Menu

Executive Programs

Workshops

Projects

Blogs

Careers

Student Reviews



More

Academic Training

Informative Articles

Find Jobs

We are Hiring!


All Courses

Choose a category

Loading...

All Courses

All Courses

logo

Nitin Prabhakar Arolkar

Skills Acquired at Skill-Lync :

  • Steel Structures

57 Projects

To plan a structural layout and to create grids using TSD

Objective:

AIM: To Explain about the access and the usage of the following: Project Workspace Scene Content Create two scene views Loading drop list   Properties windows (a) Project Workspace: The Project Workspace is a  control in the project. The Project Workspace appears in  the project window. The…

calendar

01 Apr 2024 07:00 PM IST

    Read more

    To model columns for industrial steel structure using TSD

    Objective:

    Aim: Create column properties for different types of pedestal members and model in the grids created as per the assignment 1 Create column properties for steel columns and model columns in the grid created as per assignment 1. Create beam properties and model primary and secondary beams on the ground floor PROCEDURE:-…

    calendar

    18 Apr 2024 10:19 AM IST

      Read more

      To model beams and bracings for industrial steel structures using TSD

      Objective:

      1.Create beam properties for First floor and model the beams. Ans) Aim: To create beam properties for First floor and model the beams. Tools Required: -> Levels -> Manage Properties -> New -> Members -> Steel Beam. -> Grids -> Beams -> Properties tab. -> Validate Procedure: • Firstly…

      calendar

      22 Apr 2024 07:06 AM IST

        Read more

        To calculate dead and live load for industrial steel structures and to apply them using TSD

        Objective:

        1. Calculate dead load in design report based on IS code and apply dead load on the model Finishes of 50mm Slab as per design Brickwall 150mm thickness Roofing load based on purlin size Ceiling loading 0f 0.3KN per sq m AIM : To calculate dead load in design report based on IS code and apply dead load on the model TOOLS…

        calendar

        23 Apr 2024 04:43 PM IST

          Read more

          To calculate wind load for industrial steel structures and to apply it by using TSD

          Objective:

          Generate manual wind loading in the design report based IS code as per the following input Basic wind speed = 39m/s Terrain category 2 A) AIM: TO GENERATE MANUAL WIND LOADING IN THE DESIGN REPORT BASED ON IS CODE AND MENTIONED INPUTS. TOOLS/APPARATUS REQUIRED: EXCEL IS CODEBOOK(875 P3) DIMENSION CALCULATOR property window(…

          calendar

          27 Apr 2024 01:03 PM IST

          • CAE
          • DESIGN
          Read more

          To Model a RC residential structure using TSD

          Objective:

          AIM:- To set up model for RC Building design base on the parameters for cover. PROCEDURE : Firstly we have to open new file in TEKLA software using new icon present in file tab. Now let us select the settings icon from the home tab. After selecting the settings icon a dialog box appears then let us modify settings according…

          calendar

          07 May 2024 06:43 PM IST

            Read more

            Challenge 1

            Objective:

            Question:1Why is a metro rail needed in countries with developing economy? What is your basic understanding on the differences between a conventional rail system and a metro rail system?Answer: Title: The Relevance of Metro Rail Systems in Economies Under DevelopmentIntroduction:In countries with developing economies,…

            calendar

            07 Aug 2024 12:11 PM IST

              Read more

              Challenge 2

              Objective:

              Question 1:-What are the structural components of a bridge? Explain in detail about the foundation, sub structure and super structure components of the bridge? Anwser:-A bridge is a complex structure built to span physical obstacles such as bodies of water, valleys, or roads, and provide passage…

              calendar

              08 Aug 2024 07:36 AM IST

              Read more

              Challenge 3

              Objective:

              1)What are the sectional properties we need upfront for designing a metro viaduct? What is the supporting software for identifying the sectional properties and designing them?Designing a metro viaduct involves a detailed structural analysis to ensure the safety, stability, and functionality of the structure. Sectional…

              calendar

              10 Aug 2024 08:16 AM IST

              Read more

              Challenge 4

              Objective:

              What is a pre stressed I girder? Why should a designer choose I girders when we are having double deck bridges and substantiate your answer with structural clearances?Ans:-A pre stressed I girder is a type of structural member commonly used in bridge construction. It consists of steel or concrete beam in the…

              calendar

              20 Aug 2024 05:40 PM IST

              Read more

              Challenge 5

              Objective:

              1.Explain the procedure of transverse analysis of deck slab of a metro viaduct.Transverse analysis of a deck slab in a metro viaduct involves evaluating the structural integrity and performance of the horizontal slab that forms the top surface of the viaduct. This analysis is crucial to ensure the safety, durability, and…

              calendar

              26 Aug 2024 08:00 AM IST

              Read more

              Challenge 6

              Objective:

              1. What is elastomeric bearings? And what is made of and the uses of them.Elastomeric bearings are structural components designed to provide flexibility and movement in buildings and infrastructure, particularly in response to dynamic forces like seismic activity, temperature fluctuations, and other forms of motion. These…

              calendar

              27 Aug 2024 07:36 AM IST

              Read more

              Challenge 7

              Objective:

              1.What are Pier caps and explain the operations of launching of pier capsPier caps are structural elements used in bridge construction and other civil engineering projects to provide support and load distribution at the tops of piers or columns. They are typically made of reinforced concrete or other…

              calendar

              27 Aug 2024 07:41 AM IST

                Read more

                Challenge 8

                Objective:

                1.What are piers and explain about. Explain loads considered for calculating the total design force?Piers are structural elements typically used in construction to support loads from a bridge, building, or other elevated structure. They are vertical or near-vertical columns or posts that transfer the weight of the…

                calendar

                27 Aug 2024 07:46 AM IST

                Read more

                Challenge 9

                Objective:

                Explain the dead load calculations of a pier cap and a circular pier? Provide the values in KN/m.Inputs:Length=30mVolume of Pier cap=35 m3Diameter of the pier = 2mConcrete density = 25KN/m3Answer:Dead load is the weight of the structure and any permanent components, such as the pier cap and circular pier, and it is an…

                calendar

                27 Aug 2024 05:21 PM IST

                  Read more

                  Challenge 10

                  Objective:

                  1. Explain how the pile caps should be designed considering the tilt and shift conditions and mention advantages of the same?Answer:Pile caps are reinforced concrete structures that distribute the load of a group of piles to the underlying soil. In some cases, the piles may experience tilt or shift due to soil settlement…

                  calendar

                  29 Aug 2024 06:53 AM IST

                    Read more

                    Challenge 11

                    Objective:

                    1. Briefly describe about soil structure interaction in a pile foundation?Answer:Soil-structure interaction (SSI) refers to the complex interaction between the foundation of a structure (such as a pile foundation) and the soil on which it is built. In pile foundation design, SSI is an important consideration, as it can…

                    calendar

                    29 Aug 2024 07:18 AM IST

                      Read more

                      Project 1

                      Objective:

                      1. Mention the need for a metro rail in a developing economy. Ans:-A metro rail system can play a crucial role in the development of an economy, particularly in a developing country. Here are several key reasons why a metro rail system is often needed in such an economy:Efficient and Reliable Transportation: A metro…

                      calendar

                      01 Sep 2024 11:39 AM IST

                        Read more

                        Challenge 12

                        Objective:

                        1.Describe the DL & SIDL considerations for an open foundation.Soln :DL (Dead Load) and SIDL (Superimposed Dead Load) considerations are important aspects in the analysis and design of structures, including those with open foundations. Here's a description of these considerations in the context of an open foundation:Dead…

                        calendar

                        01 Sep 2024 11:40 AM IST

                        Read more

                        Identification of Cracks

                        Objective:

                        Identification of Cracks 1) What is the mode of failure or damage of the beams in the figure above? Would you characterize the case as damage or as a failure? Are the damages repairable? Elaborate.a)             This crack will be formed due to the flexural failure of a beam.…

                        calendar

                        01 Sep 2024 01:35 PM IST

                          Read more

                          Structural dynamics

                          Objective:

                          1.Differentiate Static analysis and Dynamic analysis with proper representing pictures Answer:Static analysis:Static analysis and dynamic analysis are two distinct approaches used in software testing and security to evaluate the quality and security of a software system.Static analysis refers to the evaluation of…

                          calendar

                          01 Sep 2024 01:41 PM IST

                            Read more

                            Understanding the concepts on Degrees of Freedom

                            Objective:

                            UNDERSTANDING THE CONCEPT OF DEGREE OF FREEDOM :   QUESTION : 1A five storey structure with 5 translational DOF is shown here. Each storey has mass ‘m’. The eigenvalue problem has been solved and the 5 periods of vibration Tn and their corresponding mode shapes, φn has been derived.The fundamental…

                            calendar

                            01 Sep 2024 01:59 PM IST

                              Read more

                              Concept on positioning of Columns

                              Objective:

                              Question 1:Comment on the layout of the framing plan concerning earthquake resistance in the two horizontal directions X or Y (dots are columns, lines depict beams). Look into aspects of symmetry, redundancy and bi-directional stiffness and ductility.Ans:Symmertry:It is observed that the distribution of mass,stiffness…

                              calendar

                              01 Sep 2024 02:02 PM IST

                                Read more

                                Conceptual design of a building with columns and shear walls

                                Objective:

                                Question 1:The building shown, 20 × 35 m in plan, has columns on a 5 × 5 m grid and shear walls (with dimensions shown in m, 250 mm in thickness) in three alternative arrangements, (a), (b), (c), all with the same total cross-sectional area of the shear walls. Compare the three alternatives, taking into account the restraint…

                                calendar

                                01 Sep 2024 02:05 PM IST

                                  Read more

                                  Project 2

                                  Objective:

                                  Prepare a model of 3 x 25m prestressed I-girder superstructure for metro viaduct in STAAD by creating the nodes, beams, and supports along with necessary loads. Staad ModelDead Load reaction,Maximum Y = 490.687 kN  ,    Minimum Y = 434.655, Y= 51 T, Rotation = 0.004 radSIDL reaction,Maximum…

                                  calendar

                                  09 Sep 2024 01:45 PM IST

                                    Read more

                                    Project 1

                                    Objective:

                                    1)     Portal beam having length of 4m and cross section of 300mm x 600mm (depth) and portal columns have height of 3m and cross section 300mm x 300mm. – Both end support HingedOpen Staad file.Create nodesCreate beams in between the nodes.Select and Assign the Model Material as concrete.Create and assign…

                                    calendar

                                    25 Sep 2024 07:56 AM IST

                                    Read more

                                    Week 1 Challenge

                                    Objective:

                                    1.What are different type of foundation in bridges and how selection of type is made?Ans:- The different types of foundation in bridges is generally as follows:Shallow foundationDeep foundationShallow Foundations:-A shallow foundation is a type of foundation that transfers building loads to the earth very near the…

                                    calendar

                                    14 Oct 2024 12:24 PM IST

                                      Read more

                                      Week 2 Challenge

                                      Objective:

                                      Q 1 - Define all loads to be applied in the abutment of the bridge as per IRC 6 and mention the clauses. and check overturning and sliding of 4 m height of Abutment (from ground level) , embedded 2 m in ground.Use coefficient of friction =0.5.Soil density =18 kn/m3.Design the section of stem, heel and toe.…

                                      calendar

                                      14 Oct 2024 12:27 PM IST

                                      Read more

                                      Week 3 Challenge

                                      Objective:

                                      Aim:1a. How hydrology and geotechnical studies (preliminary and detail studies, zone of influence) are used in fixing span as per IRC standards and type of bridge. Mention the clauses applicable for the same.Determine the scour depth at the pier and abutment location having silt factor =3Design discharge = 1000 cumecsLinear…

                                      calendar

                                      14 Oct 2024 12:29 PM IST

                                        Read more

                                        Week 4 Challenge

                                        Objective:

                                        1).Design of Foundation of Abutment  (as per IRC 6-2017 loads. optimize the design as per IRC: 112-2011):- Here's a brief introduction to the design of abutment foundations:An abutment foundation is a critical structural element used to support and distribute the loads from bridge abutments to the ground.…

                                        calendar

                                        14 Oct 2024 01:09 PM IST

                                          Read more

                                          Week 5 Challenge

                                          Objective:

                                          Aim:- Calculate loads manually acting on pier foundation and design as per IRC 6,78 and 112, difference between free and fix pier and how it impacts the foundation size Also add the calculation of loading in both the cases AndDetailing of the foundation reinforcement And List all RCC design checks to be done…

                                          calendar

                                          15 Oct 2024 10:12 AM IST

                                            Read more

                                            Week 6 Challenge

                                            Objective:

                                            . 1. Summarize your study for the bending moment, shear force and deflection diagrams for the raft foundation in stadd and compare them with manual calculation for different set of loads. Fill of 1 m on top slab.1) earth pressure 2) self-weight 3) Surcharge 4) 70R loadAnsAim of the challenge -To Analyze and design the…

                                            calendar

                                            15 Oct 2024 10:29 AM IST

                                              Read more

                                              Project 1

                                              Objective:

                                              Aim:- Analysis & Design raft foundation of a box culvert bridge having 12 M span and 5.5 M height in STAAD pro and applying loads as per IRC 6.Que 1) Calculate the loads to be applied on the box as per IRC 6.Given Data:- The span of structure = 12 MHeight of structure = 5.5 MSafe bearing capacity…

                                              calendar

                                              15 Oct 2024 10:44 AM IST

                                                Read more

                                                Week 7 Challenge

                                                Objective:

                                                Aim:- How to fix no. of piles in the deep foundations in a flyover in  Delhi, listing all the loads acting on it and making all the combinations as per IRC 6.What are the different factors that can impact the number of piles and it,s depth?how it is different in wall type abutment.and pier (free and fixed) Que…

                                                calendar

                                                15 Oct 2024 10:54 AM IST

                                                  Read more

                                                  Week 8 Challenge

                                                  Objective:

                                                  Aim and Introduction :-The aim of this challenge is to determine/calculate the loads on the foundation for abutment from the givent GAD. The forces on the structure due to DL,SIDL,LL,Earth load is need to be detemined. So first of all for calculating the DL the cross section is to be created in AUTOcad for determining…

                                                  calendar

                                                  17 Oct 2024 04:01 AM IST

                                                    Read more

                                                    Week 9 Challenge

                                                    Objective:

                                                    Aim and Introduction :-The aim of this challenge is to determine/calculate the scouring depth and fixing the span arrangement for the requirement of clear linear waterways.To propose the foundation of abutment and pier lform the given data.To calculate the forces on the foundation as per IRC-6. So first of all…

                                                    calendar

                                                    17 Oct 2024 04:04 AM IST

                                                    Read more

                                                    Week 10 Challenge

                                                    Objective:

                                                    Aim :- Que ) What all checks need to be followed in the design of well foundation regarding the stability and the design. List out all the necessary clauses from IRC codes applicable.Answer -Following are the steps which is considered for designing of well foundation regarding the stability and the design as…

                                                    calendar

                                                    17 Oct 2024 07:16 AM IST

                                                    Read more

                                                    Week 11 Challenge

                                                    Objective:

                                                    Aim:- Design the pile foundation in the abutment bridge. considering the 28-meter span. Vertical capacity-250 tonne horizontal capacity - 40 tonnes.With abutment having backfillWith abutment having RE wall.Also List different components of pile foundation and calculate steel quantity in pile. Design of pile cap. Solution:- Given…

