Week 11 - Project - A pillar Design with Master Section
The given class A surface of the Door Trim is succesfully thickened to a thickness of 2 mm as a part. The class A surface was offested to create class b surface, and there were two unformed patch areas. The left out patches were rectified by reworking the surfaces and giving required fillets. The class C surface is created and then added to the class A surface. Then the class A surface is trimed with the class B surface. The final trim surfaces is converted int
o a part using close body command.