delays and their effect on the finish date, and prepares recovery plans. Most use Primavera P6 or MS Project and Excel, and work closely with billing and site teams.
What do CPI and SPI mean in earned value management?
CPI is earned value divided by actual cost; SPI is earned value divided by planned value. Below 1 is bad: a CPI of 0.89 means each rupee spent bought 89 paise of planned work. Dividing the budget by CPI gives a forecast final cost, ₹55.9 crore on a ₹50 crore job in the example above.
Do I need Primavera P6 for construction project management?
For planning and scheduling jobs with contractors, EPC firms and consultants, yes: many large projects ask for schedules in P6. Billing, quantity surveying, cost and contracts roles lean more on Excel, BOQs and contract knowledge. Skill-Lync has two P6 courses; the PG Program in Construction Project Management includes one.
Who can join a construction project management course?
The course pages name students and graduates of civil engineering, architecture and related streams. Site engineers moving into planning, billing or cost roles are a good fit too. No software is needed before you start, and some site experience makes scheduling logic, measurement and billing far easier to follow.