Preparing Schedule & Cost Estimation for a building using REVIT
1.Ans
The shortcut keys for the given question is given below
- Using 3D model create a section box=BX
- To create similar doors and windows in a floor plan layout=CS
- To reduce the thickness of lines visible in plan views=TL
- To apply override settings to a floor in the model section view=VG
- To increase the range of visibility in a plan view=VR
- To select the previously selected items= CTRL+<
- To add annotations to the model views= DI
- To bring the model elements in line =AL
- To rotate the model elements=RO
- to move an object to another location=MV
- To copy a model element=CO
- To mirror an element about an axis =MM
- To create an array of model elements= AR
The above shortcut keys are explained with examples below.
- Using 3D model create a section box=BX


- To create similar doors and windows in a floor plan layout=CS


- To reduce the thickness of lines visible in plan views=TL


- To apply override settings to a floor in the model section view=VG



- To increase the range of visibility in a plan view=VR


- To select the previously selected items= CTRL+<

- To add annotations to the model views= DI



- To bring the model elements in line =AL


- To rotate the model elements=RO


- to move an object to another location=MV

- To copy a model element=CO

- To mirror an element about an axis =MM

- To create an array of model elements= AR

2.AIM
To prepare a schedule for the given elements using Revit.
INTRODUCTION
- A schedule is a tabular display of information, extracted from the properties of the elements in a project
- A schedule can list every Instance of the type of element you are scheduling, or it can collapse multiple instances onto a single row, based on the schedule grouping criteria.
- You can create a schedule at any point in the design process.
- As you make changes to the model that affect the schedule, it automatically updates to reflect those changes.
- You can add a schedule to a drawing sheet
- You can export a schedule to another software program, such as a spreadsheet program.
PROCEDURE
STEP-1
- First, we have to open the Revit project and go to the view tab
- After selecting the schedules option, the new tab will appear, as shown below.
- Next, we need to select the wall schedule and press ok, as shown below.
- Next the schedule properties tab will be displayed, as shown below.
- Next, we need to select the scheduled fields in order and click ok
- Next the door schedule tab will be displayed, as shown in the below figure.




STEP-2
- First, we have to open the Revit project and go to the view tab and select the schedules option
- After selecting the schedules option, the new tab will appear, as shown below.
- Next, we need to select the door schedule and press ok, as shown below.
- Next the schedule properties tab will be displayed, as shown below.
- Next, we need to select the scheduled fields in order and click ok
- Next the door schedule tab will be displayed, as shown in the below figure.






STEP-3
- First, we have to open the Revit project and go to the view tab and select the schedules option.
- After selecting the schedules option, the new tab will appears as shown below.
- Next, we need to select the window schedule and press ok, as shown below.
- Next the schedule properties tab will be displayed, as shown below
- Next, we need to select the scheduled fields in order and click ok
- Next the window schedule tab will be displayed, as shown in the below figure.






STEP-4
- First, we have to open the Revit project and go to the view tab and select the Material takeoff option.
- After selecting the Material takeoff option, the new tab will appear, as shown below.
- Next, we need to select the wall material and press ok, as shown below.
- Next the Material takeoff properties tab will be displayed as shown below.
- Next, we need to select the scheduled fields in order and click ok
- Next the Wall Material takeoff tab will be displayed, as shown in the below figure.





RESULT
The schedules for the walls, doors, windows and concrete materials have been created successfully.




3.AIM
To prepare a schedule report for area and volume of each room in the model.
INTRODUCTION
- A schedule is a tabular display of Information, extracted from the properties of the elements in a project.
- A schedule can list every Instance of the type of element you are scheduling, or it can collapse multiple instances into a single row, based on the schedule's grouping criteria.
- You can create a schedule at any point in the design process.
- As you make changes to the model that affect the schedule, it automatically updates to reflect those changes
- You can add a schedule to a drawing sheet.
- You can export a schedule to another software program, such as a spreadsheet program,
PROCEDURE
STEP-1
- First, we have to open the Revit project and go to the view tab and select the schedules option.
- After selecting the schedules option, the new tab will appears as shown below.
- Next, we need to select the Room schedule and press ok, as shown below.

STEP-2
- Next the schedule properties tab will be displayed, as shown below.
- Next, we need to select the scheduled fields in order and click ok

STEP-3
- Next the room schedule tab is opened and displayed as below.

RESULT
Prepared schedule shows the report of area and volume of each room in the model

4.AIM
To prepare total cost of materials using the unit cost rate for materials available in the internet.
INTRODUCTION
- Material takeoff schedules list the sub-components or materials of any Revit family.
- Material takeoff schedules have all the functionality and characteristics of other schedule views, but they allow you to show more detail about the assembly of a component.
- Any material that is placed in a component within Revit can be scheduled
PROCEDURE
STEP-1
- First, we have to open the Revit project and go to the view tab and select the Material takeoff option
- After selecting the Material takeoff option, the new tab will appear.
- Next, we need to select the door material and press ok.
- Next the Material takeoff properties tab will be displayed
- Next, we need to select the scheduled fields in order and click ok
- Next the Door Material tab will be displayed, as shown in the below figure



STEP-2
- First, we have to open the Revit project and go to the view tab and select the Material take off option. After selecting the Material take off option the new tab will appears
- Next, we need to select the Wall material and press ok.
- Next the Material take off properties tab will be displayed.
- Next, we need to select the scheduled fields in order and click ok
- Next the Wall Material tab will be displayed, as shown in the below figure.



STEP-3
- First, we have to open the Revit project and go to the view tab and select the Material take off option.
- After selecting the Material take off option the new tab will appears.
- Next, we need to select the Window material take off and press ok.
- Next the Material take off properties tab will be displayed
- Next, we need to select the scheduled fields in order and click ok
- Next the Window Material take off tab will be displayed, as shown in the below Figure

STEP-4
- First, we have to open the Revit project and go to the view tab and select the Material take off option.
- After selecting the Material take off option the new tab will appears
- Next, we need to select the Floor material and press ok.
- Next the Material take off properties tab will be displayed
- Next, we need to select the scheduled fields in order and click ok
- Next the Floor Material take off tab will be displayed, as shown in the below figure.


STEP-5
- First, we have to open the Revit project and go to the view tab and select the Material take off option.
- After selecting the Material take off option the new tab will appears.
- Next, we need to select the Furniture material and press ok.
- Next the Material take off properties tab will be displayed.
- Next, we need to select the scheduled fields in order and click ok
- Next the Furniture Material take off tab will be displayed, as shown in the below Figure


RESULT
The total cost of materials has ben prepared successfully using the unit cost rate for materials available in the internet.


5.Ans
- To decide framings for a structure using Dynamo

- If there is no water coming from the pipes

- If request for money from client has been declined for the project

6.Ans
a) WALL
- wall type
- wall thickness
- wall length
- wall description
- wall height
- wall location
- wall material
- material cost
- wall with
- wall volume

b) FLOOR
- floor type
- floor thickness
- floor length
- floor width
- floor area
- floor volume
- floor description
- floor material
- material cost

c) DOOR
- door type
- door width
- door height
- door material
- material cost

d) WINDOW
- window type
- window width
- window height
- window material
- material cost

e) TABLE
- Table type
- Table length
- Table width
- Table material
- Table weight
- Table cost

f) BUILDING
- Building type
- Building area
- Building parameter
- Building material
- Building volume
- Building height
- Building location