Menu

Executive Programs

Workshops

Projects

Blogs

Careers

Student Reviews



More

Academic Training

Informative Articles

Find Jobs

We are Hiring!


All Courses

Choose a category

Loading...

All Courses

All Courses

logo

Project 2

QUESTION :  Develop general arrangement for the RC office building. Analyze and design the building as per IS standard code in TEKLA STRUCTURAL DESIGNER. Refer the attached plan and elevation. The building to be designed for dead, live, wind and seismic loading. Report of each member to be generated and extract drawings…

Project Details

Loading...

Leave a comment

Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.

Please  login to add a comment

Other comments...

No comments yet!
Be the first to add a comment

Read more Projects by POLA LAVAKUMAR (23)

Vasavi_External Exam_Tekla

Objective:

QUESTION : Consider the structure as cladded by steel sheeting and Grade A material is used according to IS 2062 Consider Live, Dead, Wind, and Seismic loading. Even though the height does not exceed 10m, the analysis and manual calculations of wind load need to be done For load calculation kindly refer to IS Codes …

calendar

31 Jul 2021 10:26 AM IST

    Read more

    Project 2

    Objective:

    QUESTION :  Develop general arrangement for the RC office building. Analyze and design the building as per IS standard code in TEKLA STRUCTURAL DESIGNER. Refer the attached plan and elevation. The building to be designed for dead, live, wind and seismic loading. Report of each member to be generated and extract drawings…

    calendar

    18 Jun 2021 06:45 PM IST

    • DESIGN
    Read more

    Week 12 Challenge

    Objective:

    Q1 )   Generate report for the steel building design from challenges 1 – 6 along with the loading summary. ANS 1) AIM : To generate report for the steel building design from challenge 1-6. TOOLS USED : Report. Model report. Show report. PROCEDURE : 1. Open the structure and analyze it.   2. Now click…

    calendar

    17 Jun 2021 03:26 PM IST

      Read more

      Week 11 Challenge

      Objective:

      Q1 )  Design the slab and foundation of the model. Outline the thought process for designing of the elements (column, beam, slab and foundations). ANS 1) AIM : To design the slab and roof foundations of the model and to outline the thought process for designing of the elements. TOOLS USED : Design. Settings.…

      calendar

      16 Jun 2021 05:22 PM IST

        Read more

        Week 10 Challenge

        Objective:

        Q1)  Based on the analysis design RC column and beam. ANS 1) AIM : To design RC column and beams based on the analysis. TOOLS USED : Review. Check member. Static. PROCEDURE : 1. First we have to open the file in which we have completed the structure.   2. Next we have to validate the model in search on any…

        calendar

        13 Jun 2021 07:27 PM IST

          Read more

          Week 9 Challenge

          Objective:

          Q1 ) Generate seismic loading based IS codal provisions and zone II. Any other data you can assume and input accordingly. AIM : To generate seismic loading based IS codal provisions and zone II. Any other data you can assume and input accordingly. TOOLS USED : Load. Loadcases. Seismic wizard. Seismic load. PROCEDURE…

          calendar

          12 Jun 2021 03:40 PM IST

            Read more

            Week 8 Challenge

            Objective:

            Q1 ) Calculate dead load in design report based on IS code and apply dead load on the model Finishes of 50mm Slab thickness as per the design Brick wall load Roofing load ANS 1) AIM : To calculate the dead load based on the design and apply it on the structure. TOOLS USED : MS Excel. Loads. Loadcases. Dead load. Area.…

            calendar

            11 Jun 2021 05:52 PM IST

              Read more

              Week 7 Challenge

              Objective:

              Q1) Setup model for RC building design and based on following parameters for cover. ANS 1)   AIM : To setup model for RC building design and based on following parameters for cover.   TOOLS USED : Tekla software. File. Settings. Structural Defaults.   PROCEDURE : 1. First open a new tekla file for starting…

              calendar

              10 Jun 2021 07:22 PM IST

                Read more

                Project 1

                Objective:

                QUESTION )   Analyze and design a steel building to 10T CRANE as per IS standard code in TEKLA STRUCTURAL DESIGNER. Refer the attached plan and elevation. Provide bracings and moment connection for lateral stability.  Consider dead, live, equipment and wind loading. Consider the brick wall loading for 150mm…

                calendar

                10 Jun 2021 08:02 AM IST

                Read more

                Week 6 Challenge

                Objective:

                Q1 ) Summarize your study for the bending moment, shear force and deflection diagrams for the elements of the model. ANS 1) BENDING MOMENT :  The bending moment can be defined as the bending effect which is caused due to any internal or external force. It is only of the important concept to be studied and…

                calendar

                08 Jun 2021 06:04 PM IST

                  Read more

                  Week 5 Challenge

                  Objective:

                  Q1 )  Generate manual wind loading in the design report based IS code as per the following input Basic wind speed = 39m/s Terrain category 2 ANS 1 : AIM:   Generate manual wind loading in the design report based IS code as per the following input TOOLS USED : Excel. IS codes. Calculator. PROCEDURE :…

                  calendar

                  26 May 2021 09:59 AM IST

                    Read more

                    II. Answer in detail

                    Objective:

                      QUESTION )   Create a G+4 Residential building as per NBC standards and make it a central model file. Your model should contain: The sloped roof at the top level of the building (10 degrees) Architectural components including furniture and home appliances Room tags and Annotations Section cut through each…

                    calendar

                    16 Dec 2020 12:39 PM IST

                      Read more

                      REVIT_Naviswork_Project- 4

                      Objective:

                      QUESTION 1)  Use the Architecture/ Structure Project file developed by you in Week 6 to 8. Export the Revit architecture and structure model to Navisworks Cache file following the export settings discussed in class. ANS 1) AIM : To usse the architecture/structural project file developed from week 6-8. Export…

                      calendar

                      30 Nov 2020 04:02 PM IST

                        Read more

                        REVIT_Dynamo Project- 3

                        Objective:

                        QUESTION 1)  Using Dynamo create a set of sinusoidal points and create a curve and create a surface out of the curve. ANS 1) AIM :   To create a seet of sinusoidal points and create a curve and create a surface out of the curve. TOOLS USED : Dynamo. Code block. Range. Mat.sin. Integer slider. Product…

                        calendar

                        28 Nov 2020 06:29 PM IST

                          Read more

                          REVIT_Revision w.r.t to code_Week 5

                          Objective:

                          QUESTION 1 )  Why are building codes or standards essential for the modeling/ efficiency of drawings in Revit ? ANS 1 )          With the help of revit we can draw, design and model a structure. Only designing or modeling is not the task, we have to follow some basic set of rules and regulations…

                          calendar

                          27 Nov 2020 08:03 AM IST

                          Read more

                          REVIT_3D Rendering of a House plan_Project 1

                          Objective:

                          QUESTION 1)     Based on the project saved from Week 3, proceed from First Floor Level .Model a Ceiling from architecture tab above the walls at first floor level. ANS 1) AIM :       To model a celing to the previously created project with the help of architectural tab above the walls…

                          calendar

                          27 Nov 2020 08:02 AM IST

                            Read more

                            REVIT_Usage of Elements & Properties_Week 3

                            Objective:

                            ANS 1) AIM :            Based on your previous layout add floor using floor option from architecture tab and set the thickness, and draw the grids for the ground plan. TOOLS USED :  Architecture. Floor. Levels. Grids. Material. Thickness. Property browser. PROCEDURE : Open the project…

                            calendar

                            27 Nov 2020 08:00 AM IST

                              Read more

                              REVIT_Introduction to REVIT_Week 1

                              Objective:

                              ANS 1)     AIM:           To form a file menu, create a new project and name the project appropriately.     TOOLS USED: Revit software. file new project     PROCEDURE :  First open revit 2019 software. Then click on file menu and drop down box appears. Then click…

                              calendar

                              27 Nov 2020 07:59 AM IST

                                Read more

                                REVIT_Creation of Basic Drawing_Week 2

                                Objective:

                                ANS 1)         BIM stands for Building Information Modeling. It is a very effective and advanced software which plays a vital role in drafting and planning softwares. BIM is a 3D modelling software which helps us in understanding and explaining about the project. BIM was invoked by autodesk and we can…

                                calendar

                                27 Nov 2020 07:58 AM IST

                                Read more

                                REVIT_ Scheduling & Estimation_Week 9

                                Objective:

                                QUESTION 1)    Use the shortcut keys in Revit discussed in class to complete the following tasks and list them below           a. Using 3D model create a section box           b. To create similar doors and windows in a floor plan layout   …

                                calendar

                                26 Nov 2020 07:38 AM IST

                                  Read more

                                  REVIT_Analysing the building & Report preparation_Week 8

                                  Objective:

                                  QUESTION 1)   What are HVAC systems ? Why are they essential in modeling of buildings? ANS 1)         HVAC system is one of the important component in the modeling of a building. The term HVAC stands for Heating, Ventilation and Air conditioning. Now lets get into these terms, Heating…

                                  calendar

                                  24 Nov 2020 07:58 AM IST

                                    Read more

                                    REVIT_ Plan, 3D View & Structural Drawings_Project 2

                                    Objective:

                                    QUESTION 1)  Select the type of structure you want to build from one of the three below        a. Multi Unit Residential Apartment        b. Office Buildings        c. School ANS 1)      From the above given options the type of structure…

                                    calendar

                                    20 Nov 2020 07:48 AM IST

                                      Read more

                                      REVIT_Usage of Collabrate tool_Week 6

                                      Objective:

                                      QUESTION 1)   Open an architectural template. Using the Manage tab set project base point and project shared coordinates for the project. ANS 1) AIM :  To open an architectural tab and set project base point and project shared cocordinates using manage tab for the project. TOOLS USED : Collaborate.…

                                      calendar

                                      17 Nov 2020 08:33 AM IST

                                        Read more
                                        Showing 1 of 23 projects