Project 1
1A 2 most Possiable Routes: Answer: The metro system will comprise two major routes, each serving different parts of the city. Extensive feasibility studies, environmental impact assessments, and stakeholder consultations have been conducted to finalize these routes. Route A: East-West Line Starting Point: City CenterEnding…
21 Jul 2023 04:45 PM IST
Project 1 - Developing the Schedule for the “Construction of Police Station Building”
All are Writing in word document.
18 Aug 2023 03:04 PM IST
Project 2 - Strategy, Planning and scheduling of the Techno Park at a major area
All are answer in word and Excel formates.
18 Aug 2023 02:58 PM IST
Project 1
All answer attached word and Excel files.
20 Sep 2023 05:16 PM IST
Project 2
All Answer in word Document and PDF Report attached Please Verfiy
24 Sep 2023 08:48 AM IST
Project 1
All are word in answer
23 Oct 2023 03:32 PM IST
Project 2
All are answer in excel Sheet
04 Dec 2023 07:40 AM IST
Project 1
Step1: Make the EPS as “Skill-Lync Education” and OBS and assign a Project Manager Enterprise Project Structure (EPS): Skill-Lync Education This is the top-level organizational structure under which various projects will be managed. Organizational Breakdown Structure (OBS): Assign a Project Manager to…
14 Dec 2023 11:14 AM IST
Project 2
First Ready For EPS, OBS, Calender Sheets. Step1: Select EPS Step2: Create a Project Name and Project ID Step3: Create a Calendar 24x6 Step4: Q1. Develop the project schedule as per the criteria above Step: Add a Activity name and Activity ID Q2. Use 3-Tier timescale with Year / Month / Weeks Step1: Step2: Q3. Define and…
22 Dec 2023 03:53 PM IST
Project 1
Q1) A) B) Q2) A) B) C) D) Q3)
03 Jan 2024 03:20 PM IST
Project - 2
Q1) Q2) Q3)
06 Jan 2024 07:58 PM IST
Project 1 - COVID-19 Vaccinations Trend Analysis
12 Jan 2024 06:03 PM IST
Project 2 - Supply and Demand Gap Analysis
Aim Introduction Problem statement Methodology Analysis Insights Recomendations Conclusions
13 Jan 2024 06:34 PM IST
Project 1 - Geometric Design Parameter- Prerequisites
When designing a highway, several elements must be considered to ensure safe and efficient traffic flow. Here's a checklist of some prerequisite elements and necessary considerations for road geometric design: Design Speed: The maximum safe speed that can be maintained over a specific section of highway under favorable…
02 Apr 2024 12:12 PM IST
Project 2 - Lane National Highway Roadway Design in Civil 3D
Q1) Creation of Surface1. Import Survey Data:Open AutoCAD Civil 3D.Go to the "Home" tab and click on "Create Ground Data". Select "Points" or "DEM File" as per your data source.Import the survey data points or DEM files.2. Create a Surface:In the "Home" tab, click on "Surface" and choose "Create Surface".Name…
22 May 2024 07:52 PM IST
Identification of Cracks
Question 1:a) Mode of Failure / Damage Type Image 1: Localized Spalling of Concrete Mode: This damage is a localized spalling of the beam corner, likely due to corrosion of embedded reinforcement. Cause: Moisture ingress leads to steel corrosion, causing expansion and cracking of the concrete cover. Repairable: Yes.…
08 May 2025 03:33 PM IST
Structural dynamics
1. Differentiate Static analysis and Dynamic analysis with proper representing picturesANSWER:STATIC ANALYSISStatic analysis can only be performed if the system being simulated does not depend on time, and if the loads being applied are constant.Static analysis don't consider inertia.Static refers to the force that has…
09 May 2025 04:54 AM IST
Understanding the concepts on Degrees of Freedom
Question 1:A five-storey structure with 5 translational DOF is shown here. Each storey has mass ‘m’. The eigenvalue problem has been solved and the 5 periods of vibration Tn and their corresponding mode shapes, φn, have been derived. The fundamental period of vibration (T1 = 2 seconds) and its associated mode shape:The…
09 May 2025 08:04 AM IST
Concept on positioning of Columns
Question 1:Comment on the layout of the framing plan concerning earthquake resistance in the two horizontal directions X or Y (dots are columns, lines depict beams). Look into aspects of symmetry, redundancy and bi-directional stiffness and ductility.Answer:1. Symmetry: The layout is generally symmetrical in both X and…
09 May 2025 12:19 PM IST
Conceptual design of a building with columns and shear walls
Question 1:The building shown, 20 × 35 m in plan, has columns on a 5 × 5 m grid and shear walls (with dimensions shown in m, 250 mm in thickness) in three alternative arrangements, (a), (b), (c), all with the same total cross-sectional area of the shear walls. Compare the three alternatives, taking into account the restraint…
11 May 2025 06:31 AM IST
11 Course Certificates
Excel Skills and Data Analysis for Construction Project Management
Effective Dashboards using Power BI for Construction Management
Post Graduate Program in Construction Project Management
Academic Qualification
B.E
Tagore Engineering College College in Vengapakkam, Tamil Nadu
12 Jun 2012 - 31 Jul 2016
12th
Thiru G Varadharajalu Chettiar Higher Secondary School
07 Jun 2011 - 31 Mar 2012
10th
Govt Higher Secondary School, vilapakkam
09 Jun 2009 - 31 Mar 2010
Here are the courses that I have enrolled
19 Hours of Content
Similar Profiles
Ladder of success cannot be climbed with hands in pocket.
The Future in Motion
Give more than what you get you will get more than what you gave
Avid learner