Challenge

Identification of Cracks

Question 1:

a)

OBSERVATION-

- concrete crushed and reinforcement is exposed

- concrete spalled beyond the reinforcement which may be sign of rupture

- beam top portion looks safe because of the flange advantage from slab

- the cracks develop from bottom to top means rebar yielding occur in support bottom only.

ANSWER-

- Its form of flexural due to reversal of stress during eathquake.

- during stress reversal, support top experiences compression and bottom experiences tension

- top compression is managed by slab advantage, bottom tension was not satisfied by the provided reinforcement

- since the reinforcement got yielded, it cannot be repaired.

b)

OBSERVATION -

- cracks along beam column edge

- crack seems to have developed through the structure as it look much wider

- beam looks seperated from the column at joints

- concrete is not severly crushed

ANSWER -

- Its beam pull out failure due to insufficiant development length of reinforcement in joints.

- during earthquake, the horizontal movement of structue makes this condition worse and detached the beam member from column

- providing achorage length btween two existing concrete is very difficult, so not repairable.

c).

- cracks are exactly at the joint of column- beam

- cracks in beam developed through its entire width

- slab also developed more cracks along the beam width direction.

ANSWER

- Its a plastic hinge failure

- the damage occured only in the joint zone first of all

- the cyclic lateral loading and stress reversal at the joints led to the damage

- even the slab participated to its best to handle the tension ( slab is severly cracked means it has undegone tension with its flange conditions), but unable to control the damage

- the joint can be strengthened

Question 2:

a).

-

OBSERVATIONS-

- concrete damage at top of a column

- concrete damaged all around the column face

- beams are safe

- the location of column looks at the edge of building

- no walls are built along the column means it is probably at ground floor, for parking car movement access.

ANSWER-

- Its a soft strorey failure, technically plastic hinge formation

- due to absence of infills walls at the gorund floor, the plastic hinge forms at the top of ground storey column during lateral movement

- based on the development of crush of concrete, it can either be rapairable or non repairable.

b).

OBSERRVATION-

- Concrete developed complete breakage diagonally

- longitudnal reinforcement are intact

- shear reinforcement spacing looks wider ( which means probably lesser shear rebar provided)

ANSWER-

- its pure shear failure

- inadequate shear reinforcement compels concrete takes all shear stresses.

c).

OBSERVATIONS-

- column failed completly

- failure at top of column

- there are two slabs connected to column, probably one mid height of the column.

- the wooden piles might be a past failure support after column failed, providing temporary prop to avoid collapse of the entire structure.

ANSWER-

- its a short column failure

- an additional slab or beam connected to column at mid height lead to this effect

- this lead to failure especially if the connection is unintentional and not accounted in design

- the failure given in the picture is not at all reapairable

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.