Black FridayUpgrade your career this Black Friday. Get up to ₹60,000 Scholarship on IIT programsUp to ₹60K Black Friday Scholarship52 seats leftOffer ends Fri, 27 Nov, 11:59 pm IST.

Black Friday Scholarship – IIT Jammu & IIT Roorkee

The best Black Friday deal isn't a gadget. It's your next career move.

Get up to ₹60,000 Black Friday Scholarship on our PG programs with IIT Jammu and iHUB DivyaSampark, IIT Roorkee. IIT certification, 12 live sessions with IIT faculty and 100% placement assistance.

Only 52 seats left. Offer ends Fri, 27 Nov, 11:59 pm IST

3,905 engineers placed since 2019 · 1,276 hiring companies

By submitting you agree to our Terms and Privacy Policy.

Your free demo class is requested

Browse courses

Bridge Design in Civil Engineering: IRC Loads, Types and a Worked Example

How bridges are designed in India, step by step: the site data you need, which bridge type suits which site, the IRC:6-2017 loads (Class A, 70R, footway), and a fully worked 24 m foot over bridge girder checked for strength, deflection and footfall vibration.

Bridge Design in Civil Engineering: IRC Loads, Types and a Worked Example

Bridge design in civil engineering is the work of choosing a structural form for a crossing, working out the loads it must carry from the governing code, sizing every member for strength, and then checking deflection, vibration, durability and the construction stages. In India, road bridge loads come from IRC:6-2017, and members are designed to IRC:112 (concrete), IRC:24 (steel) or IRC:22 (composite). This guide walks through that process and sizes one footbridge girder with real numbers.

Key numbers

  • IRC:6-2017 (Seventh Revision, with amendments) sets a live load of 500 kg/m² (about 4.9 kN/m²) for foot over bridges and 400 kg/m² for footways on road bridges (clause 206.1).
  • IRC:24-2010 limits a steel girder's live-load deflection to span/800 and its total deflection to span/600, unless the girder is precambered (clause 504.5.1).
  • IRC:6 asks for a dynamic check on long-span foot over bridges below 5 Hz vertical or 1.5 Hz horizontal frequency (clause 208.9). People walk at roughly 1.6-2.4 steps per second.
  • Worked example below: a 24 m steel footbridge girder needs only 83% of its bending strength, but its first vertical frequency is 3.55 Hz, so vibration, not strength, sets the next round of design.
  • The Chenab Rail Bridge, opened on 6 June 2025, is a 1,315 m steel arch standing 359 m above the riverbed (PIB).

This guide is for civil engineering students and fresh graduates who want to understand how a bridge is actually designed, not just the list of bridge types. It replaces our April 2023 version of this page; the site-information checklist from that version is kept and expanded below. Every worked number was computed by a script, and the example is a teaching sketch, not a design you can build from.

What does a bridge designer actually do, step by step?

A bridge designer turns a crossing problem into drawings a contractor can build. The work runs from site data, to choosing the structural form and span arrangement, to code loads, analysis, member design, serviceability checks, substructure and foundations, and finally drawings that go for approval and proof checking. Each step feeds the next, and early choices fix most of the cost.

  1. Collect site data. Survey, soil borings, flood levels, traffic and clearances (the full list is in the next section).
  2. Choose the form and spans. Beam, box girder, truss, arch, cable-stayed or suspension, and how many spans. This becomes the general arrangement drawing (GAD).
  3. Work out the loads. Dead load, surfacing, vehicle or pedestrian live load, impact, wind, temperature, braking, water current and earthquake, combined with the partial safety factors in IRC:6.
  4. Analyse. Hand calculations first, then a grillage or finite element model in software such as STAAD.Pro, MIDAS Civil or LUSAS to get moments, shears and reactions.
  5. Design the superstructure. Size girders, deck slab, cross-girders and connections for the ultimate limit state (ULS), the "does it break" check.
  6. Check serviceability. The serviceability limit state (SLS) asks whether it behaves well in use: deflection, cracking, vibration and fatigue.
  7. Design the substructure. Bearings, piers, abutments and foundations (piles or wells), usually to IRC:78.
  8. Check construction stages. A girder carrying wet concrete before the deck hardens is often more critical than the finished bridge.
  9. Draw, review and proof-check. Detailed drawings, design basis report and calculations go to the client and an independent proof consultant.

What information do you need before you start a bridge design?

Before sketching a single span, you need the site map and alignment, a longitudinal ground section, the required deck width, soil and geology data, flood and climate data, access for construction, and the setting the bridge sits in. Foundation conditions in particular decide the economical span length and often the structural form itself.

