Menu

Executive Programs

Workshops

Projects

Blogs

Careers

Student Reviews



More

Academic Training

Informative Articles

Find Jobs

We are Hiring!


All Courses

Choose a category

Loading...

All Courses

All Courses

logo

Project 1 - V&V SW Analysis - I

Write a Test plan to test features of a new mobile phone (Blackbox test) that needs to be implemented based on the following requirements. (The product is still under development stage and is yet to be UA (User Acceptance ) tested…

    Project Details

    Loading...

    Leave a comment

    Thanks for choosing to leave a comment. Please keep in mind that all the comments are moderated as per our comment policy, and your email will not be published for privacy reasons. Please leave a personal & meaningful conversation.

    Please  login to add a comment

    Other comments...

    No comments yet!
    Be the first to add a comment

    Read more Projects by Nishchal. Dawane (20)

    Project 1 (Mini Project on Vehicle Direction Detection

    Objective:

    Identifying the direction of the vehicle is one of the important & diverse features in Autonomous driving & Advanced Driver Assistance Features. This particular sub-feature of identifying the direction of vehicle is basically identifying the direction the vehicle is taking based on the camera input.   Objective of Project:…

    calendar

    06 Aug 2022 02:14 PM IST

    • MATLAB
    • MBD
    Read more

    Final Project: Design of an Electric Vehicle

    Objective:

    Create a MATLAB model of electric car which uses a battery and a DC motor. Choose suitable blocks from Powertrain block set. Prepare a report about your model including following: Objectives:         1. System level configurations        2. Model parameters      …

    calendar

    03 Aug 2022 10:06 AM IST

    Read more

    Project 1 Mechanical design of battery pack

    Objective:

    Objective:  battery pack capacity=18 kwh cell= ANR 26650M1-B prepare a detailed battery pack drawing along with its enclosure. State your assumption. Nano phosphate High Power Lithium-Ion Cell: ANR 26650M1-B   A123  high-performance Nano phosphate lithium iron phosphate (LiFePO4) battery technology delivers…

    calendar

    03 Aug 2022 04:51 AM IST

    Read more

    Week 7 State of charge estimation

    Objective:

    1.Simulate the 3 test cases from harness dashboard and write a detailed report on the results https://in.mathworks.com/matlabcentral/fileexchange/72865-design-and-test-lithium-ion-battery-management-algorithms downloading model from this URL Model file open: in the above file shows the dashboard following blocks shows:…

    calendar

    22 Jul 2022 03:01 AM IST

      Read more

      Week 1 Understanding Different Battery Chemistry

      Objective:

      1.Prepare a table which includes materials & chemical reactions occurring at the anode and cathode of LCO, LMO, NCA, NMC, LFP and LTO type of lithium ion cells.Give your detailed explanation on it Lithium ion battery is a type of rechargeable battery composed cells in which lithium ions moves from the negative electrode…

      calendar

      17 Jun 2022 06:31 PM IST

        Read more

        Project-1: Powertrain for aircraft in runways

        Objective:

        Part A: 1. Search and list out the total weight of various types of aircrafts.  Part A: 1. Search and list out the total weight of various types of aircrafts.  The aircraft has following weight: Payload weight: it is load carrying capacity of an aircraft including passenger, extra fuel and cargo, but if it is…

        calendar

        12 Jun 2022 11:21 AM IST

          Read more

          Project 2 - V&V SW Analysis II

          Objective:

          1. Perform Static Code Review Analysis for “C:\**\LDRA_workarea\Examples\C_tbrun_examples\Ggrocers.c” (Single .c file), modify the Code to remove violations and make compliant to MISRA: C 2012 & CERT standards. Generate Code review report compliant to MISRA: C 2012 Coding Standards Generate Code review…

          calendar

          29 May 2022 04:47 AM IST

            Read more

            Project 1 - V&V SW Analysis - I

            Objective:

            Write a Test plan to test features of a new mobile phone (Blackbox test) that needs to be implemented based on the following requirements. (The product is still under development stage and is yet to be UA (User Acceptance ) tested…

            calendar

            29 May 2022 04:34 AM IST

              Read more

              Week-11 Challenge: Braking

              Objective:

              (1) For a defined driving cycle, calculate the energy required for braking. Answer:  DRIVING CYCLE: driving cycle is a series of data points representing the speed of a vehicle versus time. Driving cycles are produced to assess the performance of vehicles in various ways, including fuel consumption and polluted…

              calendar

              23 May 2022 10:32 AM IST

              Read more

              Project 2 - Measuring distance of an object using ultrasonic sensor (HC-SR04)

              Objective:

               Measuring distance of an object using ultrasonic sensor (HC-SR04) Component used: display ground ATmega32 ultrasonic sensor  oscilliscope   CODE: /* * PROJECT_2.c * * Created: 5/5/2022 12:12:21 PM * Author : nickd */ #include <avr/io.h>#define F_CPU 16000000ul#include <util/delay.h>#include…

              calendar

              20 May 2022 09:22 AM IST

                Read more

                Project 1 - Controlling a DC motor using PWM and monitoring its Running status

                Objective:

                Implement a system on the simulator for controlling a DC motor using L293 motor driver, monitor its status and print the running status of motor on the LCD Display. Component used in simulIDE:  Display, DC motor, L293 motor drive, Switch, ATmega32, fixed volt,Ground. Goals: Implement a system on simulator for Controlling…

                calendar

                13 May 2022 02:03 PM IST

                  Read more

                  Project 2 - Implement the Code for controlling the retraction and extension of Airplane’s landing gear

                  Objective:

                  PROJECT 2: Overview of the Project: (5 to 6 lines) In this project, controlling the retraction and extension of Airplane’s landing gear can be implemented using Finite State Machine (FSM). FSM is the most efficient algorithm which is mathematical model of computation. Goals ( 2 to 3 points) Controlling the direction…

                  calendar

                  23 Apr 2022 09:48 AM IST

                    Read more

                    Project 1 - Creation of user defined data type to implement the user interfaces for working with ‘Set’ (Mathematical Set theory)

                    Objective:

                    CODE: H file code: #ifndef LIST_H_#define LIST_H_ #include<stdio.h>#include<stdlib.h>#include<stdbool.h> // define the node typedef struct node{ int data; struct node *next;}Node; static Node *head1,*head2,*head,*head,*head_union,*head_intersection,*newnode,*tail,*res_union,*res_intersection; // define…

                    calendar

                    05 Apr 2022 11:16 AM IST

                      Read more

                      Week-7 Challenge: DC Motor Control

                      Objective:

                      (1)  A. Explain a MATLAB demo model named ‘Speed control of a DC motor using BJT H-bridge’. Working:  In the above DC motor using BJT H bridge model voltage is generated from the pulse generator giving the input supply and duty cycle is assigned in pulse genrator. the switch block is connected to…

                      calendar

                      12 Mar 2022 01:30 PM IST

                      Read more

                      Week-6 Challenge: EV Drivetrain

                      Objective:

                      (1) Which types of power converter circuits are employed in electric and hybrid electric vehicle? Hybrid electric vehicle: HEV is the hybrid vehicle that’s combine electric motor system with internal combustion engine. The presence of electric powertrain to achieve better fuel economy or better performance. All energy…

                      calendar

                      08 Mar 2022 11:37 AM IST

                      Read more

                      Week-4 Challenge WOT Condition Part-2

                      Objective:

                      (1) What is the difference between mapped and dynamic model of engine, motor and generator? How can you change model type?  Mapped model: It is a prebuilt model in the powertrain block. consists data prebuilt lookup table is deal with mapped model. It is used in steady state lookup table to engine performance. In…

                      calendar

                      03 Mar 2022 07:37 AM IST

                      Read more

                      Week-3 Challenge: ADVISOR Tool

                      Objective:

                      Aim: Use the advisor tool and simulate following condition CONDITION: For EV_defaults_in file, if cargo mass is 500 kg with all other default conditions, can the vehicle travel for 45 km with FTP drive cycle? Conclude your observations. Simulation process: After opening the advisor tool firstly loaded load file as EV_default_in…

                      calendar

                      25 Feb 2022 12:17 PM IST

                        Read more

                        Project

                        Objective:

                        AIM: To study and analyze different model of BAJA ATV (ALL TERRAIN VEHICLE) MODEL using matlab Simulink. BAJA ATV MODEL: BAJA CVT MODEL BAJA CVTR MODEL BAJA CVT MODEL WITH DASHBOARD BAJA CVT MAPPED WITH LOOKUP TABLE BAJA CVT RATIO WITH LOOKUP TABLE ATV:  All terrain vehicle is a three and four wheeler vehicle. It…

                        calendar

                        18 Feb 2022 11:47 AM IST

                          Read more

                          Week - 4

                          Objective:

                          Question:  implement control logic of a “washing machine” using stateflow as per given sequence: if the power supply is available, the system gets activated if the water supply is not available, stop the process & indicate through led soaking time should be 200s followed by washing time of 100s. then…

                          calendar

                          09 Feb 2022 09:46 AM IST

                            Read more

                            Week -2

                            Objective:

                            (1)Make a Simulink model of Doorbell using solenoid block with the following details: conditions:Create a situation where the switch is closed for 2 seconds and then released.   Block used: Solenoid Battery PS Simulink converter Switch Pulse generator Ideal translational motion sensor Mechanical translational…

                            calendar

                            05 Feb 2022 06:58 AM IST

                              Read more
                              Showing 1 of 20 projects