Challenge

Week 8 Challenge

DATA GIVEN:-

Basic Design Detail

Sl. No Span and Cross section Quantity Unit
1 C/c of expansin joint 47.5 m
2 C/c of bearing 45.3 m
3 Dist. Of bearing to expansion joint 1.1 m
4 Total width of the deck 12.5 m
5 Width of the carriageway 8.5 m
6 Footpath width (One Side) 1.5 m
7 Crashbarrier width 1 m
8 Median Gap 1 m

Superstructure Details

Sl.No Items Quantity Unit
1 No of girders 1
2 Depth of superstructure 2.7 m
3 Thickness of wearing coat 0.065 m
4 Bearing thickness 0.065 m
5 Pedestal thickness 0.25 m

LEVEL:-

1 Height of the Substructure Assumption 6 m
2 Finished Road Level FRL 215.2 m
3 Bearing Level 212.256 m
4 Pier Cap Top level 211.941 m
5 Pier Cap Bottom level 210.941 m
6 Ground Level GL 206.95 m
7 High Flood Level HFL 209.941 m
8 Chainage Ch. 165+330 m
9 Pile Cap top Level 204.95 m
10 Depth of pile cap Assume 1.5 m
11 Pile Cap Bottom level 203.45 m
12 Clear Cover for Pile 75 mm

Materials:-

Sl. No Particulars Remarks Values/Quantity Units
1 Grade of concrete fck M 35 Kn/m2
2 Design strength of concrete fcd 15.63 Kn/m2
3 Grade of Steel fyk Fe 500 Kn/m2
4 Design strength of steel fyd 434.78 Kn/m2
5 Density of RCC 2.5 Kn/m3
6

Density of W.C

2.2 Kn/m3
7 Coefficient of thermal expansion of concrete. 1.2 E-05/ c
8 Shrinkage strain 2 E-04
9 Es 200000 Mpa
10 Ec (M35) 32000 Mpa

Water Current Data:-

1 Max Mean velocity 0.98 m/s
2 Constant "K' for the pier in the transverse direction 0.66
3 Constant "K' for the pier in the Longitudinal direction 1.5
4 % of uplift consideration 100 %

Soil Parameters:-

Sl. No Items Value Units
1 Angle of shear resistance 30
2 Density of dry backfill 2 t/m3
3 Density of submerged backfill 1 t/m4
4 Net Soil Bearing Capacity 25 t/m5
5 Gross SBC (LWL) 33.42 t/m6
6 Gross SBC (HFL) 27 t/m7
7 Live Load surcharge 1.2 m
8 Type of soil median soil
9 Coefficient of friction 0.5

Factor of Safety for materials:-

Material Basic Combination Seismic Combination
Concrete 1.5 1.5
Steel 1.15 1.15

Loads on the Superstructure:-

Deadload on the Superstructure:-

Total weight of superstructure 300 t
Reactions 150 t
Total reaction on abutment 150 t
Distance between BRG. & C/L of abutment shaft 0 m
Longitudinal movement 0 t-m
Transverse eccentricity of Dl from C/l of abutment 0 m
Transverse Movement 0 t-m

SIDL (Excluding W.C)

Crash barrier weight 100 t
Weight of the Railing 0 t
Foothpath / service weight 0 t
Total reaction on abutment 50 t

SIDL (Excluding W.C)

Load intensity due to wearing course 0.22 t
DL of wearing course 150 t
Total reaction on abutment 75 t

Substructure

Abutment:-

Box part:-

Length ( Longitudinal ) 12.5 m
Length ( Transverse ) 2.52 m
Height 0.5 m
Volume 15.75 m3
Weight 39.375 t

Trapezoidal Part:-

Top Length 12.5 m
Bottom Length 12.5 m
Top width 2.52 m
Bottom width 1.5 m
Height 0.5 m
Volume 12.5625 m3
Weight 31.40625 t
Total weight of pier cap 70.78125 t

Abutment shaft:-

Length ( Longitudinal ) 12.5 m
Length ( Transverse ) 1.5 m
Height 6 m
Volume 112.5 m3
Weight 281.25 t

