Challenge

Usage of Collaborate tool in REVIT

1)

AIM: To set the base point of the project using manage tab and project shared coordinates for the project.

PROCEDURE:

  • open the revit file.
  • type VG command
  • switch on the project base point and survey point,then click ok.
  • Select the architectural tab and click on the grids and draw the required grids.
  • Then rename the grids accordingly.

RESULT: Base point of the project is created under the manage tab and shared coordinates for the project.

2)

AIM:To create a structural template and copying the parameters from architectural to structural template.

PROCEDURE:

  • create a new file using structural template.
  • click project parameter under the manage tab
  • and click on name and select structural.
  • filter architecture tool and select all.
  • then select structural and modify.

RESULT: structural template is created and parameters are copied from architectural to structural template.

3)

AIM: To make the central model of the architectural template using collaborate tab.

PROCEDURE:

  • open the revit file
  • select the collaborate tool
  • and select collaborate and select within the network and click ok.

RESULT: Central model of the architectural template is made using collaborate tool.

4)

AIM:To create the grids longitudinal and transverse pattern for the project similar to the task done in week 2.

PROCEDURE:

  • Open the architectural template
  • And select architectural tab and select the grids.
  • pick line and set the offset value as 20'.
  • draw the longitudianal and transverse grids and name them accordingly.

RESULT: Pattern of longitudinal and transverse grids are drawn accordingly.

5)

AIM: To synchronize the changes from the local copy to the central file of architectural model.

PROCEDURE:

  • open the revit file
  • click on collaborate tab and click collaborate
  • click workset and click synchronise with central tool.
  • click ok

6)

AIM: To open the structural model and using collaborate tools to save the model as a central file.

PROCEDURE:

  • Open the file which is created as structural template.
  • click on collaborate and then workset
  • choose within the network option, click ok
  • click synchronise with central tool under manage tab and click ok.

7)

AIM:To copy the grids and levels from the architectural model to the structural model using the copy monitor tool.

PROCEDURE:

  • Open the architectural file which is created earlier.
  • Add the structural model to the current project using manage link option under the manage tab
  • click copy monitor tool under the collaborate tab and select choose link
  • select the copy option
  • and copy the required objects and click ok
  • hence the objects from architecture to structure model completed successfuly.

RESULT : grids and levels are copied from architectural to structural m

8)

AIM: To create construction template and to link both architectural and structural model using manage links which is under the manage toolbar.

PROCEDURE:

  • open the new file with construction template
  • and save it as central file using collaborate tab
  • Select manage tab and select manage links and select both architectural and structural models and click ok
  • then combined file is opened.

RESULTS:

9)

Yes ,grids from structural and architectural are matching.

10)

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.