DRAWINGS to be carried out during the various construction phase include:

  1. Layout Plan of Grids & Column: firstly, Reference Grids lines are marked at the site in both the perpendicular direction & dimensioning of components should be carried out from all grid lines drawn with Reference GRID LINES.

this drawing is done only for marking the position of column & footing in the plan.

  1. LAYOUT plan of FOOTING & Column Placement: this drawing helps in Excavation of soil at the site as per requirement.

Always keep this plan in mind as change in drawing may be required at this phase.

If two columns zone are overlapping in their footing area, Revision of drawing should be done in consultation to structural engineer.

In case property line is not perfectly aligned as per Geometry, then Comes the intelligence of site engineer to execute the work.

  1. COLUMN SCHEDULING WITH R/F DETAILS:

This Drawing Contains the marking of FOOTING & COLUMN as per plan with Grid lines drawn to scale.

it carries the reinforcement Details of Footing with Specific Nomenclature.

Thickness of Sand filling, Cover of PCC Under & along(offset) the RCC course is mentioned along with necessary R/F details about the Ties, Main R/F bars of column (Starters), Ties spacing & its type.

This Drawing locates the Different Beam location (such as Plinth Beam, Lintels, Tie beams) in a vertical section of a plot.

  1. LAYOUT PLAN OF PLINTH BEAM WITH R/F DETAILS:

After the Compaction & Filling the footing area with compacted earth at its sides, Plinth beam plan is drawn connecting the column at the plinth level.

this drawing contains the various details of beam whether its main or secondary.

R/f details of the beam, No. of bars of given diameter, placing the bars in a section, & stirrups spacing etc. is mentioned in this drawing.

  1. Layout PLAN OF floor beam under stilt floor with R/F Details:

This drawing mention the Floor plan of Floor beam & its connection with different column along with the Depth of Sunken Slab mentioning in the drawing.

R/F details OF slab is mentioned in this drawing with suitable Ld. over the end & middle support (0.3 Lx in the end span & 0.25Lx in the middle support) as mentioned in IS 456:2000.

  1. HEADROOM & LIFTROOM WITH R/F DETAILS:

It is the most wary, cautious element while executing the work.

Vendors drawing needs should be fulfilled to complete the Structural steel work for carrying out the lift movement.

Different Locations Of beam & its connection over different element are mentioned in the drawing.

Floor Beam Connection with the Lift Cabin at the different floors along with Lintels provided at each floor level door steps.

It mentions the Thickness of Sand filling, PCC work, its offset from the RCC work, RCC work configuration, its chamber dimensions for head & lift level.

Consultation should be done with the Lift vendor to carry out the work as per its machine installation avoiding unnecessary delay as well as wastage of money in reinstallation.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.