Challenge

Week 9 - Project 1 - Door Trim Lower with Engineering Features

REPORT

FIRST USING CLASS A SURFACE CRATED CLASS B SURFACE

CREATED CLASS C SURFACE

USING JOIN COMMAND JOINED CLASS A B AND C SURFACE

DRAFT ANALYSIS DONE

WITH REFERENCE TO CLASS A SURFACE AND USING POSITIONED SKETCH SKETCH FOR LOCATOR CREATED

USING PAD COMMAND SKETCH CONVERTED INTO SOLID PART THAT IS LOCATOR

SAME PROCEDURE FOLLOWD FOR SECOND LOCATOR

REFERRING CLASS A AND CLOSE SURFACE SKETCH FOR HEAT STAKE CREATED

USING PAD COMMAND HEAT STAKE CREATED

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.