Usage of Navigation tool , Timeliner and Clash Detection test using Naviswork
1) Use the Architecture/ Structure Project file developed by you in Week 6 to 8. Export the Revit architecture and structure model to Navisworks Cache file following the export settings discussed in class
AIM- TO EXPORT ARCHITECTURAL AND STRUCTURAL PROJECT INTO NAVISWORK
PROCEDURE-
GO TO REVIT AND OPRN THE PROJECT
GO TO EXPORT THE REVIT FILE INTO NWC FORMAT
GO TO FILE TAB
THEN GO TO EXPORT OPTION
THEN SELECT THE NWC OPTION THEN EXPORT THE FILE AS NWC FORMAT

NOW CLICK ON NAVISWORK MANAGE
THEN GO TO FILE TAB
THEN GO TO OPEN
THEN SELECT THE NWC FILE
CLICK ON OPEN

2) Use Navigate Tool to walk around the model and walk through the rooms created and record your moving as animation in your Navisworks file
AIM- TO USE NAVIGATE TOOL TO WALK AROUND THE MODEL AND WALK THRUOGH THE ROOMS CREATED
PROCEDURE-
TO OPEN THE NAVISWORKS MODEL
DOUBLE CLICK ON THE NAVISWORKS MANAGE
THEN GO TO FILE TAB
THEN GO TO OPEN
THEN SELECT THE NWC FILE
CLICK ON OPEN
GO TO VIEW POINT TAB
CLICK ON THE PAN
TO ADJUST THE VIEW
CLICK ON SAVE VIEW POINT
RENAME AS YOUR REQUIRED
SELECCT WALK TO CREATE THE DIFFERENT VIEW POINTS LIKE THIS





3) Use Navigate tool to use Realism feature to walk through the model and record your moving as animation in Navisworks file
AIM- USE NAVIGATE TOOL TO USE THE REALISM FEATURE TO WALK THE MODEL AND RECORD YOUR MOVING AS ANIMATION IN THE NAVISWORK FILES
PROCEDURE-
DOUBLE CLICK ON THE NAVIWORKS MANAGE
THEN GO TO FILE TAB
THEN GO TO OPEN
THEN SELEC T THE NWC FILE
CICK ON OPEN
GO TO VIEW POINT TAB
CLICK ON THE PAN
TO ADJUST THE VIEW
CLICKN ON SAVE VIEW POINT
RENAME AS YOUR REQUIRED
SELECT WALK TO CREATE THE DIFFRENT VIEW POINTS LIKE THIS





4) Embed both architecture and structure *.nwc file to your Navisworks file. Create a clash detection test between the two models
a. Run the Clash Detection Test
b. Study the clashes between the two models
c. List which of the clashes could be approved
d. List which of the clashes could be neglected ( will be taken care later)
e. List which of the clashes can be resolved
f. Save the results after color coding the clashes to the Navisworks file
g. In case of resolution annotate the clash and save the view to defined views in Navisworks
AIM- TO EMBED BOTH ARCHITECTURE AND STRUCTURE NWC FILE
PROCEDURE-
TO OPEN REVIT CLICK ON THE PROJECT REQUIRED
GO TO FILE TAB
THEN GO TO EXPORT OPTION
THEN SELECT THE NWC OPTION
THAN EXPORT THE FILE AS NWC FORMAT
DOUBLE CLICK ON THE NAVISWORKS MANAGE
THEN GO TO FILE TAB
THEN GO TO OPEN
THEN SELECT THE NWC FILE
CLICK ON OPEN
GO TO APPEND IN HOME TAB
THEN SELECT THE STRUCTURAKL PROJECT NWC FILE
TO ATTACH TRHE STRUCTURAL FILE
CLICK ON CLASH DETECTION TEST IN HOME TAB
CLICK ON ADD TEST
SELECT DRAWING AS SHOW FIGURE
CLICK ON RUN TEST




5) Using the Timeliner feature in Navisworks prepare a schedule for the project developed in week 6 to 8 by adding reasonable assumptions for task start date and end date and simulate the task completion as a visual simulation. Record it and save the timeline simulation to Navisworks file
AIM- TO USE THE TIME LINER FEATURE IN NAVISWORK TO PREPARE A SCHEDULE FOR THE PRTOK=JECT DEVELOPED IN WEEK 6 TO 8 BY ADDING REASONABLE ASSUMMPTIOPNS
PROCEDURE-
GO TO TIMELINER IN HOME TAB
THE OPEN THE SEWLECT TREE AS FOLLOWS
GO TOI ADD TASK AND GIVE THE NAME AS U REUIRE
SET THE PLANNED START DATE AND ACTUAL END DATE SET THEN TYPE AS REQUIRED
TTACH THE COMPOONENTS FROM THE SELECTION
GO TO ATTACH CURRENT SELECTION
REPEAT THE PROCESS AND ADD ALL THE OTHER TASK ADD THEM TO THE SELECTION
THEN GO TO SIMULATE OPTION ON TIME LINER TAB
CLICK ON PLAY AND RECORD