Challenge

Preparing Schedule & Cost Estimation for a building using REVIT

1) Use the shortcut keys in Revit discussed in class to complete the following tasks and list them below
a. Using 3D model create a section box
b. To create similar doors and windows in a floor plan layout
c. To reduce the thickness of lines visible in plan views
d. To apply override settings to a floor in the model section view
e. To increase the range of visibility in a plan view
f. To select the previously selected items
g. To add annotations to the model views
h. To bring the model elements in line
i. To rotate the model elements
j. To move an object to another location
k. To copy a model element
l. To mirror an element about an axis
m. To create an array of model elements

AIM:

To Use the shortcut keys in Revit discussed in class to complete the following tasks and list them below

a. Using 3D model create a section box = BX

b. To create similar doors and windows in a floor plan layout = CS

c. To reduce the thickness of lines visible in plan views = TL

d. To apply override settings to a floor in the model section view = EOD

e. To increase the range of visibility in a plan view = VR

f. To select the previously selected items = CTRL + <

g. To add annotations to the model views= DI

h. To bring the model elements in line = AL

i. To rotate the model elements = RO

j. To move an object to another location = MV

k. To copy a model element = CO

l. To mirror an element about an axis = MM

m. To create an array of model element= AR

2) Using Revit and the project used from week 6 to 8 prepare a schedule for the following
a. Walls
b. Doors
c. Windows
d. Material – Concrete/Wood

AIM:

To prepare a schedule for the

a. Walls:

INTRODUCTION:

Schedule option Create a schedule that includes images to represent model elements.

When needed, add a list of building element components to your model.

  1. Click View tab>Create panel>Schedules drop-down>Schedule/Quantities.
  2. In the New Schedule dialog, do the following:
    1. Select a component from the category list. A default name appears in the Name text box, which you can change as necessary.
    2. Select Schedule building components.
      Note: Do not select Schedule keys.
    3. Specify the phase.
    4. Click OK.
  3. In the Schedule Properties dialog, specify the schedule properties.
    • Select Fields
    • Filter data to include in the schedule
    • Sort and group the data
    • Format the schedule
    • Change the schedule's appearance
  4. Click OK.

Multi-category schedules can only include loadable families. When you place shared parameters in a schedule, categories that do not have the selected shared parameter do not display in a schedule.

PROCEDURE:

Open the architectural template which we have created in week 6-8 for the project

Click on the view tab

Select schedule quantities option from the view tab

Select walls

A schedule tab dialog box will appear, select the components which we want to display in the schedule

RESULT:

With the help of above steps we are able to create the schedule for walls

To prepare a schedule for the

b. DOORS:

PROCEDURE:

In the same the architectural template which we have opened

Click on the view tab

Select schedule quantities option from the view tab

Select doors

A schedule tab dialog box will appear, select the components which we want to display in the schedule

RESULT:

With the help of above steps we are able to create the schedulr for doors

To prepare a schedule for the

c. WINDOWS

PROCEDURE:

In the same the architectural template which we have opened

Click on the view tab

Select schedule quantities option from the view tab

Select windows

A schedule tab dialog box will appear, select the components which we want to display in the schedule

RESULT:

With the help of above steps we are able to create the schedulr for windows

To prepare a schedule for the

d. MATERIAL TAKE OFF

PROCEDURE:

In the same the architectural template which we have opened

Click on the view tab

Select MATERIAL TAKE OFF option from the view tab

Select WALL

A schedule tab dialog box will appear, select the components which we want to display in the schedule

RESULT:

With the help of above steps we are able to create the schedulr for wall material takeoff

3) Using Revit Calculate area and volume of each room in the model with appropriate room tags applied to each room. Prepare a schedule report for area and volume of each room.

AIM:

To calculate area and volume of each room in the model with appropriate room tags applied to each room. Prepare a schedule report for area and volume of each room

INTRODUCTION:

Schedule option Create a schedule that includes images to represent model elements.

When needed, add a list of building element components to your model.

  1. Click View tab>Create panel>Schedules drop-down>Schedule/Quantities.
  2. In the New Schedule dialog, do the following:
    1. Select a component from the category list. A default name appears in the Name text box, which you can change as necessary.
    2. Select Schedule building components.
      Note: Do not select Schedule keys.
    3. Specify the phase.
    4. Click OK.
  3. In the Schedule Properties dialog, specify the schedule properties.
    • Select Fields
    • Filter data to include in the schedule
    • Sort and group the data
    • Format the schedule
    • Change the schedule's appearance
  4. Click OK.

Multi-category schedules can only include loadable families. When you place shared parameters in a schedule, categories that do not have the selected shared parameter do not display in a schedule.

PROCEDURE:

Open the architectural template which we have created in week 6-8 for the project

Click on the view tab

Select schedule quantities option from the view tab

Select room

A schedule tab dialog box will appear, select the components which we want to display in the schedule like area, volume etc

RESULT:

With the help of above steps we are able to create the schedule report for area and volume of each room

4) Using the same schedule using the unit cost rate for materials available in the internet, prepare total cost of materials used in the project
a. Total Cost of Materials
b. Individual Material Take off

AIM:

To use the same schedule using the unit cost rate for materials available in the internet, prepare total cost of materials used in the project
a. Total Cost of Materials
b. Individual Material Take off

INTRODUCTION:

Schedule option Create a schedule that includes images to represent model elements.

When needed, add a list of building element components to your model.

  1. Click View tab>Create panel>Schedules drop-down>Schedule/Quantities.
  2. In the New Schedule dialog, do the following:
    1. Select a component from the category list. A default name appears in the Name text box, which you can change as necessary.
    2. Select Schedule building components.
      Note: Do not select Schedule keys.
    3. Specify the phase.
    4. Click OK.
  3. In the Schedule Properties dialog, specify the schedule properties.
    • Select Fields
    • Filter data to include in the schedule
    • Sort and group the data
    • Format the schedule
    • Change the schedule's appearance
  4. Click OK.

Multi-category schedules can only include loadable families. When you place shared parameters in a schedule, categories that do not have the selected shared parameter do not display in a schedule.

PROCEDURE:

In the same the architectural template which we have opened

Click on the view tab

Select MATERIAL TAKE OFF option from the view tab

Select WALL

A schedule tab dialog box will appear, select the components which we want to display in the schedule

RESULT:

With the help of above steps we are able to create the schedule for wall material takeoff

5) Using the concept of Visual Programming discussed in class, list a flowchart for the following scenario
a. How to decide framings for a structure using Dynamo ?
b. If there is no water coming from the pipes
c. If request for money from client has been declined for the project

AIM:

To use the concept of Visual Programming discussed in class, list a flowchart for the following scenario
a. How to decide framings for a structure using Dynamo ?


b. If there is no water coming from the pipes


c. If request for money from client has been declined for the project

6) List the parameters associated with each model element
a. Wall
b. Floor
c. Door
d. Window
e. Table
f. Building

AIM:

To List the parameters associated with each model element
a. Wall

Type of wall

Length of wall

Width of wall

Height of wall

Cost estimate of wall

Thickness of wall

Material used for wall

b. Floor

Type of floor

Length of floor

Width of floor

Area of floor

Volume of floor

Cost of floor

Thickness of floor

c. Door

Height of door

Width of door

Length of door

Thickness of door

Material

Type of door

d. Window

Height of window

Width of window

Length of window

Thickness of window

Material

Type of window

e. Table

Height of table

Width of table

Length of table

Material of table

Type of table

Purpose of table

f. Building

Height of building

Width of building

Length of building

Type of building

No of building

Area of building

Set back of building

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.