                                                    calendar

                                                    17 Oct 2024 09:49 AM IST

                                                      Read more

                                                      Week 12 Challenge

                                                      Objective:

                                                      Aim and Introduction:-The aim of this Project is to determine the types of loads and forces acting on the pier structure and to design with determining the detail reinforcement drawing for the pier structure by considering two conditions with various loading criteria.So first of all the details components, levels with…

                                                      calendar

                                                      18 Oct 2024 05:27 PM IST

                                                        Read more

                                                        Project 2

                                                        Objective:

                                                        AimTo design pile foundation of a RCC slab bridge having dimensions “15” m span and “5” m height at abutment and width = 12 meters and having vertical capacity as 300 tonnes and horizontal capacity as 40 tonnes per pile. Also, to design the pile cap and its reinforcement.Size also to be fixed as per design. M35…

                                                        calendar

                                                        18 Oct 2024 06:25 PM IST

                                                        Read more

                                                        Modelling of 25 storey building with the specified properties using ETABS

                                                        Objective:

                                                        Ans:-Aim:To Model a 25 storey building on ETABS 2019 with structural properties as specified below. Ground floor or plinth floor level can be taken at a height of 1.5 metres from the base. Each of the successive 25 storeys has a storey height of 3 metres. Introduction: ETABS is an engineering software product…

                                                        calendar

                                                        25 Oct 2024 12:58 PM IST

                                                        Read more

                                                        To Analysis and Design of Steel Structures using TSD

                                                        Objective:

                                                        1.Summarize your study for the bending moment, shear force, and deflection diagrams for the elements of the modelAIM To analyse the structure and summarize study for bending moment, shear force, and deflection diagrams for the elements of the model and also display these parameters for our model.PROCEDURETo open the…

                                                        calendar

                                                        27 Oct 2024 10:10 AM IST

                                                          Read more

                                                          To calculate the dead , live and wind load for RC residential structure and to apply them using TSD

                                                          Objective:

                                                          1. Calculate dead load in design report based on IS code and apply dead load on the modelFinishes of 50mmSlab thickness as per the designBrick wall loadRoofing loadAim - To calculate dead load in design based on IS Code and apply on model.Tools Used - Load Cases, Full Udl , Area Load, Property Window.Calculation -Slab…

                                                          calendar

                                                          27 Oct 2024 10:53 AM IST

                                                            Read more

                                                            To Generate seismic loading based on IS code and to run the analysis using TSD

                                                            Objective:

                                                            Generate seismic loading based IS codal provisions and zone II. Any other data you can assume and input accordinglyAIM:- To generate seismic loading based IS codal provisions and zone II. Any other data you can assume and input accordinglyINTRODUCTION:- Seismic load are the earthquake load on the structure which…

                                                            calendar

                                                            27 Oct 2024 10:55 AM IST

                                                              Read more

                                                              To Design RC column and beam for RC residential structure using TSD

                                                              Objective:

                                                              1.) Based on the analysis design RC column and beam.AIM :   To Based on the analysis design RC column and beam. INTRODUCTION : An ordinary reinforced concrete beam or the column itself is an inhomogeneous section composed of concrete and reinforcement, whose behavior is totally different.A reinforced…

                                                              calendar

                                                              27 Oct 2024 11:13 AM IST

                                                              Read more

                                                              To Design slab and foundation for an RC residential building using TSD

                                                              Objective:

                                                              Aim:To design the slab and foundation of the model.To outline the thought process for designing of the elements (column, beam, slab and foundations)Procedure:Open the RCC TSD file.Slab design:Go to G.L, uncheck all members other than slab itemsClick a slab and check its property like reinforcement, bar diameter and spacing…

                                                              calendar

                                                              27 Oct 2024 11:15 AM IST

                                                                Read more

                                                                To Generate report for Steel Industrial and RC structures using TSD

                                                                Objective:

                                                                Generate report for the steel building design from challenges 1 – 6 along with the loading summaryAim: To generate report for the steel building design.Procedure:Open the saved Tekla modelNow go to the report option from the Ribbon and select model report.Now select the load cases and combinations summary to obtain…

                                                                calendar

                                                                27 Oct 2024 11:17 AM IST

                                                                  Read more

                                                                  Project 2_Analyze and Design the RC office building as per IS standard code in TEKLA STRUCTURAL DESIGNER

                                                                  Objective:

                                                                  Develop general arrangement for the RC office building. Analyze and design the building as per IS standard code in TEKLA STRUCTURAL DESIGNER. Refer the attached plan and elevation. The building to be designed for dead, live, wind and seismic loading.Report of each member to be generated and extract drawings for structural…

                                                                  calendar

                                                                  27 Oct 2024 11:20 AM IST

                                                                  Read more

                                                                  Project 1_Analyze and design a steel building to 10T CRANE as per IS standard code using TEKLA STRUCTURAL DESIGNER.

                                                                  Objective:

                                                                  PROJECT 1AIM:The aim of this project is to, Analyze and design a steel building to 10T CRANE as per IS standard code in TEKLA STRUCTURAL DESIGNER. Refer the attached plan and elevation. Provide bracings and moment connection for lateral stability.  Consider dead, live, equipment and wind loading. Consider the brick…

                                                                  calendar

                                                                  27 Oct 2024 11:30 AM IST

                                                                  Read more

                                                                  Reinforcement Detailing of Beams from ETABS output

                                                                  Objective:

                                                                  Challenge 7 – Detailed design of concrete buildings -1Detail design of beams in Etabs 2018.The ETABS file for a G+4 building is provided. Run the analysis and design the RCC Moment Resisting Frame. The following challenge deals specifically with two continuous beams on the 1st floor.       …

                                                                  calendar

                                                                  28 Oct 2024 12:57 PM IST

                                                                  Read more

                                                                  Reinforcement detailing of Columns from ETABS output

                                                                  Objective:

                                                                  Reinforcement detailing of columns in Etabs 2018.The ETABS file for a G+4 building is provided. Run the analysis and design the RCC Moment Resisting Frame. The following challenge deals specifically with two columns at the following grid intersections.3A3BProvide details of longitudinal reinforcement for the two columns,…

                                                                  calendar

                                                                  30 Oct 2024 04:13 AM IST

                                                                  Read more

                                                                  Analysis & Design of RCC shear walls in the model using ETABS

                                                                  Objective:

                                                                  OUESTION:The etabs file for a G+6 building is provided. Run the analysis and design the RCC shear walls (show in the etabs model). The following challenge deals specifically with the shear wall of size 300x1500 at grid A-11 in the structural model.Extract values of longitudinal steel ratio, boundary…

                                                                  calendar

                                                                  30 Oct 2024 04:15 AM IST

                                                                  Read more

                                                                  Structural Modelling using Etabs 2018

                                                                  Objective:

                                                                  AnswerAim:To model an apartment with all seismic consideration, based on given architectural input and to know how to check the seismic performance of an apartment using ETABSIntroduction:To model and analyse the G+7 residential building with the given architectural drawing using ETABSData required for Etabs analysis:Pinned…

                                                                  calendar

                                                                  30 Oct 2024 04:18 AM IST

                                                                  Read more

                                                                  Design of Shallow Foundation (Isolated Footings)

                                                                  Objective:

                                                                   Q.1 Design of Foundation in STAAD Foundation.(i) AIM:  Using STAAD Foundation designing Isolated FootingGiven :- Column = 300 mm x 450 mm.Axial load = 1500 kNMu = 150 kNm.Assume that the moment is reversible.The safe bearing capacity of the soil = 200 KN/m^2.Depth = 1 m from ground level.M…

                                                                  calendar

                                                                  30 Oct 2024 10:47 AM IST

                                                                    Read more

                                                                    Foundation Design using SAFE

                                                                    Objective:

                                                                    1.Model the isolated footing provided in week 11 challenge on SAFE. Analyze and design it to verify the size, depth and steel provided as per calculations.AIM:-  To model the isolated footing by using  SAFE and to analyze and to design it to verify the size, depth and calculation of steel providedINTRODUCTION:-…

                                                                    calendar

                                                                    30 Oct 2024 10:52 AM IST

                                                                    Read more

                                                                    Project 2_Design & Analysis of a Hostel building at Guwahati, Assam

                                                                    Objective:

                                                                    In this project, participants will get to experience the entire design process from modelling, analysis, design, and preparation of construction drawings. The architectural drawings of a G+3 RCC building is provided. The following information on the building is to be used:Location – Guwahati, AssamFunction – Hostel block…

                                                                    calendar

                                                                    30 Oct 2024 10:55 AM IST

                                                                      Read more

                                                                      Project 1_Comparative study of different storey buildings for Seismic forces

                                                                      Objective:

                                                                      1. Factors influencing the Natural Period of a building:Effect of stiffness on T: Compare fundamental natural periods of buildings E & F as well as G & H. Why is there a marginal or significant difference in the fundamental natural periods?  Increase in the column size increases both stiffness and mass…

                                                                      calendar

                                                                      01 Nov 2024 06:23 PM IST

                                                                      Read more
                                                                      Showing 1 of 57 projects

                                                                      4 Course Certificates

                                                                      certificate

                                                                      Design of Elevated Metro Viaducts using STAAD.Pro

                                                                      CertificateIcon
                                                                      Certificate UID: x7hr1byga8sldnev
                                                                      View Certificate
                                                                      certificate

                                                                      Design of Bridge Foundations using STAAD.Pro

                                                                      CertificateIcon
                                                                      Certificate UID: phbrw6x219q074y8
                                                                      View Certificate
                                                                      certificate

                                                                      Analysis and Design of RCC & Steel Structures using Tekla Structural Designer

                                                                      CertificateIcon
                                                                      Certificate UID: mnk8fy5iqtp7eosv
                                                                      View Certificate
                                                                      certificate

                                                                      Analysis and Design of High Rise Buildings using ETABS and Foundation Design using SAFE for Seismic Loads

                                                                      CertificateIcon
                                                                      Certificate UID: 8i1vdrkzn3fmwjxo
                                                                      View Certificate
                                                                      Showing 1 of 4 certificates

                                                                      Academic Qualification

                                                                      B.E

                                                                      GOA COLLEGE OF ENGINEERING

                                                                      01 Aug 1994 - 01 Jun 1997

                                                                      12th

                                                                      GOVERNMENT POLYTECHNIC PANAJI

                                                                      01 Jun 1990 - 01 Aug 1993

                                                                      10th

                                                                      ST BRITTO HIGH SCHOOL MAPUSA GOA -403507

                                                                      06 Jun 1980 - 15 Apr 1990

                                                                      Schedule a counselling session

                                                                      Please enter your name
                                                                      Please enter a valid email
                                                                      Please enter a valid number

                                                                      Here are the courses that I have enrolled

                                                                      coursecard
                                                                      4.8

                                                                      19 Hours of Content

                                                                      coursecard
                                                                      4.4

                                                                      18 Hours of Content

                                                                      coursecard
                                                                      5

                                                                      24 Hours of Content

                                                                      coursecard
                                                                      Recently launched

                                                                      21 Hours of Content

                                                                      Similar Profiles

                                                                      Apoorv Ranjan
                                                                      Apoorv Ranjan

                                                                      Ladder of success cannot be climbed with hands in pocket.

                                                                      Pruthvi Jagadeesh GK
                                                                      Pruthvi Jagadeesh GK

                                                                      The Future in Motion

                                                                      Krantiveer .
                                                                      Krantiveer .

                                                                      Give more than what you get you will get more than what you gave