PROJECT:- Usage of Navigation tool , Timeliner and Clash Detection test using Naviswork INTRODUCTION:- NAVISWORKS Used primarily in construction industries to complement 3D design packages (such as Autodesk Revit, AutoCAD, and MicroStation) Navisworks allows users to open and combine 3D models, navigate around them in…
Sachin Kumar
updated on 13 Oct 2022
PROJECT:- Usage of Navigation tool , Timeliner and Clash Detection test using Naviswork
INTRODUCTION:-
1) Use the Architecture/ Structure Project file developed by you in Week 6 to 8. Export the Revit architecture and structure model to Navisworks Cache file following the export settings discussed in class
AIM:-
To use the Architecture/ Structure Project file developed in Week 6 to 8. Export the Revit architecture and structure model to Navisworks Cache file following the export settings
INTRODUCTION:-
Export the Revit architectural and structural model to Navisworks cache file which has been created in week 6 to 8, and following the export settings
PROCEDURE:-
1. ARCHITECTURAL PROJECT FROM WEEK 7:
2. STRCTURAL PROJECT FROM WEEK 7:
RESULT:-
After following above steps, we have successfully exported architectural and structural model in Navisworks
2) Use Navigate Tool to walk around the model and walk through the rooms created and record your moving as animation in your Navisworks file
AIM:
Walk around the model and walk through the rooms, used Navigate tool and save the recording as administrator in Navisworks file
INTRODUCTION:
By using navigation tool to walk around the model, and walk through the room, recorded and saved the moving as administrator in Navisworks
PROCEDURE:-
1. LIVING ROOM WALK:-
2. BEDRROM 1 WALK:-
3. KITCHEN 1 WALK:-
4. TOILET 1 WALK:-
5. LOUNGE AREA:-
6. LIVING 2 WALK:-
7. KITCHEN 2 WALK:-
8. BEDROOM 2 WALK:-
RESULT :
we have Used Navigate Tool to walk around the model and walk through the rooms created and record moving as animation in Navisworks file
3) Use Navigate tool to use Realism feature to walk through the model and record your moving as animation in Navisworks file
AIM:
To use Navigate tool to use Realism feature to walk through the model and record your moving as animation in Navisworks file
INTRODUCTION:
Realistic views in Revit is a feature that enables a much more creative and easy way of visually communicating your design intent to stakeholders and collaborators.You can easily navigate through your BIM model natively in Revit and display your applied materials in real-time, without having to export outside of the environment.When we navigate a 3D model, you can use the realism tools on the Viewpoint tab > Navigate panel to control the speed and realism of your navigation
PROCEDURE:-
SOME OF THE VIEWS OF OUR PROJECT WITH REALISM (THIRD PERSON) ARE AS BELOW;
RESULT:-
walk through the model using realism is complete succesfully
4) Embed both architecture and structure *.nwc file to your Navisworks file. Create a clash detection test between the two models
a. Run the Clash Detection Test
b. Study the clashes between the two models
c. List which of the clashes could be approved
d. List which of the clashes could be neglected ( will be taken care later)
e. List which of the clashes can be resolved
f. Save the results after color coding the clashes to the Navisworks file
g. In case of resolution annotate the clash and save the view to defined views in Navisworks
AIM:
To use the timeliner feature in navisworks to prepare a schedule for the project developed in week 6 to week 8 by adding reasonable assumption for the taask start m date and date and simulate the task completion asa visual simulation
INTRODUCTION:
PROCEDURE:-
RESULT :
we have created a clash detection test between the two models.
5) Using the Timeliner feature in Navisworks prepare a schedule for the project developed in week 6 to 8 by adding reasonable assumptions for task start date and end date and simulate the task completion as a visual simulation. Record it and save the timeline simulation to Navisworks file
AIM:
To use the Timeliner feature in Navisworks prepare a schedule for the project developed in week 6 to 8 by adding reasonable assumptions for task start date and end date and simulate the task completion as a visual simulation. Record it and save the timeline simulation to Navisworks file
INTRODUCTION:
The TimeLiner tool adds schedule simulation to Autodesk Navisworks. TimeLiner imports schedules from a variety of sources. You can then connect tasks in the schedule with objects in the model to create a simulation. This allows you to see the effects of the schedule on the model, and compare planned dates against actual dates. Costs can also be assigned to tasks to track the cost of a project throughout its schedule. TimeLiner also allows the export of images and animations based on the results of the simulation. TimeLiner will automatically update the simulation if the model or schedule changes.
PROCEDURE:
RESULT:
Leave a comment
Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.
Other comments...
Project 2
1. Design a Warehouse Building located in Chennai using STAAD Pro Connect Edition. The specification must be as follows: Width 30m Length50m Eave Height 9m Bay spacing 6m Soil type Medium Safe Bearing Capacity 200 kN/m2 Roof slope 1 in 12 Assume suitable sections for structural elements. Follow IS800:2007, IS1893 and IS…
24 Jan 2023 01:20 PM IST
Project 1
1. Design a multi-storey Residential Building located in Bangalore using STAAD Pro Connect Edition. The specification must be as follows: Building floors G + 6 + R Plan dimension B = 25m , L = 16m Storey Height h = 3.5m Soil Hard soil Use Residential Purpose Safe Bearing Capacity 180…
16 Jan 2023 03:12 PM IST
Week 3 Challenge
1. 1. State the primary load cases to be considered for design. ANSWER: . Dead Load (IS-875: PART1) . Live Load (IS-875: PART2) . Wind Load (IS-875: PART3) . Snow Load (IS-875: PART4) . Seismic Load (IS 1893: 2016) 2. What is a One – Way slab? ANSWER: One way slab is the slab in which the ratio of its longer…
09 Jan 2023 02:29 PM IST
Week 2 Challenge
1. How will you assign Circular section to column? AIM:To assign Circular section to column INTRODUCTION: Columns are defined as vertical load-bearing members supporting axial compressive loads chiefly. This structural member is used to transmit the load of the structure to the foundation. In reinforced concrete buildings…