   To model and design a proposed Pre Engineered Building Warehouse (Rigid frame structure) using STAAD.Pro with the following technical specifications.

   Procedure:

  • Plan view, elevation views of the Pre Engineered Building are as shown below.

         

     

       

       

       

             

  • We have to model the PEB frame in STAAD.PRO as per the above given drawings. 
  • The modelled PEB frame in STAAD.PRO will appear as shown in the below figure.

           

  • Supports are added to the columns as needed.
  • Releases and specifications are also applied wherever necessary in the modelled frame.

           

  • All the section properties and materials are also applied to all the members respectively as mentioned in the question.

           

  • Calculation of Design Loads on PEB warehouse :-

    • Dead Load
    1. Dead Load on Rafter
    • Weight of Roof Sheet = 5 Kg/m2
    • Weight of Purlin and sag rods = 5 Kg/m2
    • Additional weight = 5 Kg/m2

            Total weight of rafter = 15 Kg/m2

            Dead load on rafter = 15 x 10 x 8 = 1200 N/m = 1.2 kN/m

    1. Dead Load on Purlin = 10 x 10 x 8 = 800 N/m = 0.8 kN/m
    2. Mezz slab self-weight (150 mm thick slab) = 0.15 x 25 kN/m3 = 3.75 kN/m2
    3. Floor finishes and additional load on Mezzaline floor = (150 + 500) kg/m2 = 0.65 kN/m2
    4. Weight of 230mm thick brick wall (4-m height) on Mezzaline floor = 20 kN/m3 x 0.23 x 4 = 18.4 kN/m
    • Live Load
    1. Live Load on roof and canopy = 57 kg/m2 x 10 x 8 = 4.56 kN/m
    2. Live Load on Mezzaline floor = 400 kg/m2 = 4 kN/m2
    • Collateral Load
    1. Collateral Load on Roof
    • Load of electrical fittings = 0.1 kN/m2
    • Load of sprinklers = 0.03 kN/m2
    • Load of rockwool insulation and bubble wrap insulation = 0.15 kN/m2
    • Load of solar panels = 0.15 kN/m2
    • Load of ceiling = 0.1 kN/m2

            Total Collateral load on Roof = 0.53 x 8 = 4.24 kN/m

    1. Collateral Load on Mezzaline floor (due to false ceiling and electrical fittings)

                                                              = 0.2 x 8 = 1.6 kN/m

    1. Collateral Load on column due to bracket beam

            Load due to service line supported on the beam spanning 8 m width= 150 kg/m x 8 x 10 = 12 kN

            Moment acting on column due to service line = 12 x 0.75 = 9 kNm

    1. Collateral Load on jack beam due to service line= 2.5 kN/m
    2. Collateral Load on Mezzaline false ceiling = 3.2 kN/m
    • Wind Load

           Basic wind speed = 39 m/s

           K1 - 1.00

           K2 - 1.05 (Terrain Catogory-1. Building height at eaves = 10.50 m)

           K3 - 1.00

           K4 - 1.00 (For other structures)

           Kd -0.9

           Ka (Rafter) - 0.8 or as per tributary area.

           Ka (Column) - 0.8245 or as per tributary area.

           Ka (Purlin) - 0.9721 or as per tributary area.

           Ka (Side Runner) - 0.978 or as per tributary area

           Kc -0.9

           Design wind pressure = pd = kd x ka x kc x 0.6 x (Vb x k1 x k2 x k3 x k4)2 = 0.652 kN/m2

           But should not be less than 0.7 Pz = 0.7 x 1.006 = 0.704 kN/m2

           Cpe - As per table 5 & 6 of IS: 875 (Part 3) – 2015

           h/w = 10/60 = 0.6

           L/w = 170/60 = 2.83

    Cpe On wall:

    Direction

    A

    B

    C

    D

    0 deg.

    0.7

    -0.25

    -0.6

    -0.6

    90 deg.

    -0.5

    -0.5

    0.7

    -0.1

    Cpe On Roof:

    Roof angle = 2.86

    Direction

    EF

    GH

    EG

    FH

    0 deg.

    -0.86

    -0.4

    90 deg.

