Week 12:- Documentation Challenge
AIM:
To create a BOM and Hardware list (BOP) for the complete fixture assembly from challenge 8.
PROCEDURE:
Bill of materials is a file, which includes all the information required for the assembly of printed circuit boards. It is one of the most important things required while manufacturing PCBs. Failure in providing a bill of materials can lead to a lot of confusion. This can further result in problems at the time of assembly, and unnecessary revisions, which can cause delays. To avoid all this, it is always the best idea to provide a proper BOM. You may ask what all things are included in the bill of materials. This brings us to our next section.
In a nutshell, it is the complete list of all the items that are required to build a product. A BOM is sometimes also referred to as a product structure, assembly component list, or production recipe (in process manufacturing industries).
Take, for example, a bicycle manufacturer that wants to build 1.000 bicycles. A bill of materials for a bicycle will include all the parts that make up the bicycle such as seats, frames, brakes, handlebars, wheels, tires, chains, pedals, and cranksets, including the quantities required of each component and their cost.
what are the things that need to include in BOM?
It's important to include quantities, part numbers (to an intelligent or non-intelligent numbering scheme), descriptions, part names, the BOM level, how it will be procured, additional relevant notes, and more.
What All Things Does a Bill of Materials include?
Now that you understand what the bill of materials is, the following information will help you understand what needs to be included in it:
Name of the Manufacturer: It is good to mention the name of the manufacturer, whose parts and components you prefer to use in the assembly. You should also mention the names of alternative manufacturers. This helps save a lot of time if components from the primary



