REVIT_ Scheduling & Estimation_Week 9
Use the shortcut keys in Revit discussed in class to complete the following tasks and list them below
a. Using 3D model create a section box
b. To create similar doors and windows in a floor plan layout
c. To reduce the thickness of lines visible in plan views
d. To apply override settings to a floor in the model section view
e. To increase the range of visibility in a plan view
f. To select the previously selected items
g. To add annotations to the model views
h. To bring the model elements in line
i. To rotate the model elements
j. To move an object to another location
k. To copy a model element
l. To mirror an element about an axis
m. To create an array of model elements
ANS 1)
The shortcut keys for the above mentioned tasks are :
a. Using 3D model create a section box = BX
b. To create similar doors and windows in a floor plan layout = CS
c. To reduce the thickness of lines visible in plan views = TL
d. To apply override settings to a floor in the model section view = EOD
e. To increase the range of visibility in a plan view = VR
f. To select the previously selected items = CTRL + <- ( CONTROL PLUS LEFT ARROW)
g. To add annotations to the model views = DI
h. To bring the model elements in line = AL
i. To rotate the model elements = RO
j. To move an object to another location = MV
k. To copy a model element = CO
l. To mirror an element about an axis = MM
m. To create an array of model elements = AR
2) Using Revit and the project used from week 6 to 8 prepare a schedule for the following
a. Walls
b. Doors
c. Windows
d. Material – Concrete/Wood
AIM:TO PREPARE A SCHEDULE FOR WALLS DOORS WINDOWS MATERIAL ETC FOR THE PROJECT WHICH WAS CREATED LAST WEEK
TOOLS AND COMMANDS:
- View
- Schedule
- Schedule properties
- Schedule quantities
PROCEDURE:
STEP-1:Open the architectural template which was created in week 6 and week 7 project

STEP-2:Click on view tab and select schedules

STEP-3:
Select schedule quantities from options displayed

STEP-4:Then a dialog box appears then select all require all elements

STEP-5:Seelect components like doors from dialog box and click ok and select the items like height width etc to be diisplay and click ok


step-6:then schedule wiill be dialpyed

STEP-7:Do the same process with walls windows etc
WINDOWS:

WALLS:

Do the same process with materials and if any other required
RESULT: ALL SCHEDULES FOR WALLS DOORS WINDOWS ETC ARE SUCCESFULLY PREPARED FOR PREVIOUSLY CREATED PROJECT FILE
3) Using Revit Calculate area and volume of each room in the model with appropriate room tags applied to each room. Prepare a schedule report for area and volume of each room.
AIM:TO CALCULATE AREA AND VOLUME OF EACH ROOM IN THE MODEL WITH APPROPRIATE ROOM TAGS APPLIED TO EACH ROOM AND TO PREPARE A SCHEDULE REPORT FOR AREA AND VOLUME OF EACH ROOM
TOOLS AND COMMANDS:
- View
- Schedules
- Schedules/Qunatities
- area
- volume
PROCEDURE:
STEP-1:Open the architectural template which was created in week 6 and week 7 project

STEP-2:Click on view tab and select schedules

STEP-3:
Select schedule quantities from options displayed

STEP-4:Then a dialog box appears and select room from that click ok


STEP-5:Select area and volume name count

STEP-6:then area schedule is displyed

STEP-7:to calculate volume select calculate tab from tab

STEP-8: A dialog box appears then fill the details like entering formula

STEP-9:Click ok

RESULT:A SCHEDULLE OF AREA AND VOLUME OF EACH ROOM IS SUCCESFFULLY PREPARED AND AREA AND VOLUME EACH ROOM IS CALUCULATED BY ROOM TAG
4) Using the same schedule using the unit cost rate for materials available in the internet, prepare total cost of materials used in the project
a. Total Cost of Materials
b. Individual Material Take off
AIM: TO PREPARE TOTAL COST OF MATERIALS AND INDIVUDUAL MATERIALS TAKE OFF SCHEDULE
TOOLS AND COMMANDS:
- View
- Schedules
- Schedules/Qunatities
- area
- volume
- Total cost materials
PROCEDURE:
STEP-1:Open the architectural template which was created in week 6 and week 7 project

STEP-2:Click on view tab and select schedules

STEP-3:
Select schedule quantities from options displayed

STEP-4:Then a dialog box appears and select material option from that click ok

STEP-5:Select require elements to prepare schedule

STEP-6:Click ok
STEP-8:To caluculate total cost select calculations tab

STEP-9:A dialog box apperas then fill the require details

STEP-10:Click ok
STEP-11: wall material total cost schedule is prepared

STEP-12:Now select the view tab and choose materials take off

STEP-13:Adialog box appears select required materials LIKE DOORS and click ok


STEP-14:Then material take off schedule will be displayed

STEP-15: Do the same process with other material take off

WALL TAKE OFF SCHEDULE:

Furniture materials take off sxhedule:
RESULT:ALL INDIVUDUAL MATERIAL TAKE OFF AND TOTAL COST OF MAYTERIALS SCHEDULE IS SUCCESSFULLY PREPARED
5) Using the concept of Visual Programming discussed in class, list a flowchart for the following scenario
a. How to decide framings for a structure using Dynamo ?
b. If there is no water coming from the pipes
c. If request for money from client has been declined for the project
A)

B)

C)

6) List the parameters associated with each model element
a. Wall
b. Floor
c. Door
d. Window
e. Table
f. Building
WALLS :
Type of wall.
Length of wall.
Width of wall.
Height of wall.
Cost estimate for wall.
Thickness of wall.
Material used for the wall.
b) FLOOR :
Type of floor.
Length of floor.
Width of floor.
Area of floor.
Volume of floor.
Cost of floor.
Thickness of floor.
c) DOOR :
Height of door.
Width of door.
Length of door.
Thickness of door.
Material.
Type of door.
d) WINDOW :
Height of window.
Width of window.
Length of window.
Thickness of window.
Material.
Type of window.
e) TABLE :
Length of table.
Width of table.
Height of table.
Material of table.
Type of table.
Purpose of table.
f) BUILDING :
Height of building.
Type of building.
Length of building.
Width of buuilding.
No:of floors.
Area of building.
Set back of building.