Challenge

Week 11 - Project - A pillar Design with Master Section

The given class A surface of the Door Trim is succesfully thickened to a thickness of 2 mm as a part. The class A surface was offested to create class b surface, and there were two unformed patch areas. The left out patches were rectified by reworking the surfaces and giving required fillets. The class C surface is created and then added to the class A surface. Then the class A surface is trimed with the class B surface. The final trim surfaces is converted into a part using close body command.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.