Usage of Navigation tool , Timeliner and Clash Detection test using Naviswork
AIM:
Usage of navigation tool, timeliner and clsh detection test using Naviswork.
PROCEDURE:
1) Install the navis work to the computer from the autodesk, and install the NWC from the autodesk to import the revit file to the Naviswork.
Open the existing project in revit > Go to file > select the export option > select the NWC option > choose the path of the location of the file > and save the file to NWC format to the folder.
The file will be exported to the navis work.
Open the Naviswork software > click file option and click open > select the exported naviswork file > click open.
The file will be open in the naviswork.
the same way import the structural file into the navis work.
2) Once the model is open in the navis work, select the walk from the viewpoint tab > to record the walk around that we are doing > select the drop button on the draw point option > select recording option in there.
Now using the cursor, move the cursor to walk around the project. To move the direction of the used the pan option.
To stop the recording the or pause it use the control keys on the toolbar.
To export the recorded video of the walk through select the export animation option.
Set the format of the video, size of the video and then click ok > choose the location of the videoand save the file.
3) The process of using the realism option in the aimation, select the realism option on the viewpoint > and select the third person option.
Once we select the option a person appear on tyhe screen and the other procedure for walk around and recording and exporting the file to the storage ar all the same as the normal walk around.
4) Open the navis work and load both architectural and structural file from the week 7 and 8 challenge.
Under the home tab we have the clash detective option.
Select the option, new dialog appears with the two different section that denotes the.
Select the add test option > and select one section as architecture and the other as structural so clashes between the two file will be detected > then click the run option the clash detection will be calculated.
TOTAL NUMBER OF CLASHES WILL APPEAR SEPERATLY BY THE FORMAT OF ROW AND COLUMN .
To view the clashes seperatly click on the clashes listed on the table and the clash on the model will be shown in the highlighted aspect.
To change the status of the clash click on the clash and select trhe column under the status header and change the status of the clash as new or approved or new or resolved
5) To prepare the schedule for an project, we can use the timeliner option from the home tab
selec the timeliner option from the home tab > new dialog box > open the selection tree > select on the add task >name the task > assign the start date for the activity and ende date of the activity.
assign the task type as construct.
Likewise add the other activity and the date of start and end.
to make the animated video out off the schedule we made select the simulate button on the timeliner dialog box, and click on the play button.
the animated video will be created.
to save the animated video offline we nned to select the export option on the end of the player and select the path of the video. the video will bw saved on the assigned location
RESULT AND REPORT:
The concept of using navis work for clash detection and schedule planning is done as per the reqirement.