Designing of Elevated Metro Structures (Part - 1) | Skill-Lync Workshop
Notes written by Skill-Lync from the recording · Updated 17 Nov 2026
What this workshop covers
This elevated metro structures design workshop walks through a metro viaduct from pile to girder: its components, girder options and how each is designed. Recorded by Skill-Lync in December 2020 with a lead structural engineer from Indian metro projects, part 1 explains why cities build elevated before underground, then tours precast segments and launching gantries, design for every construction stage over a roughly 100-year life, station loads, analysis software, balanced cantilever spans and two-tier metro-highway piers designed to IRS and IRC codes.
Part 2 follows construction photos through each element: bored piles and strut-and-tie pile caps, precast prestressed pier caps that switch from sagging to hogging once placed, bearings and seismic stoppers, I-girders with a cast-in-situ deck, precast box girders, pretensioned U-girders and steel plate girders for longer spans. It ends with a career path from trainee to head of department.
It suits civil students and junior engineers who want the big picture of metro viaduct design. It is a slide-and-photo overview: there are no calculations, code clauses or software modelling steps, and underground stations and tunnels are only mentioned.
Chapters
Part 1
- 0:00 Why cities choose elevated over underground metro
- 2:17 Viaduct anatomy, U-girders and OHE vs third rail
- 4:38 Precast segments, launching gantry and stage loads
- 7:02 Station crowd loads, prestress limits and dynamics
- 10:38 Software: Midas Civil, STAAD.Pro and SAP2000
- 12:53 Balanced cantilever spans over railways and rivers
- 16:07 Two-tier metro-highway piers: IRS and IRC codes
- 22:07 Structural arrangement from girder down to pile
- 24:25 Options for girders, bearings, pier caps and piles
Part 2
- 0:00 Pile and pile cap sizes on a real site
- 2:22 Piles as columns, pile caps by strut and tie
- 3:35 Precast prestressed pier cap: lifting vs in place
- 5:36 Bearings and seismic stoppers on the pier cap
- 7:02 Precast I-girders and the cast-in-situ deck slab
- 10:35 Precast box girders for wide decks and torsion
- 12:03 Pretensioned U-girders for 25-28 m spans
- 14:50 Steel plate girders for longer spans
- 16:11 Career path from trainee to principal engineer
Key points from the session
- A typical viaduct, top to bottom, is: girder (superstructure) carrying the rails, bearings, pier cap, pier, pile cap and piles. The instructor says pile foundations are the norm because good strata is rarely near the surface, with open foundations used only on rock, and piles typically go 20-40 m deep.
- Precast segments, typically up to about 3 m long, are match-cast, lifted by a launching gantry and stressed together with cables, so traffic below keeps moving. The design model must simulate every stage, from casting and lifting to service, not only the finished bridge.
- The instructor's office uses Midas Civil for metro viaducts because it models time as a variable, so creep and shrinkage over the structure's life are included, and has strong prestressing tools. He says STAAD.Pro analyses one point in time and cannot apply creep and shrinkage directly; SAP2000 can also do time-dependent analysis.
- Two codes apply on a combined metro-over-highway structure: Indian Railway Standards (IRS) for the metro and IRC 112 for the highway bridge, plus rail-structure interaction and dynamic effects of both trains and road vehicles.
- A precast pier cap is lifted from two points and sags in the middle, then behaves as a double cantilever once placed on the pier, so its middle must be designed for both sagging and hogging. It is joined to the pier's projecting bars with in-situ concrete and then prestressed with transverse cables.
- Pretensioned U-girders are light, slender, moved by road at night and erected in one piece. The instructor puts their practical span at 25-27 m, about 28-30 m at most, citing 25 m units on Chennai metro and 27 m on Lucknow and Kanpur; longer crossings move to steel plate girders (30-50 m) or balanced cantilever box girders.
- Bearings can be elastomeric or POT-PTFE, with lead rubber bearings for better seismic behaviour, and seismic stoppers on the pier cap stop a girder falling onto the road in an earthquake. During piling, buried utilities often force alternative pile positions and non-standard pentagonal or hexagonal pile caps.
Why are most metro lines in Indian cities built elevated rather than underground?
The instructor says elevated viaducts are cheaper and quicker to build than underground sections, and the construction challenges are easier to manage above ground. That is why priority sections, the first stretches built, are usually elevated, as on Chennai and Lucknow metro, with underground sections following later.
What software is used to design metro viaducts?
The instructor names Midas Civil as the main tool in his office because it handles time-dependent effects like creep and shrinkage and has good prestressing features. STAAD.Pro, SAP2000 and Autodesk Robot Structural Analysis are also used, but he says STAAD.Pro cannot model the structure's behaviour over time directly.
What is the difference between a U-girder and a box girder in a metro?
A U-girder is an open, precast, pretensioned section that is light, slender and erected in one piece, typically for 25-27 m spans. A box girder is a closed section, usually precast in segments and post-tensioned, used for wider decks because the closed shape resists torsion well and suits balanced cantilever construction.
Where to go next
Who should watch
For Civil Engineers
A 18 Dec 2020 workshop recording from Skill-Lync on CIVIL. For a structured course with projects on this topic, see Skill-Lync's civil engineering courses.