Week 6 - Creating connection for Rear door
Creating connection for Rear door
AIM: Create and Apply different PIDs for different components. By using the same technique and the elements as shown in the video, Perform suitable connections. (No thickness need to be assigned to FE as intention is just to deploy connections)
PROCESS:
- The given meshed model is having a single PID.So, we defined it into different PID's so as to have a fine connections.

- By looking into the model we can define that it can have SPOT WELD,SEAM WELD,BOLT CONNECTIONS,BEEDING & RBE 2.
- SO,we made them as submitted below.
- SPOT WELD

BOLT

RBE2

FOR DOOR HANDLE ROTATION IN Z AXIS IS ENABLED.

BEEDING

FINAL