  • Site map and alignment: every obstacle to be crossed (river, road, railway, valley) with contours and the planned alignment of the new route.
  • Longitudinal section along the bridge axis: ground levels, required clearances below the deck, flood widths and the vertical profile of the new road or track.
  • Cross-section needs: number and width of lanes, median, footways, crash barriers and railings.
  • Geotechnical data: bore logs, soil and rock properties and a geological report. How hard the foundations are to build drives the span length.
  • Hydrology for river and sea crossings: high flood level, scour depth, tidal range and navigation clearance.
  • Climate: temperature range, wind and the seismic zone of the site.
  • Construction access: whether long girders, cranes and launching equipment can actually reach the site.
  • Setting and aesthetics: an urban footbridge is seen at close range every day and needs more care in form than a culvert in open country.

Which type of bridge suits which site?

The right bridge type depends on span, loads, foundations and construction access. Beam and box girders cover most short and medium spans. Trusses carry heavy rail loads efficiently. Arches need strong ground at both ends. Cable-stayed and suspension bridges reach the longest spans. Span ranges overlap widely, so several types usually work for any one site.

TypeHow it carries loadWhere it makes senseIndian example
Slab and girder (beam)Bending in the deck and girdersCulverts, flyovers, foot over bridges, short to medium spansMost urban flyovers and FOBs
Box girderBending and torsion in a closed hollow sectionLong viaducts, metro lines, curved decks, sea linksAtal Setu, Mumbai: 21.8 km, 16.5 km over sea; first orthotropic steel deck in India
TrussAxial tension and compression in triangulated membersHeavy rail loads, long spans where deep girders are impracticalCommon on long rail spans
ArchMainly compression, pushed into the abutmentsDeep valleys and gorges with rock at both endsChenab Rail Bridge: 1,315 m long, 359 m above riverbed
Cable-stayedCables run straight from a pylon to the deckLong spans where intermediate piers are difficultAnji Khad: India's first cable-stayed rail bridge, 725 m long, 193 m pylon, 96 cables
Movable (vertical lift)A span that rises to let ships passLow rail or road crossings over navigable waterNew Pamban Bridge: 2.07 km, 72.5 m span lifts 17 m
SuspensionDeck hangs from main cables in tensionThe longest spans in the worldNot covered here

The US Federal Highway Administration's Steel Bridge Design Handbook makes the same point: each type suits a span range, but the ranges overlap so much that several types are usually viable. The final choice comes from cost, construction method, maintenance and appearance, not from a lookup table.

Which IRC codes do bridge engineers in India use?

Indian road bridges are designed to the Indian Roads Congress (IRC) Section codes: IRC:5 for general features, IRC:6 for loads and load combinations, IRC:112 for concrete, IRC:24 for steel, IRC:22 for steel-concrete composite and IRC:78 for foundations and substructure.

  • IRC:6-2017 (Section II, Loads and Load Combinations, Seventh Revision). The reprint we used incorporates amendments up to October 2019; check the IRC website for any amendment issued after that before you use a clause in design.
  • IRC:112-2020 for concrete road bridges (limit state method). It gives, for example, a secant modulus of 31 GPa for M30 concrete (Table 6.5).
  • IRC:24-2010 (Third Revision) for steel road bridges, limit state method.
  • IRC:22 for composite construction and IRC:78 for foundations and substructure, both referenced from IRC:6.

What live loads does IRC:6 specify for bridges?

IRC:6-2017 defines standard vehicle loads: Class 70R and Class A for permanent road bridges, Class AA inside certain municipal and industrial areas, Class B for timber bridges, and a Special Vehicle (SV) load for heavy-haul corridors. Footways and foot over bridges get a separate pressure load. Engineers check every applicable class and design for the worst effect.

  • Class A is a train of vehicles. Its heaviest axles carry 11.4 t, with 6.8 t and 2.7 t axles in the same train (Table 2 gives their tyre contact areas).
  • Class 70R has wheeled and tracked versions. Bridges designed for 70R must also be checked for Class A, because Class A can govern in some members.
  • Special Vehicle (SV) is a prime mover with a 20-axle hydraulic trailer, 385 t gross, used on corridors where turbines and stators are moved.
  • Impact: vehicle loads are increased for dynamic effects. For Class A on a steel bridge the impact fraction is , with the span in metres. No impact is added to footway loads.

For footways, clause 206.1 sets 400 kg/m², raised to 500 kg/m² where crowds are likely (towns with pilgrim centres or large seasonal fairs). A foot over bridge is designed for 500 kg/m². On road bridges, clause 206.3 lets the main girders use a smaller intensity as the span grows, because a long footway is unlikely to be packed end to end. For spans over 7.5 m and up to 30 m:

For spans over 30 m:

Here is 400 or 500 kg/m², the effective span in metres and the footway width in metres. For a 1.5 m footway with , a 20 m girder takes 344 kg/m² (3.38 kN/m²) and a 40 m girder takes 260 kg/m² (2.55 kN/m²). The reduction does not apply when crowd loading is being considered.