    -0.8

    -0.4

    Cpi = 0.2

    Wind Load on Columns = (Cpe – Cpi) x A x Pd

    Wind about X Direction + Cpi on Wall A = (0.7 – 0.2) x 8 x 0.704 = 2.816 kN/m 

    Wind about X Direction + Cpi on Wall B = (-0.25 – 0.2) x 8 x 0.704 = -2.534 kN/m 

    Wind about X Direction + Cpi on Wall C & D = (-0.6 – 0.2) x 6.75 x 0.704 = -3.802 kN/m 

    Wind about X Direction - Cpi on Wall A = (0.7 + 0.2) x 8 x 0.704 = 5.069 kN/m 

    Wind about X Direction - Cpi on Wall B = (-0.25 + 0.2) x 8 x 0.704 = -0.282 kN/m 

    Wind about X Direction - Cpi on Wall C & D = (-0.6 + 0.2) x 6.75 x 0.704 = -1.9 kN/m 

    Wind about Z Direction + Cpi on Wall A = (-0.5 – 0.2) x 8 x 0.704 = -3.942 kN/m 

    Wind about Z Direction + Cpi on Wall B = (-0.5 – 0.2) x 8 x 0.704 = -3.942 kN/m 

    Wind about Z Direction + Cpi on Wall C = (0.7 – 0.2) x 6.75 x 0.704 = 2.376 kN/m 

    Wind about Z Direction + Cpi on Wall D = (-0.1 – 0.2) x 6.75 x 0.704 = -1.425 kN/m 

    Wind about Z Direction - Cpi on Wall A = (-0.5 + 0.2) x 8 x 0.704 = -1.689 kN/m 

    Wind about Z Direction - Cpi on Wall B = (-0.5 + 0.2) x 8 x 0.704 = -1.689 kN/m 

    Wind about Z Direction - Cpi on Wall C = (0.7 + 0.2) x 6.75 x 0.704 = 4.276 kN/m 

    Wind about Z Direction - Cpi on Wall D = (-0.1 + 0.2) x 6.75 x 0.704 = 0.475 kN/m 

    Wind Load on Rafters = (Cpe – Cpi) x A x Pd

    Wind about X Direction + Cpi = (-0.86 – 0.2) x 8 x 0.704 = -5.970 kN/m on Side A Rafter

    Wind about X Direction + Cpi = (-0.4 – 0.2) x 8 x 0.704 = -3.378 kN/m on Side B Rafter

    Wind about X Direction - Cpi = (-0.86 + 0.2) x 8 x 0.704 = -3.716 kN/m on Side A Rafter

    Wind about X Direction - Cpi = (-0.4 + 0.2) x 8 x 0.704 = -1.125 kN/m on Side B Rafter

    Wind about Z Direction + Cpi = (-0.8 - 0.2) x 6.75 x 0.704 = -4.752 kN/m Side C Rafter

    Wind about Z Direction + Cpi = (-0.4 - 0.2) x 6.75 x 0.704 = -2.851 kN/m Side D Rafter

    Wind about Z Direction - Cpi = (-0.8 + 0.2) x 6.75 x 0.704 = - 2.851kN/m Side C Rafter

    Wind about Z Direction - Cpi = (-0.4 + 0.2) x 6.75 x 0.704 = -0.950 kN/m Side D Rafter

    Wind Load on Canopy :

    Cp - As per table 8 of IS: 875 (Part 3) – 2015

    Roof Angle 2.86 deg.

    Cp -ve = 1.08

    Cp +ve = 0.35

    Wind Load on Canopy (Upward) = 1.08 x 8 x 0.704 = 6.082 kN/m

    Wind Load on Canopy (Downward) = 0.35 x 8 x 0.704 = 1.971 kN/m

  • Seismic Load :
  • As per IS: 1893 - 2016

    Seismic zone - III - Z = 0.16

    Rf - 4.0

    I - 1.0

    SS - 3.0

    25% of Live Load on roof is considered for calculation of seismic forces.

    100% of collateral load on roof is considered for calculation of seismic forces.

    50% of (Live load + Collateral load) on mezzanine floor is considered for calculation of seismic forces.

    100% of Dead load is considered for calculation of seismic forces.

  • Loading has been applied on the model.

          

  • Load on the modelled structure can be seen as shown below in the figures.

           

  • All the load combinations are applied on the model wherever necessary.

          

    Design Parameters:

  • IS 800 LSD
  • FYLD = 345000 for portal frame and mezz beams
  • FYLD = 250000 for bracings
  • Beam = -1
  • STP = 2 for welded sections
  • Main = 250 for tie beam
  • Ly = Lx = 1.5m for rafter
  • Ly = Lx = 3.25m for columns
  • Ly = Lx = 4.4m for columns supporting canopy
  • Lz = 11m for internal columns
  • Ly = Lx = 0.5m for mezz floor beams
  • Lz = 6.75m for mezz floor beams
  • Ly = 1.7m for canopy beam
  • Ratio = 1

     Now, the above design parameters have to be applied on the PEB structure.

  • Run the  analysis on the PEB structure and check for errors.
  • Stop any more modelling only after we see no errors after doing the analysis of the PEB warehouse.

    Result: 

    PEB Warehouse has been succesfully modelled and designed with the needed load cases and the specifications. Also analysis has been performed with no errors.

Your portfolio, next

Ship work like this
in your own course.

Talk to a career counsellor

Free 20-minute call. We'll map the right course to where you want to work.

By submitting you agree to our Terms and Privacy Policy.