1) Use the Architecture/ Structure Project file developed by you in Week 6 to 8. Export the Revit architecture and structure model to Navisworks Cache file following the export settings discussed in class.
aim: Useing the Architecture/ Structure Project file developed by you in Week 6 to 8. Export the Revit architecture and structure model to Navisworks Cache file following the export settings discussed in class.
procedure:
Open the new architectural file and open 3D view
and open the file command and then select export and then select nwc
we can see The architectural file will be exported to the naviswork in nwc format
and Open the Structural file
open the file command and then select the export and then select nwc
Then we can see the structural file will be exported to the naviswork in nwc format.
Results:


2) Use Navigate Tool to walk around the model and walk through the rooms created and record your moving as animation in your Navisworks file
aim:Useing Navigate Tool to walk around the model and walk through the rooms created and record your moving as animation in your Navisworks file
procedure:
now Open the architectural file in naviswork which is exported .
select the viewpoint and select the view as views whole project was exported.
select the record option in viewpoint and select walk
next walk through the rooms, halls, bathroom etc select the stop button after walking
on right side animation will find in which amination we can record for the rooms and halls
Results:




3) Use Navigate tool to use Realism feature to walk through the model and record your moving as animation in Navisworks file
aim: Useing Navigate tool to use Realism feature to walk through the model and record your moving as animation in Navisworks file
Procedure.
now Open the architectural file in naviswork .
open the viewpoint and select the view as views are exported from revit as whole project was exported
open the realism and click on the third person and then select the record and select walk
and Start walking through the rooms and select the stop button on the top right
we can see animation will be created in project
Results:



4) Embed both architecture and structure *.nwc file to your Navisworks file. Create a clash detection test between the two models
a. Run the Clash Detection Test
b. Study the clashes between the two models
c. List which of the clashes could be approved
d. List which of the clashes could be neglected ( will be taken care later)
e. List which of the clashes can be resolved
f. Save the results after color coding the clashes to the Navisworks file
g. In case of resolution annotate the clash and save the view to defined views in Navisworks
ans:
aim: Embed both architecture and structure *.nwc file to your Navisworks file. Create a clash detection test between the two models
a. Run the Clash Detection Test
b. Study the clashes between the two models
c. List which of the clashes could be approved
d. List which of the clashes could be neglected ( will be taken care later)
e. List which of the clashes can be resolved
f. Save the results after color coding the clashes to the Navisworks file
g. In case of resolution annotate the clash and save the view to defined views in Navisworks
procedure:
Now Open the architectural file in the naviswork and select the append in the home button
next select the new test and rename the test if you want
select the architecture and structural file and select the surface of both the file
now select the run test
we can see that Clash detection test is completed
we can view clased items if present.
if present then List the clash which can be approved with the drop down menu in the status and select as approved
now List the clash as reviewed which can be taken care later and List the clash as resolved which clash has been resolved .
after making correction then save it with appropiate name
Results:







5) Using the Timeliner feature in Navisworks prepare a schedule for the project developed in week 6 to 8 by adding reasonable assumptions for task start date and end date and simulate the task completion as a visual simulation. Record it and save the timeline simulation to Navisworks file
aim:Using the Timeliner feature in Navisworks prepare a schedule for the project developed in week 6 to 8 by adding reasonable assumptions for task start date and end date and simulate the task completion as a visual simulation. Record it and save the timeline simulation to Navisworks file
procedure:
Now open the structural file in naviswork
open the home tab and select timelinear
and add the tasks and attach the tasks in it
then update the actual dates like start , finish date of project
select stimulate to play the recorded task
and save it.
Results: