Menu

IIT Certification Programs

Workshops

Projects

Blogs

Careers

Student Reviews



More

Academic Training

Informative Articles

Find Jobs

We are Hiring!


All Courses

Choose a category

Loading...

All Courses

All Courses

logo

Week 11- Assembly Workbench

OBJECTIVE: To create a quick return mechanism and CV joint parts in the part workbench or generative workbench and assemblethem following all the guidelines.SOFTWARE USED: CATIA V5.INTRODUCTION:a) QUICK RETURN MECHANISM:A quick return mechanism is an apparatus to produce a reciprocating motion in which the time is taken…

Project Details

Loading...

Leave a comment

Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.

Please  login to add a comment

Other comments...

No comments yet!
Be the first to add a comment

Read more Projects by Mohammed Viquaruddin Khan (15)

Week 3 - Solving second order ODEs

Objective:

Simple PendulumAim:Solving a second order ordinary differential equation of simple pendulum and showing the effect of damping by an animation.Objective:To convert second order ordinary differential equation to 1 order ordinary differential equation.To create the function using MATLAB in-built function for solving ordinary…

calendar

09 Oct 2021 06:38 PM IST

  • MATLAB
Read more

Week 11- Assembly Workbench

Objective:

OBJECTIVE: To create a quick return mechanism and CV joint parts in the part workbench or generative workbench and assemblethem following all the guidelines.SOFTWARE USED: CATIA V5.INTRODUCTION:a) QUICK RETURN MECHANISM:A quick return mechanism is an apparatus to produce a reciprocating motion in which the time is taken…

calendar

19 Jul 2021 05:08 PM IST

Read more

Week 9 - Project - Master Section Development

Objective:

B-PILLAR MASTER-SECTION WITH ALL THE ATTACHMENT FEATURES

calendar

23 May 2021 04:54 PM IST

Read more

Week 9 - Attachment Feature Creation - Challenge 2

Objective:

OBJECTIVE - To create the attachment features screw boss and dog house on the coin holder using the given design rules. PROCEDURE -1)TOOLING AXIS :The tool axis is the parameter which decides whether the tool enters into mould or not as as it denotes the draft clearance anglewhere a moulded part is easily removed from…

calendar

31 Mar 2021 02:41 PM IST

Read more

Week 9 - Attachment Feature Creation - Challenge 1

Objective:

Objective: The main purpose of the challenge was to create the RIB of the Class-B surface, Class-C surface with the given ClassA surface and performing the draft analysis by creating the tooling axis of the plastic component by taking the thickness of 2.5mm of the surface. Tooling axis creation process:The first step of…

calendar

24 Mar 2021 02:02 PM IST

Read more

Door Arm Rest Week 8 Challenge

Objective:

Aim:To Create the Class B and Class C surfaces form the given class A surface of the door arm rest and to Draft analysis the surfaceof the given model. Procedure:1. Check for any kind of surface openings using the boundary feature. Fix the open surfaces if any.2. Create two tooling axes for the component as shown below.The…

calendar

20 Mar 2021 01:41 PM IST

    Read more

    Week 8 - Challenge 5 - Core & Cavity Design

    Objective:

    AIM:To create a Door arm rest switch bezel from the given A class surface by adding a thickness of 2.5 mm to it and to create theCore and cavity blocks for the switch bezel. PROCEDURE: 1)Tooling AxisTooling axis is nothing but the direction in which the core and cavity opens and closes. Design engineer works is to analyse…

    calendar

    18 Mar 2021 10:46 AM IST

    Read more

    Week 8 - Challenge 4 - Coin Holder Design

    Objective:

    AIM:To create Center Console Coin Holder and add thickness to it and generate the Draft Analysis on a solid surface.PROCEDURE:1.Check for any openings in the given Center Console Coin Holder model by using BOUNDARY. In BOUNDARY > select edges -select the surface to create the boundary at the openings.BISECTING METHOD:CREATING…

    calendar

    17 Mar 2021 12:45 PM IST

    Read more

    Week 8 - Challenge 3 - Switch Bezel Design

    Objective:

     AIM: to make a model from the provided class-A surface.INTRODUCTION:CLASS-A SURFACE: a surface made by the designer which is given as an input to the plastic modeler to work on. It is aestheticsurface and the outer most surface.CLASS-B SURFACE: a surface below a certain thickness from the class-A surface is class-B…

    calendar

    10 Mar 2021 01:23 PM IST

    Read more

    Week 8 - Challenge 2 - Base Bracket Design

    Objective:

     Aim :Create the Base Bracket Plastic component through the given Class-A surface. To begin with, the tooling axis for the givenClass-A Surface should be created meeting the requirements of the draft angle and at the end perform the Draft analysis on themode. MODEL:- CLASS A SURFACE: CLASS B SURFACE: CLASS C SURFACE:…

    calendar

    06 Mar 2021 02:08 PM IST

    Read more

    Week 8 - Challenge 1 - Draft Analysis on a Fan Cover

    Objective:

    AIM :Creating the draft analysis and the tooling axis creation the way of creating the tooling axis particularly the Bisectingmethod.Objective:1. To ensure proper tree structure is followed.2. Geometrical sets should have a proper name based on the sketches present inside of them.3. All the sketches should be created under…

    calendar

    05 Mar 2021 11:37 AM IST

    Read more

    Week - 4

    Objective:

    1) Washing machine AIM :1. To Implement control logic of a “washing machine” using Stateow as per given sequence.2. Make a Simulink chart for the “Gear shift” logic as per given conditions.OBJECTIVE : 1. In Simulink, Implement the Control Logic of a Washing Machine using State Flow as per given…

    calendar

    01 Jan 2021 04:20 PM IST

      Read more

      Week -2

      Objective:

      AIM: To make a Simulink model of doorbell using solenoid block and to make a Simulink model of a thermistor to sense the temperature of heater and turn onor turn off the fan as per the temperature conditions. DOORBELL USING SOLENOID:The Solenoid is a electromagnet. On passing current through the conducting wires a magnetic…

      calendar

      28 Dec 2020 07:27 AM IST

        Read more

        Week 6- Challenge

        Objective:

        Objective, Cad model image, Procedure with required images, Results and Final model imageObjective:-To create a component with the assigned quality criteria and giving specific thicknessQuality Criteria Value1.Aspect Ratio= 52.Skewness=453.Warping=154.Taper=0.55.Min. Length=2mm6.Max. Length=8mm7.Min angle Quad=458.Max…

        calendar

        20 Nov 2020 05:04 AM IST

          Read more

          Week 4- Challenge

          Objective:

          Objective, Cad model image, Procedure with required images, Results and Final model image OBJECTIVE:- To create 1-D elements from a simple bracket using the given data such as cross-section and DOF for Bar,rods and beams. CAD MODEL:-  PROCEDURE:- 1. Importing the .hm file from the computer to Hyperworks…

          calendar

          30 Oct 2020 06:49 AM IST

            Read more
            Showing 1 of 15 projects