REVIT_Revision w.r.t to code_Week 5
1) Why are building codes or standards essential for the modeling/ efficiency of drawings in Revit ?
* project Approval sign importent for excute the project. Approval autherity checkup a project drawing are depend by Building codes or standard codes.
2) From the National Building Code list the groups that will be essential to you when you begin modeling in Autodesk Revit.
*From the National building code Group10 will be essential for modeling in reit.
3) List the five major steps that occur in project cycle . The steps should include from conceptualization of project to maintenance and final stage.
* Draw the project plan and take the approval of project plan.
* Explain the full details of project to clint or owner of project .
* Estimate the material quantity and total cost of project.
* Excute the project and follow the planning.
* Check the project is going in the right direction as planed.
* Handover the project to clint between the end of agreement time.
4) Give examples of different disciplines involved in construction of a project
* Architectural engineerr for draw the plan and exterial design.
* Structural Engineer for design the members.
* Excute civil engineer for excute the plan and comlete it.
* Electrical engineer for fix the electrical fixtures.
* Mechanical engineer.
5) How are buildings classified ? Place the following buildings under each category
a. Four unit apartments
b. School with capacity of 1000 students
c. A single unit shop.
d. Multi story Shopping complex
e. Steel machine factory
a. Four unit apartments
* Classify the Resitential building category.
b. School with capacity of 1000 students
* Classify the commercial public building category.
c. A single unit shop.
* Classify the commercial building .
d. Multi story Shopping complex
* Classify the commercial public building.
e. Steel machine factory
* Classify the Industrial building category.
6) Distinguish the roles of Design team and Management team
Design Team:
* planning ,structural design,plumping,electric fixtures all the design deciplines are under the design team.
* Design team co-ortinate to the managing team or project team in project excute stage.
* To coaprate the management team starting stage to finishing stage of project.
Management Team:
* Management team mtoniting the cost and design specification .
* This team excute the project under the design.
* Face the all the problems between project starting stage to finising stage and solve it with design deam.
7) Refer to NBC, Identify the modeling requirements for the project ( from week 4).
a. Height Limitations
b. Area Limitations
c. Room sizing
d. Wall height
e. Thickness based on fire life and safety
f. Passageway requirements
a. Height Limitations:
* Height of hapital rooms in residential building not less then 2.75 meter.
* Height of kitchen not less then 2.75 meter.
* Height of bathrooms not less then 2.1 meter.
* Height of store room not less then 2.2 meter.
b. Area Limitations:
* Area of hapital room not less then 9.5 square meter.
* Area of kitchen not less then 5 square meter.
* Area of bathroom not less then 1.8 square meter.
8) We have identified requirements for modeling from question 7, Use these numbers from code book and verify the numbers used in modeling the unit from week 2 to week 4. If the numbers are not reasonable, use the numbers obtained from the code book to create a revision of the mode.
This model resembles the actual modeling requirements for Project 1 of course work