Preparing Schedule & Cost Estimation for a building using REVIT
Q1. Use the shortcut keys in Revit discussed in class to complete the following tasks and list them below
a. Using 3D model create a section box
b. To create similar doors and windows in a floor plan layout
c. To reduce the thickness of lines visible in plan views
d. To apply override settings to a floor in the model section view
e. To increase the range of visibility in a plan view
f. To select the previously selected items
g. To add annotations to the model views
h. To bring the model elements in line
i. To rotate the model elements
j. To move an object to another location
k. To copy a model element
L. To mirror an element about an axis
m. To create an array of model elements.
ANSWER:
a. Using 3D model create a section box: BX
b. To create similar doors and windows in a floor plan layout: CS
c. To reduce the thickness of lines visible in plan views: TL
d. To apply override settings to a floor in the model section view: EOD
e. To increase the range of visibility in a plan view: VR
f. To select the previously selected items: CTRL+C
g. To add annotations to the model views: DL
h. To bring the model elements in line: AL
i. To rotate the model elements: RO
j. To move an object to another location:MV
k. To copy a model element: CO
L. To mirror an element about an axis: MM
m. To create an array of model elements: AR
Q2) Using Revit and the project used from week 6 to 8 prepare a schedule for the following
a. Walls b. Doors c. Windows d. Material - Concrete/Wood.
ANSWER:
AIM: To prepare a schedule of the project from previous model link wall, window,doors, and material componenets.
TOOLS ARE USED:
- View.
- schedule.
- Schedule properties.
- Schedule quantities.
PROCEDURE
1). open the schedule tab in view, and select the schedule quantities and press enter.
2). Select the components like walls, doors, windows and materials.
3). Then th schedule tab dialog box appears then select the components that it display the schedules.
RESULT:
DOOR SCHEDULE

WALL SCHEDULE:

WINDOW SCHEDULE:

Finaly we prepare the schedule of listed given above.
Q3) Using Revit Calculate area and volume of each room in the model with appropriate room tags applied to each room. Prepare a schedule report for area and volume of each room.
ANSWER:
AIM: To using Revit Calculate area and volume of each room in the model with appropriate room tags applied to each room. Prepare a schedule report for area and volume of each room.
PROCEDURE:
1. SELECT THE schedule quantities in view tab
2. Then, add the room schedules and click ok to enter the room schedules OF EACH ROOM SCHEDULES.
RESULT:

Q4) Using the same schedule using the unit cost rate for materials available in the internet prepare total cost of materials used in the project a. Total Cost of Materials b. Individual Material Take off.
ANSWER:
AIM: To create schedule sheet to calculate the total cost.
PROCEDURE: 1. select the view tab, the material takeoff option is selected to obtain the material cost and material take off as shown below.
RESULT: WALL MATERIAL TAKEOFF:

Door material takeoff:

Q5) Using the concept of Visual Programming discussed in class, list a flowchart for the following scenario a. How to decide framings for a structure using Dynamo? b. If there is no water coming from the pipes c. If request for money from client has been declined for the project.
ANSWER:
AIM: Using the concept of Visual Programming discussed in class, list a flowchart for the following scenario.
a). How to decide framings for a structure using Dynamo ?

b.)

c.)
Q6.)List the parameters associated with each model element
a. Wall
b. Floor
c. Door
d. Window
e. Table
f. Building
ANSWER:
WALL:
• length
• width
• thickness
• type
• material used.
FLOOR:
• Length
• width
• area
• volume
• thickness
• type and family
DOOR
• height
• lenght
• thickness
• materil used.
WINDOW:
• height
• lenght
• thickness
• materil used.
TABLE:
• HEIGHT
• TYPE AND FAMILY
• material used
BUILDING:
• LENGTH
• width
• height
• area
• numbers category.