LIVE LOADS:-

1 lane 70 R wheeled
Live Load reaction
Total live load 100 t
No of lanes 2 nos
% reduction in live load 0 % reduction
impact factor - 1.09 As per IRC 6
Total load with imact 109
Ra 99.3 t
Rb 9.69 t
vertical reaction on the abutment 99.3 t
Breaking force 19.86 t 20 % of Ra
Total horizontal force at abutment 9.93 t Fh/2
Bearing Type Elestometric Bearings
Transverse eccentricity 3.155 m
Transverse movement 313.2915 t-m
1 lane Class A
Total live load 55.4 t
No of lanes 2 nos
% reduction in live load 0 % reduction
impact factor - 1.09 As per IRC 6
Total load with imact 60.386
Ra 36.67 t
Rb 23.72 t
vertical reaction on the abutment 36.67 t
Breaking force 7.334 t 20 % of Ra
Total horizontal force at abutment 3.667 t Fh/2
Breaking Type Elestrometric Bearings
Transverse eccentricity 4.2 m
Transverse movement 154.014 t-m

Force summary at Foundation Bottom level:-

Load Item P Load (Min) ML MT HL HT
t t t-m t-m t-m t-m
Dead Load 150 0 0 0 0 0
SIDL ( Exclding WC) 60 0 0 0 0 0
SIDL ( WC) 75 0 0 0 0 0
Class 70 R wheeled 99.3 9.69 99.3 313.2915 9.93 0
Class A vehicle 36.67 23.72 36.67 154.014 3.667 0

Well Foundation:-

Well foundation is a type of deep foundation which is generally provided below the water level for bridges. Cassions or well have been in use for foundations of bridges and other structures since Roman and Mughal periods. The term 'cassion' is derived from the French word caisse which means box or chest. Hence cassion means a box like structure, round or rectangular, which is sunk from the surface of either land or water to some desired depth.

Open cassion is a box opened both at top and bottom. It is made up to either timber, concrete or steel. The open cassion is called well.

Well foundation is the most common type of deep foundation used for bridges in India.

A type of foundation where a part of the structure is hollow, which is generally built-in parts and sunk through ground or water to the prescribed depth by removing earth through a dredge hole.

Components of well foundation.

  • Well Cap
  • Top plug
  • Stening
  • Bottom plug
  • Well curb
  • Cutting edge
  • Filling inside ( Sand / Water )

Well Cap:-

A Well cap is a thick concrete mat that rests on the top of well stening. It is a part of the foundation and used to distribute loads of superstructure over the steining

Top Plug:-

It is a concrete layer of thickness around 500mm, as mentioned in design and drawing. Top plug provided over the filling and inside the well dredge hole.

Well Steining:

Steining is a wall or shall type of structure made up of RCC, and which helps to transfer the load to the curb. It serves as an enclosure for excavating the soil for the penetration of the foundation well

Bottom Plug:

After completion of sinking, the bottom of the foundation well is plugged with the help of concrete. The well curb confines the bottom plug, and functions like a raft against soil pressure from below

Well Curb:

Well Curb is a RCC ring beam-type component of well having a steel cutting edge below. Vertical cross-section of the well curb is wedge-shaped, which helps during the well sinking. The curb supports well steining, and the steining is kept slightly projected outer side to reduce the skin friction during well sinking

Cutting Edge:

It is the lowest part of the foundation well, and fabricated in the yard as per approved drawing. Cutting edge shall be fabricated in a number of segments depending upon circumference and ease of handling and transport. Cutting edge helps to cuts the soil during the sinking operation.

Back-filling:

The well is dewatered after setting of bottom plug concrete, and it is backfilled by sand or excavated approved material. Sometimes water can be used instead of sand/excavated material.

Field data required for Design of Wells:

  • Design discharge from an authentic source
  • Water surface slope on upstream and downstream
  • Low water level and high flood level from an authentic source
  • Silt factor from geotechnical investigation report
  • Cross-section of the river
  • Plain table survey of the river
  • The deepest existing scour in the vicinity of the river.
  • Strata chart i.e. bore log data.
  • Availability of construction materials

Construction Sequence of Well Foundation:

Following steps in the sequence are to be executed:

  • Setting out
  • Cutting edge – fabrication, transportation, assembly, placing in final position
  • Well curb construction – inner shuttering, reinforcement work, outer shuttering, concreting, curing, de-shuttering and grounding.
  • Construction of steining and sinking
  • Checking and monitoring tilt and shift
  • Bottom Plugging, sand filling, top/intermediate plugging, if any, water filling, if any, and casting of well cap

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.