Menu

IIT Certification Programs

Workshops

Projects

Blogs

Careers

Student Reviews



More

Academic Training

Informative Articles

Find Jobs

We are Hiring!


All Courses

Choose a category

Loading...

All Courses

All Courses

logo

Week 9 - Project - A pillar Design with Master Section

Picture of the sketches with Sketch solving status’s geometry tab Picture of the Detailed tree structure.   Picture of the 3D CAD   Create closed body  After getting combined Class A, B and C surface we joined them to form one single closed surface boundary and then with the help of closed body command which is there in…

    Project Details

    Loading...

    Leave a comment

    Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.

    Please  login to add a comment

    Other comments...

    No comments yet!
    Be the first to add a comment

    Read more Projects by Rahul Sule (19)

    Week 10- Assembly Workbench

    Objective:

    CV JOINT: SCREENSHOT:-     QUICK RETURN ASSLY: SCREENSHOT:-   Submit a report explaining the procedure you followed while working on this assignment:- First of all we have created single parts in part workbench with proper dimensions and contraints. Then opened new assembly workbench and imported all single…

    calendar

    28 Nov 2022 03:14 PM IST

      Read more

      Week 9 - Project - A pillar Design with Master Section

      Objective:

      Picture of the sketches with Sketch solving status’s geometry tab Picture of the Detailed tree structure.   Picture of the 3D CAD   Create closed body  After getting combined Class A, B and C surface we joined them to form one single closed surface boundary and then with the help of closed body command which is there in…

      calendar

      24 Nov 2022 02:51 PM IST

        Read more

        Week 9 - Project 1 - Door Trim Lower with Engineering Features

        Objective:

        Create the Door Trim Lower Plastic component through the given Class-A surface. To begin with, the tooling axis for the given Class-A Surface should be created meeting the requirements of the draft angle and at the end perform the Draft analysis on the model.  Create the Heat Stakes and the locators considering the…

        calendar

        19 Nov 2022 02:35 PM IST

          Read more

          Week 9 - Attachment Feature Creation - Challenge 2

          Objective:

          Create the Dog House for the Door Trim considering the design rules mentioned in the video. Consider the thickness of the part to be 2.5 mm. "C" is where the doghouse contacts the backside of the surface  Doghouse wall thickness at the intersection of the part wall ( C ) should be 40% or less than the main wall stock (…

          calendar

          16 Nov 2022 01:51 PM IST

            Read more

            Week 8 - Challenge 4 - Bumper

            Objective:

            Create the Bumper Plastic component through the given Class-A surface. To begin with, the tooling axis for the given Class-A Surface should be created meeting the requirements of the draft angle and at the end perform the Draft analysis on the model.  Take the Thickness of the component to be 3 mm.   SOLUTION:-…

            calendar

            11 Oct 2022 02:18 PM IST

              Read more

              Week 8 - Challenge 3 - Coin Holder Design

              Objective:

              Create the Coin Holder Plastic component through the given Class-A surface. To begin with, the tooling axis for the given Class-A Surface should be created meeting the requirements of the draft angle and at the end perform the Draft analysis on the model.  Take the Thickness of the component to be 2.5 mm  …

              calendar

              22 Sep 2022 01:37 PM IST

                Read more

                Week 9 - Attachment Feature Creation (Ribs & Screw Boss) - Challenge 1

                Objective:

                Create the rib for the Drill Handle considering the design rules mentioned in the video.    SOLUTION:- Screenshots of the completed design in various orientations (Isometric, Front, Side, and Top View) ISOMETRIC VIEW FRONT VIEW SIDE VIEW TOP VIEW   A detailed report should be done explaining the draft analysis…

                calendar

                18 Sep 2022 02:39 PM IST

                  Read more

                  Week 8 - Challenge 6 - Core & Cavity Design

                  Objective:

                  Create the Core and cavity blocks for the switch bezel designed in the earlier challenge.    SOLUTION:- Screenshots of the Draft analysis report for both the switch bezel plastic component ISOMETRIC VIEW FRONT VIEW SIDE VIEW TOP VIEW   A detailed report should be done explaining the draft analysis and the…

                  calendar

                  16 Sep 2022 06:44 AM IST

                    Read more

                    Week 8 - Challenge 2 - Switch Bezel Design

                    Objective:

                    Create the Switch Bezel Plastic component through the given Class-A surface. To begin with, the tooling axis for the given Class-A Surface should be created meeting the requirements of the draft angle and at the end perform the Draft analysis on the model.  Take the Thickness of the component to be 2.5 mm  …

                    calendar

                    12 Sep 2022 02:34 PM IST

                      Read more

                      Week 8 - Challenge 1 - Base Bracket Design

                      Objective:

                      Create the Base Bracket Plastic component through the given Class-A surface. To begin with, the tooling axis for the given Class-A Surface should be created meeting the requirements of the draft angle and at the end perform the Draft analysis on the model.    SOLUTION:- Screenshots of the Draft analysis report…

                      calendar

                      12 Sep 2022 02:23 PM IST

                        Read more

                        Project 2

                        Objective:

                        Description:As discussed in Lecture 11, Project 2 deals with the development of a forward energy-based fuel consumption model of a P1 hybrid vehicle. This model is based on the conventional vehicle model from Project 1. The main goal of this project is to understand the functionality of a P1 hybrid and be able to model…

                        calendar

                        14 Jul 2022 08:50 AM IST

                        • MATLAB
                        Read more

                        Project 1

                        Objective:

                        AIM:-To develop a forward energy-based fuel consumption model of a conventional vehicle with a 1.9L engine and a 4-         speed automatic transmission using Matlab and Simulink to generate plots and analyze data. MATLAB INITIAL SCRIPT:- %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%…

                        calendar

                        07 Jun 2022 02:31 PM IST

                        Read more

                        Project

                        Objective:

                        AIM:- Carry out a system-level simulation of an all-terrain vehicle.  OBJECTIVES:- To prepare a technical report of the model and comment on the results. To explain the function of the subsystem and also blocks that are used in the model. Study a BAJA ATV model. All-terrain vehicle(ATV):- An all-terrain vehicle is defined…

                        calendar

                        25 Apr 2022 01:34 PM IST

                          Read more

                          Week - 4

                          Objective:

                          1) Implement the control logic of a “washing machine” using Stateflow as per the given sequence:  If the power supply is available, the system gets activated  If the Water supply is not available, stop the process & indicate through LED Soaking time should be 200s followed by Washing time of 100s. Then rinsing happens…

                          calendar

                          17 Apr 2022 02:47 PM IST

                            Read more

                            Week -2

                            Objective:

                            Simulink model of Doorbell :- Explanation:- We used the following blocks in the Simulink model:-   Pulse Generator - This is used to create square wave pulses at regular intervals of time Scope - Shows results in the form of graphical representation Switch - It is used with the help of a Simulink PS converter to convert…

                            calendar

                            01 Apr 2022 08:57 AM IST

                              Read more

                              Project 1 - Parsing NASA thermodynamic data

                              Objective:

                              Main Program- %Thermo-NASA file reading program clear all; close all;clc %Reading data file f1=fopen('THERMO.dat','r') %Skip header line fgetl(f1) %global temperatures Temp=fgetl(f1); Temp=str2num(Temp); global_low_temp=Temp(1); global_mid_temp=Temp(2); global_high_temp=Temp(3); %Universal Gas Constant R=8.314; %skip next…

                              calendar

                              21 Mar 2022 05:58 AM IST

                                Read more

                                Week 4.1 - Genetic Algorithm

                                Objective:

                                1) CODE - %Program to find global maxima of function clear all; close all; clc x = linspace(0,0.6,150); % x Search space y= linspace(0,0.6,150);% y search space num_cases = 50 %50 times for function will run [xx yy] = meshgrid(x,y); for i = 1:length(xx) for j = 1:length(yy) input_vector(1)=xx(i,j) input_vector(2)=yy(i,j)…

                                calendar

                                05 Mar 2022 02:38 PM IST

                                Read more

                                Week 3 - Solving second order ODEs

                                Objective:

                                %%Program to simulate motion of simple pendulum clear all; close all; clc; %Inputs b=0.05;%damping coeff g=9.81 %gravity l=1%Length of pendulum m=1%mass of ball %INITIAL CONDITIONS of angular displacemet & Velocity at t=0 Y0 = [0;3]; %TIME SPAN t_span = linspace(0,20,500); %SOLVING ODE [t,Y0] = ode45(@(t,Y0) ode_func(t,Y0,b,g,l,m),…

                                calendar

                                12 Feb 2022 03:08 PM IST

                                  Read more

                                  Week 2- 2R Robotic Arm Challenge

                                  Objective:

                                  % A program to simulate forward kinematics of 2R Robotic Arm close all clc ct = 1; theta1 = linspace(0,90,10); theta2 = linspace(0,90,10); for i = 1 : length(theta1); THETA1 = theta1(i); for j = 1 : length(theta2); THETA2 = theta2(j) %Inputs L1 = 1; L2 = 0.5; x0 = 0; y0 = 0; x1 = L1*cosd(THETA1); y1 = L1*sind(THETA1);…

                                  calendar

                                  24 Jan 2022 02:36 PM IST

                                    Read more
                                    Showing 1 of 19 projects