Footway live load versus span from IRC:6-2017 clause 206: 400 kg/m² (3.92 kN/m²) up to 7.5 m, 344 kg/m² at 20 m, 260 kg/m² at 40 m; foot over bridges use 500 kg/m² (4.9 kN/m²) at every span
Footway live load for main girders under IRC:6-2017 clause 206. Foot over bridges stay at 500 kg/m² at every span. Drawn from the code formulas by our script.

Worked example: how do you size a 24 m foot over bridge girder?

Take a 24 m simply supported steel foot over bridge (FOB) with a 3.0 m walkway. Two welded plate girders carry a 150 mm reinforced concrete deck and a 40 mm asphalt wearing course. Each girder takes half the deck. Steel is E250 (yield strength = 250 MPa), the slab is M30, and unit weights come from IRC:6 Table 1: 2.5 t/m³ for reinforced concrete, 2.2 t/m³ for asphalt and 7.8 t/m³ for steel.

Step 1: Loads on one girder

LoadWorkingkN/m
Deck slab0.15 m × 24.5 kN/m³ × 1.7 m strip6.25
Girder self-weight + 15% for stiffeners and bracing27,600 mm² × 76.5 kN/m³ × 1.152.43
Railing (assumed)one side per girder0.50
Dead load, DL9.18
Surfacing0.04 m × 21.6 kN/m³ × 1.5 m1.30
Pedestrian live load, LL4.905 kN/m² × 1.5 m7.36

Step 2: Ultimate design load, moment and shear

IRC:6 Table B.2 (basic combination) uses 1.35 on dead load, 1.75 on surfacing and 1.5 on the leading live load:

Step 3: Strength of the plate girder

Try flanges 300 × 25 mm and a web 900 × 14 mm (overall depth 950 mm). The flange outstand ratio is 5.72, under the 8.4 limit for a plastic welded flange, and the web ratio is 64.3, under 67, so IRC:24 does not require a shear buckling check. With a plastic section modulus mm³ and :

This assumes the hardened slab restrains the top flange against lateral torsional buckling. The steel section alone is checked for the full load, which is conservative.

Worked example: 24 m girder under 25.7 kN/m factored load, maximum shear 308 kN, maximum moment 1850 kN·m; 950 mm deep E250 plate girder with 300 × 25 flanges and 900 × 14 web, Md 2221 kN·m, utilisation 0.83
Shear force and bending moment for the 24 m FOB girder, with the trial plate girder section. Computed by our script from IRC:6 and IRC:24.

Step 4: Deflection

IRC:24 clause 504.5.1 limits live-load deflection to = 30 mm and total deflection to = 40 mm, using unfactored loads. With steel alone ( mm⁴), the live-load deflection is 39.1 mm, which fails.

Welding shear studs so the slab acts with the girder changes that. Using a modular ratio of 200/31 = 6.45, the composite second moment of area is mm⁴, 2.23 times stiffer, and live-load deflection drops to 17.6 mm. Total deflection is still 42.6 mm, over 40 mm, so the girder is precambered (built with an upward curve). With precamber that covers dead and superimposed dead load, the clause waives the total limit. If the girders are erected unpropped, the steel alone carries the wet slab and deflects about 49 mm; adding 3 mm for the surfacing on the composite section gives a precamber of about 52 mm.

Step 5: Vibration

The first vertical natural frequency of a simply supported beam is:

With a permanent mass of 1,068 kg/m per girder, the steel girder alone gives = 2.38 Hz, right next to normal walking pace. The composite girder gives 3.55 Hz empty and 3.39 Hz with a dense crowd of 70 kg/m² on the deck. The French Sétra footbridge guide classes 2.6-5 Hz as a low resonance risk under normal use. That is still under the 5 Hz trigger in IRC:6 clause 208.9, so the next step is a dynamic analysis that estimates deck acceleration under pedestrian loading and compares it with comfort limits.

Girder depth versus vertical frequency and live-load deflection for a 24 m footbridge: the 950 mm girder has 2.38 Hz and 39 mm steel-only, 3.55 Hz and 17.6 mm composite; the 30 mm L/800 limit and 5 Hz IRC:6 trigger are marked
Deeper or composite girders raise the natural frequency and cut deflection. Shaded bands are the Sétra vertical resonance-risk ranges. Computed by our script.

What this example leaves out

A real FOB design also checks the girder during concreting, when the top flange has no slab restraint and needs cross-bracing. It also covers shear connector design, wind (IRC:6 sets at least 1.5 kN/m² in urban areas and 2 kN/m² in plain terrain for FOBs), seismic forces, fatigue at welds, bearings, staircases and lift towers, and the piers and foundations. The lesson from the numbers is that a strength check alone would have accepted a girder that sags 39 mm under people and bounces at walking pace.

Why do footbridges need a vibration check?

People walk at about 1.6-2.4 steps per second, and the sideways sway of walking runs at about half that. If a footbridge's natural frequency falls in those ranges, footsteps can pump energy into it like a child on a swing. A footbridge can be strong enough and still move enough to frighten people off it.

London's Millennium Bridge is the classic case. It opened on 10 June 2000 and closed within days after thousands of walkers set it swaying: as people stepped to steady themselves, they made the sway worse. It reopened in February 2002, after dampers that work like a car's shock absorbers were fitted. IRC:6 now asks for a dynamic check on long-span FOBs below 5 Hz vertical or 1.5 Hz horizontal. You can try the frequency formula on your own beam with our beam natural frequency calculator.

Which software do bridge engineers use?

Common bridge packages include STAAD.Pro, MIDAS Civil, CSiBridge and LUSAS for analysis, Autodesk Structural Bridge Design for code checks, and Tekla for steel detailing. Hand calculations still come first: they give the numbers you check the software against, and an interviewer will ask for them.

Detailing matters on big projects too: PIB's note on the Chenab bridge says Tekla was used for its structural detailing. If you are choosing your first package, our guide to what STAAD.Pro is used for in civil engineering is a good start.

What skills does a bridge design engineer need, and what do they earn?

A bridge design engineer needs structural analysis and mechanics, the IRC codes, concrete, steel and prestressed design, one or two analysis packages, drawing-reading and detailing, and the habit of checking software output by hand. Communication matters too: designs are reviewed by clients and proof consultants, and every assumption must be defended in writing.

For pay, our own data is the most specific we can give. Based on 3,711 Skill-Lync placement records up to 7 Nov 2026 (data snapshot of 15 Nov 2026), learners placed as structural or civil engineers in the civil domain reported a median starting salary of ₹3.0 LPA (n = 94; middle half ₹2.04-3.81 LPA; top 10% above ₹7.1 LPA). Across all civil placements the median was ₹2.4 LPA (n = 367). This is a self-selected sample of Skill-Lync learners, mostly 2021-23 starting offers, and not bridge-specific. Treat it as a starting point; we will update it as new placements come in. See the civil engineer salary page for the full breakdown, and how structural engineering careers progress.

How can you learn bridge design?

Start with structural analysis and shear force and bending moment diagrams, then learn the IRC load cases, then design one simple bridge end to end in software and check it by hand. Skill-Lync's Post Graduate Program in Bridge Design and Analysis covers IRC loading, superstructure and substructure design in STAAD.Pro, Autodesk Structural Bridge Design and LUSAS. Shorter options include Design loads considered on bridges and Design of Bridge Substructures and Piers. You can also compare every Skill-Lync bridge design course or all structural design courses. Not sure where to begin? Talk to a Skill-Lync counsellor.

Frequently asked questions

Which IRC code gives the loads for bridge design?

IRC:6, "Standard Specifications and Code of Practice for Road Bridges, Section II: Loads and Load Combinations", gives the loads. This guide uses IRC:6-2017, the Seventh Revision. It covers dead load, vehicle classes (70R, A, AA, B and Special Vehicle), footway loads, impact, wind, seismic and temperature, and the partial safety factors used to combine them.

What live load is used for a foot over bridge in India?

IRC:6-2017 clause 206.1 sets 500 kg/m², about 4.9 kN/m², for foot over bridges. Footways on road bridges use 400 kg/m², raised to 500 kg/m² where crowds are likely. For road bridges, main girders may use a reduced intensity as the span increases (clause 206.3), unless crowd loading is being considered.

What is IRC Class 70R loading?

Class 70R is one of IRC:6's standard design vehicles, with wheeled and tracked versions. It is normally adopted for permanent bridges and culverts on all roads. A bridge designed for Class 70R must also be checked for Class A loading, because under some conditions Class A produces higher stresses in particular members.

What deflection limit applies to steel road bridges?

IRC:24-2010 clause 504.5.1 limits deflection from live load and impact to span/800, and total deflection from dead, live and impact loads to span/600. The total limit does not apply if the girder is precambered for dead and superimposed dead load. Cantilevers are limited to arm/300 total and arm/400 under live load.

Is bridge design a good career for civil engineers in India?

Yes, for engineers who enjoy structural analysis. Highways, metros, railways and sea links all need bridge designers and proof checkers. Entry pay is modest: Skill-Lync placement records (snapshot 15 Nov 2026) show a ₹3.0 LPA median for structural or civil engineer roles (n = 94). Code knowledge and software skills raise it with experience.

Sources and further reading

Want this on your résumé?

Talk to a counsellor.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.