Aim&Introduction :To know What is the mode of failure or damage of the beams in the figure above? Are the damages repairable? Elaborate

A :Observation :

  • From the above picture it is known that the Concrete has been crushed and the bottom reinforcement is visible
  • Spalling of Concrete has been taken place below the reinfocement that results in rupture
  • The top portion of the beam seems to be safe because of the flange advantage on slab
  • Crack has been developed from bottom to top means rebar yielding in Support bottom only.

Answers:

  • It forms a flexural Failure due to reversal of stress during earthquake
  • During Stress Reversal,At Supports Top of Slab Experiences Compression and the bottom Experiences the tension,so that Compression takes place on concrete and Tension acts on steel
  • Top Compression is Managed by slab Advantage .Bottom Tension was not satisfied by the provided Reinforcement.

Result :

  • Since the Reinforcement got yielded it can be Repaired.

B : Obsevation :

  • Cracks are Visible along the Beam column Junction
  • Cracks Are visible on the entire structure the crack width seems to be wide along the structure
  • The concrete has not been Crushed
  • it seems to be the beam and column has no bonding (i.e) it seems to be seperated
    Answer :
  • Its beam pull out failure due to insufficient Development length of reinforcement in joints
  • During Eathquake,the horizontal movement of the structure make this condition worse and detached the beam member from the column
  • providing Anchorage length between two existing concreten is very difficult

Result :

  • So it is not Repairable.

C : Observation:

  • Cracks are Developed at the joints of beam Column exactly
  • Crack in beam has developed to its entire width
  • Moreover the randomly the crack has also been developed in the slab in along the directions of the beam

Answers :

  • It is a plastic Hinge failure develops at the beam column joints
  • The damage has occured only at the joints initially
  • cyclic lateral loading and stress reversal at the joints leadto the damage
  • even the slab has participated to its Best to handle the tension.But unable to control the damage

Result:

  • This Joint can be strengthened

2) Aim & Introduction :To know What is the mode of failure or damage of the beams in the figure above? Are the damages repairable? Elaborate

A : Observation :

  • Spalling of concrete has taken place at the top of column\
  • All sides of column has been Spalled
  • Beams tends to be safe
  • Location of column looks at edge of buliding
  • No walls are built around the columns that means ground floor alloted for car parking

Answers :

  • It is a Soft Storey failure,Technically Plastic Hinge has been Formed
  • Due to absence of infill walls at the ground floor the plastic hinge forms at the top og ground storey column suring latgeral movement.
  • Due to bucikling of longitudinal reinforcement it has been taken place.

Result :

Based on the development of crush of concrete it can be either be Repairable or Non- repairable.

B : Observation :

  • Concrete has undergone complete breakage diagonally
  • Longitudinal reinforcement are intact
  • Shear Reinforcement placing looks wider

Answer :

  • It is a Pure Shear Failure
  • All the shear failure acts on Concrete and damages the concrete Completely
  • Due to inadequate Shear reinfocements Compels the concrete to take over all the shear stresses.

Result :

It is not repairable.

C : Observation :

  • Column has been Failed Completely
  • No bonding Between upper and lower column
  • Two Slabs Connected to column one at the midway
  • Wooden piles might be the post failure support after the column fails to provide temporary support to avoid the collapse

Answer:

  • Its a Short Column failure heavy shear force acts at this kind.
  • Additional slab or beam connected to column leads to this effect
  • this Leads to failure if the connection is unintentional or not accounted in design

Result :

The Failure is not at all repairable

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.