Week 9 - Project - A pillar Design with Master Section
Draft analysis of the A PILLAR TRIM:
The Green region have a draft angle above 0.5


Draft analysis of the A PILLAR TRIM WITH RIBS AND DOG HOUSE WITH PRIMARY AXIS:
The Green region have a draft angle above 0.49




Draft analysis of the A PILLAR TRIM WITH RIBS AND DOG HOUSE WITH SECONDARY AXIS:
The Green region have a draft angle above 0.49


A PILLAR TRIM WITH RIBS AND DOG HOUSE:


