Menu

Executive Programs

Workshops

Projects

Blogs

Careers

Student Reviews



More

Academic Training

Informative Articles

Find Jobs

We are Hiring!


All Courses

Choose a category

Loading...

All Courses

All Courses

logo

Concept on positioning of Columns

Question 1:Comment on the layout of the framing plan concerning earthquake resistance in the two horizontal directions X or Y (dots are columns, lines depict beams). Look into aspects of symmetry, redundancy and bi-directional stiffness and ductility.Answer:1. Symmetry: The layout is generally symmetrical in both X and…

Project Details

Loading...

Leave a comment

Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.

Please  login to add a comment

Other comments...

No comments yet!
Be the first to add a comment

Read more Projects by porpatham G (20)

Conceptual design of a building with columns and shear walls

Objective:

Question 1:The building shown, 20 × 35 m in plan, has columns on a 5 × 5 m grid and shear walls (with dimensions shown in m, 250 mm in thickness) in three alternative arrangements, (a), (b), (c), all with the same total cross-sectional area of the shear walls. Compare the three alternatives, taking into account the restraint…

calendar

11 May 2025 06:31 AM IST

    Read more

    Concept on positioning of Columns

    Objective:

    Question 1:Comment on the layout of the framing plan concerning earthquake resistance in the two horizontal directions X or Y (dots are columns, lines depict beams). Look into aspects of symmetry, redundancy and bi-directional stiffness and ductility.Answer:1. Symmetry: The layout is generally symmetrical in both X and…

    calendar

    09 May 2025 12:19 PM IST

    • Buildings
    Read more

    Understanding the concepts on Degrees of Freedom

    Objective:

    Question 1:A five-storey structure with 5 translational DOF is shown here. Each storey has mass ‘m’. The eigenvalue problem has been solved and the 5 periods of vibration Tn and their corresponding mode shapes, φn, have been derived. The fundamental period of vibration (T1 = 2 seconds) and its associated mode shape:The…

    calendar

    09 May 2025 08:04 AM IST

      Read more

      Structural dynamics

      Objective:

      1. Differentiate Static analysis and Dynamic analysis with proper representing picturesANSWER:STATIC ANALYSISStatic analysis can only be performed if the system being simulated does not depend on time, and if the loads being applied are constant.Static analysis don't consider inertia.Static refers to the force that has…

      calendar

      09 May 2025 04:54 AM IST

        Read more

        Identification of Cracks

        Objective:

        Question 1:a) Mode of Failure / Damage Type Image 1: Localized Spalling of Concrete Mode: This damage is a localized spalling of the beam corner, likely due to corrosion of embedded reinforcement. Cause: Moisture ingress leads to steel corrosion, causing expansion and cracking of the concrete cover. Repairable: Yes.…

        calendar

        08 May 2025 03:33 PM IST

          Read more

          Project 2 - Lane National Highway Roadway Design in Civil 3D

          Objective:

           Q1) Creation of Surface1. Import Survey Data:Open AutoCAD Civil 3D.Go to the "Home" tab and click on "Create Ground Data". Select "Points" or "DEM File" as per your data source.Import the survey data points or DEM files.2. Create a Surface:In the "Home" tab, click on "Surface" and choose "Create Surface".Name…

          calendar

          22 May 2024 07:52 PM IST

          Read more

          Project 1 - Geometric Design Parameter- Prerequisites

          Objective:

            When designing a highway, several elements must be considered to ensure safe and efficient traffic flow. Here's a checklist of some prerequisite elements and necessary considerations for road geometric design: Design Speed: The maximum safe speed that can be maintained over a specific section of highway under favorable…

          calendar

          02 Apr 2024 12:12 PM IST

            Read more

            Project 2 - Supply and Demand Gap Analysis

            Objective:

            Aim Introduction Problem statement Methodology Analysis Insights Recomendations Conclusions

            calendar

            13 Jan 2024 06:34 PM IST

              Read more

              Project 1 - COVID-19 Vaccinations Trend Analysis

              Objective:

              calendar

              12 Jan 2024 06:03 PM IST

                Read more

                Project - 2

                Objective:

                Q1) Q2) Q3)  

                calendar

                06 Jan 2024 07:58 PM IST

                  Read more

                  Project 1

                  Objective:

                  Q1) A) B) Q2) A) B) C) D) Q3)

                  calendar

                  03 Jan 2024 03:20 PM IST

                    Read more

                    Project 2

                    Objective:

                    First Ready For EPS, OBS, Calender Sheets. Step1: Select EPS Step2: Create a Project Name and Project ID Step3: Create a Calendar 24x6 Step4: Q1. Develop the project schedule as per the criteria above Step: Add a Activity name and Activity ID Q2. Use 3-Tier timescale with Year / Month / Weeks Step1: Step2: Q3. Define and…

                    calendar

                    22 Dec 2023 03:53 PM IST

                      Read more

                      Project 1

                      Objective:

                      Step1: Make the EPS as “Skill-Lync Education” and OBS and assign a Project Manager Enterprise Project Structure (EPS): Skill-Lync Education This is the top-level organizational structure under which various projects will be managed. Organizational Breakdown Structure (OBS): Assign a Project Manager to…

                      calendar

                      14 Dec 2023 11:14 AM IST

                        Read more

                        Project 2

                        Objective:

                        All are answer in excel Sheet

                        calendar

                        04 Dec 2023 07:40 AM IST

                          Read more

                          Project 1

                          Objective:

                          All are word in answer

                          calendar

                          23 Oct 2023 03:32 PM IST

                            Read more

                            Project 2

                            Objective:

                            All Answer in word Document and PDF Report attached Please Verfiy

                            calendar

                            24 Sep 2023 08:48 AM IST

                              Read more

                              Project 1

                              Objective:

                              All answer attached word and Excel files.

                              calendar

                              20 Sep 2023 05:16 PM IST

                                Read more

                                Project 1 - Developing the Schedule for the “Construction of Police Station Building”

                                Objective:

                                All are Writing in word document. 

                                calendar

                                18 Aug 2023 03:04 PM IST

                                  Read more

                                  Project 2 - Strategy, Planning and scheduling of the Techno Park at a major area

                                  Objective:

                                  All are answer in word and Excel formates.

                                  calendar

                                  18 Aug 2023 02:58 PM IST

                                    Read more

                                    Project 1

                                    Objective:

                                    1A 2 most Possiable Routes: Answer: The metro system will comprise two major routes, each serving different parts of the city. Extensive feasibility studies, environmental impact assessments, and stakeholder consultations have been conducted to finalize these routes. Route A: East-West Line Starting Point: City CenterEnding…

                                    calendar

                                    21 Jul 2023 04:45 PM IST

                                      Read more
                                      Showing 1 of 20 projects