Challenge

Week 10 - Challenge 3 - Door Trim Lower with Engineering Features

 Door Trim Lower with Engineering attachment :- HEAT STAKES & LOCATOR

INPUT:-

TOOLING AXIS CREATION :-

     

TOOLING AXIS IS CREATED BY USING BISECTION WITH TWO  DUMMY TOOLING AXIS FOR DIFFERENT ORIENTATIONS,WHICH ARE CREATED EXTRACTING POINTS FROM PERIPHERAL EDGES OF CLASS A.

DRAFT ANALYSIS ON CLASS A

CLASS B SURFACE 

 ASSUMPTION :-   

WALL THICKNESS = 2.5 MM

CLASS C SURFACE 

CLASS A & C JOIN

FINAL TRIM

DRAFT ANALYSIS ON FINAL TRIM

DRAFT ANALYSIS ON HEAT STAKE WITH LOCATOR 

DRAFT ANALYSIS ON FINAL COMPONENT 

ISOMETRIC VIEW 

FRONT VIEW

TOP VIEW

RIGHT VIEW

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.