Preparing Schedule & Cost Estimation for a building using REVIT
1:-aim:-Use the shortcut keys in Revit discussed in class to complete the following tasks and list them below
a. Using 3D model create a section box
b. To create similar doors and windows in a floor plan layout
c. To reduce the thickness of lines visible in plan views
d. To apply override settings to a floor in the model section view
e. To increase the range of visibility in a plan view
f. To select the previously selected items
g. To add annotations to the model views
h. To bring the model elements in line
i. To rotate the model elements
j. To move an object to another location
k. To copy a model element
l. To mirror an element about an axis
m. To create an array of model elements
procedure:-clicking-bx

procedure:-clicking-cs

procedure:-clicking-tl

procedure:-clicking-vg

procedure:-clicking-vr

procedure:-clicking-DI

procedure:-clicking-AL

procedure:-clicking-RO

procedure:-clicking-CO

procedure:-clicking-MV

procedure:-clicking-MM

procedure:-clicking-AR

2:-AIM:-Using Revit and the project used from week 6 to 8 prepare a schedule for the following
a. Walls
b. Doors
c. Windows
d. Material – Concrete/Wood
PROCEDUR:-
- OPEN REVIT SOFTWARE
- OPEN ARCETECHURE FLOOR PLAN
- CLICK VIEW AND SHEDUAL
- THEN CLICK DOOR , WINDOW, FLOOR,WALL AND TYPE OF SHEDUAL
RESULT:-




3:-AIM:-Using Revit Calculate area and volume of each room in the model with appropriate room tags applied to each room. Prepare a schedule report for area and volume of each room.
procedure:-
- OPEN REVIT SOFTWARE
- OPEN ARCETECHURE FLOOR PLAN
- CLICK VIEW AND SHEDUAL
- THEN CLICK ROOM AND AFTER HES PARAMETER
RESULT:-

4:-AIM:-Using the same schedule using the unit cost rate for materials available in the internet, prepare total cost of materials used in the project
a. Total Cost of Materials
b. Individual Material Take off
PROCEDURE:-
- OPEN REVIT SOFTWARE
- OPEN ARCETECHURE FLOOR PLAN
- CLICK VIEW AND SHEDUAL AND MATERAIL TEKOFF
- THEN CLICK ROOM, WALL, WINDOW, DOOR, ROOF, FLOOR AND AFTER HES PARAMETER
RESULT:-





5:-AIM:-Using the concept of Visual Programming discussed in class, list a flowchart for the following scenario
a. How to decide framings for a structure using Dynamo ?
b. If there is no water coming from the pipes
c. If request for money from client has been declined for the project
ANS:-
A):-How to decide framings for a structure using Dynamo ?
ANS:-
- Prepartion of framwork
- assembling the formwork
- placement of rainforcment
- concrete placing
- copmpacting
- curring
- completed
b. If there is no water coming from the pipes
ans:-
- check the pipe connection
- check the water supply
- check for any leaks
- fix the problem
c. If request for money from client has been declined for the project
ans:-
- explaine the project to the client
- provide time to clinet decide
- a):-if the accepts to pay, continue with the project
- b):-if he refuse to pay decline the project
6:-aim:-6) List the parameters associated with each model element
a. Wall
b. Floor
c. Door
d. Window
e. Table
f. Building
ans:-




slected item and click them ,after clicking edit option the parameters