AIM To create CLASS B and CLASS C from CLASS A surface, creating Solid-Body, Tooling axis, Slider axis and performing Draft Analysis. TOOLING AXIS AND SLIDER AXIS Tooling axis: The direction in which the mold or core and cavity opens is the tooling axis. Slider axis: When there are through holes,…
Rudrappan N
updated on 30 Jul 2021
Project Details
Leave a comment
Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.
Other comments...
Read more Projects by Rudrappan N (11)
Project
MainOperation.java package Calculator; import java.io.BufferedReader;import java.io.File;import java.io.FileReader;import java.io.FileWriter;import java.io.IOException;import java.util.Scanner; public class MainOperation {private static int calCount =0; public static void main(String[] args) { PerformingMathOperations…
26 Dec 2022 08:28 AM IST
Week 8 - Challenge 4 - Coin Holder Design
AIM To create CLASS B and CLASS C from CLASS A surface, creating Solid-Body, Tooling axis and performing Draft Analysis. TOOLING AXIS Tooling axis: The direction in which the mold or core and cavity opens is the tooling axis. DIFFERENT VIEWS OF COIN HOLDER DRAFT ANALYSIS All areas are…
30 Jul 2021 02:22 PM IST
Week 8 - Challenge 5 - Core & Cavity Design
AIM To create Core and Cavity for the given Solid Body, and creating a Parting Line and Parting Surface. TOOLING AXIS Tooling axis: The direction in which the mold or core and cavity opens is the tooling axis. CORE AND CAVITY The core is the male part which forms the internal shape…
30 Jul 2021 02:16 PM IST
Door Arm Rest Week 8 Challenge
AIM To create CLASS B and CLASS C from CLASS A surface, creating Solid-Body, Tooling axis, Slider axis and performing Draft Analysis. TOOLING AXIS AND SLIDER AXIS Tooling axis: The direction in which the mold or core and cavity opens is the tooling axis. Slider axis: When there are through holes,…
30 Jul 2021 02:07 PM IST
Week 9 - Project - Master Section Development
AIM To create CLASS B and CLASS C from the given CLASS A surface and Master Section, creating Solid-Body, Tooling axis and performing Draft Analysis. TOOLING AXIS AND LIFTER AXIS GREENLINE represents the Tooling axis. BLUELINE represents the Lifter axis for Dog house with a 4-way locator. CLASS…
30 Jul 2021 02:05 PM IST
Week 8 - Challenge 3 - Switch Bezel Design
AIM To create CLASS B and CLASS C from CLASS A surface, creating Solid-Body, Tooling axis and performing Draft Analysis. TOOLING AXIS Tooling axis: The direction in which the mold or core and cavity opens is the tooling axis. DIFFERENT VIEW OF SWITCH BEZEL DRAFT ANALYSIS All areas…
30 Jul 2021 01:59 PM IST
Week 8 - Challenge 2 - Base Bracket Design
AIM To create CLASS B and CLASS C from CLASS A surface, creating Solid-Body, Tooling axis and performing Draft Analysis. TOOLING AXIS Tooling axis: The direction in which the mold or core and cavity opens is the tooling axis. DIFFERENT VIEWS CLASS A SURFACE All areas are with a minimum draft angle of…
30 Jul 2021 01:48 PM IST
Week 8 - Challenge 1 - Draft Analysis on a Fan Cover
AIM To create Tooling Axis and Draft Analysis for the given Class-A surface. TOOLING AXIS Tooling axis: The direction in which the mold or core and cavity opens is the tooling axis. DRAFT ANGLE All areas are with a minimum draft angle of 3 degrees. FEATURE TREE CONCLUSION Draft…
30 Jul 2021 01:36 PM IST
Radar Mast & Final Assembly of Yacht
Radar Mast isometric view Radar Mast front view Radar Mast side view Radar Mast top view Radar Mast feature tree Yacht assembly isometric view Yacht assembly front view Yacht assembly side view Yacht assembly top view Yacht assembly feature tree Modelling Yacht in Solidworks Aim …
11 May 2021 04:47 PM IST