Project 1

this is engine file project 1 we crate the routing engine file first we take giving connectors and clamps furr tree clips and channel bottom ,take the assembly design work bench take l clamp assembly the reqired place same clamps also assmlbe the requird place and furr tree clips inserted the reqired place chanel bottom place the reqired place engine using assembly tools.
like this above diagram channe l bottom place requried before define this channel
and start the routing the channel and branch to connectors finally routing and check it full connected are not connected .fanny routing complete.the engine file.