Week 12- Final project
WEEK 12: THE FINAL ASSIGNMENT
NOTE: The report, and CAD portion are attached.
Aim:
To create the Door Trim Panel
GOAL:
v CAD model creation taking into account the following inputs, similar to OEM and tier 1 companies
a) Surface class A;
b) nominal thickness: Consult the master sections.
c) The attachment technique:
Determine a method for attaching the door panel to the finished project. Make use of Attaching the door panel to the lower substrate using a pushpin and dog house. To attach parts to parts, use heat stakes.
Required output:
§ Make the thickened portion by referring to the master section.
§ Make the mounting features with master portions and in accordance with industry design norms.
Provide relevant details:
§ Tooling analysis and draft analysis.
§ Making parting lines and determining the viability of the tooling.
1] Armrest Part:
a. Class A Improvement:

b. Class B:
Ø Class B is created by offsetting Improved Class A by 2.5 mm as per the master section.

C. Class C:
Ø Class C is created by sweeping Improved Class A Surface and it has been trimmed with Class B Surface.
Ø Close Body is created from the fully close surface

Draft analysis:

2. MAP POCKET:
CLASS A:

CLASS B:
Ø Class B is created by offsetting Improved Class A by 2.5 mm as per the master
section.

CLASS C & final product:


DRAFT ANALYSIS:

3. LOWER SUBSTRATE:
a. CLASS A:

b. CLASS B:

C: CLASS C & final product:


DRAFT ANALYSIS;


4. BOTTLE HOLDER
a. CLASS A SURFACE:

b. CLASS B SURFACE:

C: CLASS C & FINAL PRODUCT:


DRAFT ANALYIS:

FINAL PRODUCT ASSEMBLY:


RESULT:
Thus, we have developed the door trim panel.